Loading...
HomeMy WebLinkAboutSDP201800003 Letter of Revision 2020-07-10 (2)SHIMP ENGINEERING, P.C. Design Focused Engineering July 9, 2020 Paty Saternye County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 RE: SDP 201800003 Hansen Road Church Letter of Revision 2 Dear Paty, Please find the new submission of the Letter of Revision #2 for TMP 78-73AB for review. The letter of revision includes the following changes: 1. Relocation of two handicap spaces and associated signs from the front of the church to the nearest spots east. New location requires one new CG-12. 2. Updated parking calculations due to handicap spaces moved. Resulting changes are three less parking spaces. Minimum required parking still met. 3. The pedestrian path along Rolkin Road is relocated adjacent to the curb in areas where curb is added with the site plan. No changes to the path were made east of the Rolkin Road site entrance. 4. Grading is slightly revised along the new pedestrian path to remove any specification of a drainage Swale. 5. Proposed stairs off of Hansen Road were removed from the plans. 6. Three shrubs near sanitary manhole SX1 were relocated approximately 8 feet up Hansen Road. 7. Sanitary lateral from the church was relocated to connect near the existing sanitary manhole SX1. 8. Proposed storm structure Al was relocated approximately 50 feet down Hansen Road due to existing storm pipe location. 9. Drainage maps and LD-204 calculations were updated with the relocation of storm structure Al. 10. A retaining wall of maximum 5.5 feet height is now proposed along Hansen Road near the church building. 11. The landscaping island in the looped drop off area was removed. One tree and ten shrubs were relocated to the sloped area between the drop off loop and the parking area east of it. No change in total proposed trees or shrubs. 12. One additional stair was added along the sidewalk at the top of the looped drop off area so that it would match the other side. 13. The sidewalk around the looped drop off area was extended to the eastern parking lot. 14. This sidewalk extension caused the relocation of two shrubs. 15. New bollards were added along the stairs off of Rolkin Road. These bollards contain lights which are 1600 lumens. The locations of the added lights are shown on the updated lighting plan. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com 16. Street trees along Rolkin Road were relocated behind the adjusted pedestrian path. Others were relocated closer to the revised path. 17. A note has been added to the cover sheet under "Required Improvements." 18. Trees between storm structure C2, storm structure C3, and the retaining wall were shifted to provide greater spacing. 19. A bumper block was added to the handicap parking space in front of the church. The bumper block detail is included on the grading plan sheet. If you have any questions, please do not hesitate to contact me at kendrakshimp-en in�g com or by phone at 434-227-5140. You can also contact Justin Shimp at Justin(cr�,shimp-en ing eering com. Best regards, Kendra Patrick Shimp Engineering, P.C. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com