HomeMy WebLinkAboutSUB202000112 Review Comments Final Plat 2020-07-07County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
434-296-5832
Memorandum
To: David Jordan
From: Christopher Perez, Senior Planner
Division: Planning
Date: July 7, 2020
Subiect: SUB202000112 Rio Vista LLC - Final Subdivision Plat
The County of Albemarle Planning Division will grant or recommend approval of the Subdivision Plat referenced above once the
following comments have been addressed: [Each comment is preceded by the applicable reference, which is to the
Subdivision/Zoning Ordinances unless otherwise specified.]
1. [Section 15, 14-302(B)(5)] Zoning. The parcel is zoned R-4. Development rights are not applicable to this zoning
designation. Remove the development rights note (note #8).
2. [14-302(B)(6)] Reservoir watershed. Revise note #9 to state that these properties are not located in a water supply
watershed. While they are located in the Meadow Creek Watershed, this is not a waster supply watershed.
3. [Comment] Remove note #11 and #12, as this plat does not create a new street.
4. [Comment] Throughout the plat utilize the same call out to refer to the lots, currently there are two different terms
being used, Lot 1 & Lot 2, and Lot I & Lot 1B. Revise to only use one call out.
5. [14-312] Existing buildings. Depict and label all existing buildings.
6. [14-302(B)(4)] Places of burial. Provide a statement about the presence of graves or structures marking a place of
burial located on the property.
7. [14-414, 4.11 Public Water. Each lot shall be served by the public water supply. Depict the water line and
waterline easement serving the lots. Based on the plat that preceded this one the waterline runs in the center of Rio
Road.
8. [14-302(B)(10)] Stream Buffers. Shade the WPO stream buffer. Utilize a different hatching than used for the
preserved slopes.
9. [14-316] Approval of entrance onto public streets. Prior to final plat approval submit evidence that the
entrance of the principal means of access for each lot onto the existing public street complies with Virginia
Department of Transportation standards. I recently forwarded the plat to VDOT for review. Once their
review comments are received, I'll forward them to you. If you have already obtained this documentation
please provide it to staff.
10. [14-303(A)] Statement of Consent to Division. Remove the consent to division statement from the County
approval block. Also, revise the owner's consent to division statement to read: "The platting or dedication of the
following described land [insert correct description of the land subdivided] is with free consent and in accordance
with the desire of the undersigned owners, proprietors and trustees, if any. "
If the applicant would like to continue utilizing the previous ordinance language: `Any reference to future
potential development is to be deemed as theoretical. All statements affixed to this plat are true and correct to the
best of my knowledge. " Please utilize it as a separate note on the plat. Revise.
Comments attached for the following reviewers:
Engineering — John Anderson
Fire and Rescue — Shawn Maddox
Comments for the following reviewers will be forwarded once received:
ACSA — Richard Nelson
VDOT — Adam Moore
Staff has provided references to provisions of Chapter 14 of the Code of the County of Albemarle. The Code is kept
up to date by the County Attorney's office. The Code may found on the County Attorney's website which may be
found under "Departments and Services" at Albemarle.org. In accord with the provisions of Section 14-229(B) of
Chapter 14 of the Code if the developer fails to submit a revised final plat to address all of the requirements within
six (6) months after the date of this letter the application shall be deemed to have been voluntarily withdrawn by the
developer. Please contact Christopher Perez in the Planning Division by using cnerez(a)albemarle.org or 434-296-
5832 ext.3443 for further information.
Phone (434) 296-5832
Project:
Project file number:
Plat preparer:
Owner or rep.
Plan received date:
Date of comments:
Reviewer:
Project Coordinator:
VIRGlN1P
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Fax (434) 972-4126
Final Plat review
Rio Vista LLC, Final
SUB2020-00112
David Jordan, Commonwealth Land Surveying, LLC
1484 Greenbrier Place, Charlottesville, VA 22901 [ dave(a-vacls.com ]
[ biamison(a)roudabush.com]
Rio Vista LLC, P.O. Box 5787, Charlottesville, VA 22905
[ hkhpropertieskgmail.com ]
15 Jun 2020
16 Jun 2020
John Anderson
Christopher Perez
Engineering has reviewed the final plat and offers the following comments.
1. Eliminate Note 7. Note 14 is sufficient, provided it is accurate. Also, item 2, below.
2. Lots I and I contain limited areas (accessible from Rio Road) available for structures or private
entrances located at least 5' beyond 30' prescriptive right-of-way, and yet not located within a stream
buffer, flood zone `AE', existing easement, preserved steep slopes, and with required minimum building
separation. These areas are estimated to be —2,000 sf and 2,800 sf, max., respectively. Geometry required
of entrances onto Rio Road complicates viability of residential construction on Lots I and I (Also, item
6, below). Note 14 (review item 1) states each lot is sufficient to contain a building site that complies with
Sec. 4.2.1 of the Albemarle Zoning Ordinance. [14-302.A.9 ] Please depict the `location, area, and
dimensions of a building site on each proposed lot complying with the requirements of section 18-4.2.' If
plat is approved, residential construction will be severely constrained once lot entrance geometry, on -site
critical resources (FEMA flood zone, slopes, stream buffer), existing easements, and minimum building
separation requirements are applied to (overlay) the proposed subdivision. Also, item 4, below.
3. [ 14-304, Request to disturb steep slopes.] It appears that the proposed subdivision will likely require
disturbing steep slopes to provide sanitary sewer or water (lateral) connections to residential structures.
Provide plat Note stating `Water, sewer, energy, and communications distribution facilities are a by -right
use on preserved slopes, but that to the extent distribution facilities are established on preserved slopes, the
preserved slopes should be preserved to the maximum extent practicable consistent with the intent and
purpose of the steep slopes overlay district.'
4. Provide entrance/turnaround schematics that reflect standard entrance geometry for a private entrance onto
a public road for each lot (IA/1B); recommend on -site ability to maneuver a vehicle on each lot such that
vehicles may exit in a forward and not reverse direction. Rio Road at this location does not admit
possibility of safe exit from either lot in a reverse direction. Also, review item 6, below.
Engineering Review Comments
Page 2 of 2
M n
x m
w
w�
�s
.
I
IY
LCVr 1A Z!
rr
��uJ w
y I
14,983 SQFT
0.344AC
1,959 Si )♦
Ir
R
¢
(L
eLL
EW-
25.0G^
16.55'
� D W ?
IS
N 82"59'12" W 23 .55' (TOTALS 1
Y?
I
'C HW-4 n
I
16'X2 'ACSA
a
WATER EASEMENT
I¢ rn
INST 202000W2097
8,797 S(
Is
13,7405 SQFT
0316 AC
5. [14-312] Show location of all existing buildings on Lot 1 (to be subdivided).
(Note: Existing house is shown on plat at bk-pg. 5280-472.)
G' PRESCRIPINE EISF 8rff I .
25.00'
W ,EW
. 15X25
MGGIFlEO
S.S. ESW
GRAVE
^! DRIVE
iMP 51-
LL kgksi.E'
L L'�L
$
N SSW N.
s
s'
8. ' -
n�„
U EMXRNG RY -
m SAN, SM
+ SEE
0 B49
CRS 1.5. 3 $P,1GE RES[RyEp
MR 26
1: 0.65 ACRES FOR FE SEW
GE: 3.492 ACR
L7 s LOT 1
SµEp L5. 2 25,728 S.F. IF.
I,
REVISEI
MN ESW.
TMP 81-1
$�
.,_
0.65 ACRE
-
'ORVEY OF y '_
191 a
LOT 1
', 'ARGINIA
JANUARY 25, 2019.
i REVISED: JANUARY 6. 2020 VII(
119, 7019
" 2019 \6xrs\zmaU61-1131.E
I, 2019 SHEET 2 01
6. [14-316] Prior to approval, coordinate with VDOT. Provide evidence that the entrance (principal means of
access) for each lot onto Rio Road complies with VDOT standards, including sight distance and entrance
spacing.
Please feel free to call if any questions: 434.296-5832-x3069.
Thank you
SUB202000112 Rio Vista LLC FPT 061620
Review Comments for SUB202000112 lFinal Plat 1-1
Project Name: RIO VISTA LLG - FINAL
Date Completed: Monday, June 29, 2020 DepartmentlaivisionlAgency: Review Status:
Reviewer: Ishawn Maddox Fire Rescue No Objection
Fire Rescue has no objections_ SNM
Page: County of Albemarle Printed On: 10710712020