HomeMy WebLinkAboutARB202000024 Correspondence 2020-07-01Patricia Saternye
From:
Gregg P. O'Donnell <OdonnellGP@stanleymartin.com>
Sent:
Wednesday, July 1, 2020 4:53 PM
To:
Patricia Saternye
Cc:
Scott Collins; Jeremy W. Swink
Subject:
[ responses and attachments ] Spring Hill Village ARB
Attachments:
Spring. Hill.Villag e.50-60.Elev.Fro nt.2020-06-19.pdf;
Spring.Hill.Village.095-100.Elev.Front.Side.2020-06-29.pdf;
Spring.Hill.Village.089-094.Elev.Front.Side.2020-06-29.pdf;
Spring.Hill.Village.084-088.Elev.Front.Side.2020-06-29.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Paty,
Good afternoon. We really appreciate you delving into these quickly and providing comments. My responses to your
comments are below and additional and revised drawings are attached. Let me know what follow-up questions you
have.
I hope you and your loved ones are all doing well, and that you'll have a relaxing and enjoyable holiday weekend!
Thanks,
Gregg O'Donnell
Land Acquisition Manager
STANLEY MARTIN HOMES
404 People Place, Suite 303, Charlottesville, VA 22911
OdonnellGP(a)StanleyMartin.com Mobile:434.989.7206
Stan leVMartin.com
Office: 434.975.7445 ext. 306
From: Patricia Saternye <psaternye@albemarle.org>
Sent: Wednesday, July 1, 2020 11:02 AM
To: Gregg P. O'Donnell <OdonnellGP@stanleymartin.com>
Cc: Scott Collins <scott@collins-engineering.com>
Subject: RE: [EXTERNAL] RE: [ Spring Hill Village ARB ] final files
Gregg,
Good morning.
I've done the first glance at all of the items submitted last Tuesday for Spring Hill ARB2020-24 and I had some
questions and a request for missing items:
1. The front elevations (comment #6A) for units 50 through 60 do not appear to be in the items submitted. Could
you please submit them or clarify why you thought they were not necessary?
GPO: Attached, it was included in the hardcopies delivered to the County, sorry if it was missed otherwise..
2. In the ARB meeting on May 18th I thought it was stated that the roof terraces would not be allowed options for
the units directly on the Entrance Corridor (84-100). However, the front elevations for units 95 through 100 (as
well as the previously submitted front elevations for units 84 through 94) still include the roof top terrace
option. Please officially state in an email that roof top terraces will not be an allowed option on units 84 through
100 or specify that I misinterpreted something stated in the ARB meeting and that the option will be allowed.
GPO: 1 don't recall this discussion and it isn't memorialized in the Comments. However, the rooftop terrace is an
option on the rear elevations of the units, not the front. See attached — revised front elevations for Lots 84-100.
3. Is it correct that the front elevations for units 84 through 94 will be identical to the elevations you submitted
prior to the last ARB meeting? Those were not included in this submittal, even though 95 through 100 were, so 1
just want to make sure there is nothing missing or misunderstood.
GPO: they are the same elevations but have been revised to remove the rooftop terrace on the front elevations.
The attached drawings are correct.
4. In reference to the two exhibits submitted with pictures of typical mechanical unit screening:
a. Is it correct that the pictures in item #4A are redundant to the pictures on the section page of item
#4B? If so, should 1 just ignore item #4A?
i. GPO: Yes.
b. Please clarify why the mechanical units shown on the first page of exhibit #4B, and in the left picture, are
not fully screened. One mechanical unit has no screening at all and the other is still mostly visible from
the road.
i. GPO: These images depict the color, size and style of the unit screening used and their overall
appearance in communities. When the unit screening shown is combined with landscaping,
HVAC units will be screened from visibility along the EC.
c. Please clarify why the equipment shown on the second page of exhibit #4B shows no screening. 1 do not
see how this is demonstrating that the equipment will be screened.
i. GPO: These images depict the color, size and style of the unit screening.
Also, please note that because of comment #27 the resubmittal has to go back to the ARB during a meeting for
discussion.
We have tentatively penciled this project in for 4 20 2020, but my check of the submittal items today is to ensure we
have everything needed prior to the staff review required prior to that meeting.
So, if possible please forward me the items, and information, specified above soon so that you can keep the agenda
slot for Spring Hill on that date.
Thanks (D.
Be well,
Paty Saternye
Senior Planner
Community Development
U
iit{-
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternve@albemarle.org
www.albemarle.org
From: Gregg P. O'Donnell <OdonnellGP@stanleymartin.com>
Sent: Monday, June 22, 2020 2:17 PM
To: Patricia Saternye <psaternve@albemarle.org>
Subject: RE: [EXTERNAL] RE: [ Spring Hill Village ARB ] final files
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Paty — I appreciate the follow-up, and the reminder! I'll submit hardcopies of my files; I'll verify (remind!) Scott to do the
same.
Many thanks,
Gregg O'Donnell
Land Acquisition Manager
STANLEY MARTIN HOMES
404 People Place, Suite 303, Charlottesville, VA 22911
OdonnellGP(cDStanleyMartin.com 434.975.7445 ext. 306
Stan leyMartin.com
Mobile: 434.989.7206
#GIIWINGTUESDAYNOW
Support Big Brothers Big Sisters during the COVID-19 rrisis,
From: Patricia Saternye <psaternye@albemarle.org>
Sent: Monday, June 22, 2020 2:13 PM
To: Gregg P. O'Donnell <OdonnellGP@stanleymartin.com>
Subject: [EXTERNAL] RE: [ Spring Hill Village ARB ] final files
Gregg,
Thank you for the items Q.
I hope you are doing well under the circumstances.
Some clarifications on what you are submitting for review.
Question 1: At least from file naming it does not appear that the attached items include a revised site plan. Will Scott
be including that in the upload of files you mentioned?
Question 2: To the best of you knowledge, once Scott provides the site plan, is it your understanding you have will have
submitted everything that is needed to address all of the comments?
Also, please note, although we appreciate having the digital copies one hard copy of each item should also be
submitted (to may attention) unless it is something we previously said a hard copy would not be needed.
Question 3: Is 1 set of hard copies (both architectural and site plan) already being delivered to the Community
Development front desk?
Be well,
Paty Saternye
Senior Planner
Community Development
f�
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.org
www.albemarle.org
From: Gregg P. O'Donnell <OdonnellGP@stanleymartin.com>
Sent: Monday, June 22, 2020 12:01 PM
To: Patricia Saternye <psaternye@albemarle.org>
Subject: [ Spring Hill Village ARB ] final files
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Paty,
Good day! I hope you had an enjoyable weekend with your loved ones!!
See attached the revised files for this project, including the checklist we used to manage things. Scott's team uploaded
these to Laserfiche, I believe.
Thanks for your work on this and let me know if you have any questions.
Have a great week,
Gregg O'Donnell
Land Acquisition Manager
STANLEY MARTIN HOMES
404 People Place, Suite 303, Charlottesville, VA 22911
OdonnellGP(a'DStanleyMartin.com 434.975.7445 ext. 306
Stan leyMartin.com
Mobile: 434.989.7206