HomeMy WebLinkAboutWPO201900058 Request to Establish A Bond 2020-03-03 Atom'Re the DQ,Iv AI ( �3��
Date
te Received: '2 (C � (roy Fee Psid: S — �c`�
Received In: j=
®_-
Intake: Forward to Management Analyst
REQUEST TO ESTABLISH A BOND
APPROVED PLAN #WPO-2019-00058
PROJECT NAME: South Rivanna WTP Expansion and Improvement Project
(As listed on the approved plan)
All parcels in the project, including any off-site work if easements are not provided, and current owners. Use a
separate sheet if more owners are required. Owner and tax map information must be correct,and plans must be
approved prior to bond estimates being prepared.
TAX MAPs/PARCELs: 45-68B OWNER'S . Rivanna W & ewer Authority
SIGNATURE: _ ate: -/�cS/-c)
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
NOTE: If ownership of the property is in the name of any type of legal entity or organization
including, but not limited to the name of corporation, partnership, limited liability company,
trust, association, etc., documents acceptable to the County must be submitted certifying that
the person signing above has the authority to do so.
The requested estimates are;
O VESCP Erosion & Sediment Control per Water Protection Ordinance section I 7-207; $0 fee
• VSMP Erosion and Sediment Control, Stormwater Management and Mitigation per Water
Protection Ordinance section 17-208; $250 fee required
O Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435;
& Water& Sewer per Subdivision Ordinance section 14-435; $269 fee required
A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide
contact information.
EMAIL: sschiller@rivanna.org
OR REGULAR MAIL ADDRESS:
Revised 6/20/2014, 11/3/2015