HomeMy WebLinkAboutSDP202000024 Correspondence Final Site Plan and Comps. 2020-07-08ENciWEERS
SURVEYORS
PLANNERS
ASSOCIATES
July 8, 2020
Ms. Tori Kanellopoulos
County of Albemarle
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, VA 22902-4596
Re: Stonefield Block D1 FSP
WWA Project No. 219040.04
Dear Ms. Kanellopoulos:
We have received the County comments dated June 25, 2020 for the Stonefield Block D1 Final
Site plan. Our response is as follows:
Planning
2. 18-4.11.4 Easement conflicts. It appears there may be easement conflicts with the existing
gas easement and existing power easement. Contact Charlottesville Gas and Dominion
Power directly to ensure building is not conflicting with easements. Attached is additional
guidance for Dominion Power easements.
b. Comment: REV 1: Note that Dominion Power may require an easement around the
relocated transformer. Ensure coordination with Dominion. DB4160, PG199
indicates that the transformer is property of Dominion.
Response: Noted. The design team is working directly with Dominion Power on
the transformer locations and associated easements.
c. Comment: REV 1: Provide a letter from the gas line easement holder (signed)
indicating their approval of the improvements shown within the easement.
Response: The gas line and associated easement will be relocated as shown on
the revised site plans. The design team is working directly with Charlottesville
Gas on the location and associated easement.
7. 18-4.17 Lighting: Submit alighting plan with the final site plan that meets the requirements
of 18-4.17 and ARB requirements. Indicate if there are any new lights added. Cutsheets for
new lights are required.
b. Comment: REV 1: Show additional foot candle measurements along Inglewood
Drive, closer to the existing townhouses. Ensure that spillover adjacent to the
townhouses is 0.5 foot candles or less.
Response: Additional foot candle measurements for Inglewood Drive are
shown on sheet L5.0 Photometric Plan.
c. Comment: REV 1: Clarify which lights are existing and which are new.
Response: Existing lights are labeled with an `X'. All other lights are
proposed.
968 Olympia Drive, Suite 1 ■ Charlottesville, VA 22911
Telephone (434) 984-2700 ■ Fax (434) 978-1444
Charlottesville 0 Lynchburg
8. 18-32.5.2 Contents of an initial site plan and 18-32.6.2 Contents of a final site plan:
b. Note that the ownership information, boundary lines, DB/PG, and Tax Map
Parcel may need to be updated, based on the status of SUB201900150 and if this
parcel is subdivided.
a. Comment: REV 1: SUB201900150 is under review, revised as both a
subdivision plat and easement plat. Ensure ownership information on the
final site plan matches after SUB201900150 is approved and recorded.
Response: The ownership of the of the new parcel will remain the same
as the parent parcel with the proposed subdivision plat.
e. Include the signed/approved resolution for the Special Exception approved by the
Board of Supervisors on February 5, 2020. Ensure the conditions are being met.
The resolution is attached for reference.
a. Comment: REV 1: Partially addressed. Show how Condition 3(b) is being
met. This should show elevations/stories of each side of the building, to
ensure this requirement is being met.
Response: Building elevations have been included with this submittal as
requested.
9. 18-32.6.2/18-32.7.4.2/18-32.7.5.3 Easements:
b. All new and revised easements must be shown on an easement plat, which must be
approved prior to final site plan approval. Updated covenants/maintenance
documentation must also be provided.
a. Comment: REV 1: Show and label all existing easements, including ACSA
easements.
Response: The existing easements are shown and labeled on the final
site plan.
b. REV 1: Previous application SUB201900150 has been resubmitted as an
easement plat and subdivision plat. Review comments on the plat will be sent
separately. Once recorded, include DB/PG for all new and revised easements
on the final site plan.
i. Comment: Ensure all new and revised easements are shown. For
example, the new SWM easement around the filterra is not shown or
labeled.
Response: All new and revised easements are shown on the final site
plan.
ii. Comment: There appear to be other discrepancies between the site plan
and plat as well. For example, the plan shows the access easement of
District Avenue being adjusted, while the plat shows the access easements
of Inglewood and Bond being adjusted. Ensure both submittals match.
Response: The plans have been revised accordingly.
10. 18-32.5.5118-32. 6.3118-32. 7.3 Parking structures:
968 Olympia Drive, Suite 1 ■ Charlottesville, VA 22911
Telephone (434) 984-2700 ■ Fax (434) 978-1444
Charlottesville ■ Lynchburg
Page 2of5
b. Include a note that the 18-32.7.3 requirements are met: mechanical equipment is
screened/not visible; air handler emissions are away from adjacent residential
uses; and the structured parking is designed so that light is not shining outside the
structure.
a. Comment: REV 1: Partially addressed. Requirement 32.7.3(a) requires that
mechanical equipment be screened from public view, not just the Entrance
Corridor. Revise Note 3 on Sheet 1 to meet this requirement: Mechanical
equipment or other utility hardware on the roof, ground, or building shall be
screened from public view to the reasonable satisfaction of the agent with
materials harmonious with the building or they shall be located so as not to
be visible from public view.
Response: The note has been revised accordingly.
15. Additional applications: The following applications and approvals are required prior to final
site plan approval:
2. 18-32.7.4.2 and 18-32.7.5.3: Easement Plats: All new and adjusted easements
must be shown on an easement plat, which must be approved prior to final site
plan approval, and must match the final site plan. See Engineering comments on
required SWM easements. One easement plat may be submitted for all non-ACSA
easements, however Engineering has separate deed requirements for SWM
easements.
a. Comment: REV 1: Review of SUB201900150 (now an easement and
subdivision plat) is in progress and review comments will be sent separately.
Response: Noted.
3. Architectural Review Board: A Certificate of Appropriateness from the ARB is
required prior to final site plan approval. Coordinate directly with Margaret
Maliszewski (mmaliszewski(aalbemarle.org).
a. Comment: REV 1: ARB review is in progress. See ARB comments below.
Response: Noted. The ARB comments have been addressed. The
applicable sheets are provided with the site plan.
4. 18-32.7.4.1: Approval of a VSMP Plan is required prior to final site plan
approval. See Engineering comments. Coordinate directly with John Anderson
Uanderson2(a),albemarle. orgy.
a. Comment: REV]: VSMP/WPO review is in progress.
Response: Noted. Please refer to the VSMP comment response letter.
Inspections
1. Comment: REV 1: Total parking for accessibility must be in compliance with ICC ANSI
A117.1-09. Verify conditions at
https: //codes. iccsafe. org/contentlVCC2015P2/chapter-11-
accessibility#VCC2015P2_Chll_Sec1106 and provide documentation of entire site due to
numerous changes.
Accessible parking is not aligning with requirements:
968 Olympia Drive, Suite 1 ■ Charlottesville, VA 22911
Telephone (434) 984-2700 ■ Fax (434) 978-1444
Charlottesville ■ Lynchburg
Page 3of5
Response: The parking for accessibility for Stonefield is in compliance ICC ANSI
A117.1-09. Please note the parking calculations have been revised to encompass only
the proposed improvements as requested by Zoning.
2. Comment: REV 1: Provide accessible parking detail along with accessible signage.
Response: The details have been added to the plans as requested.
Zoning/Parking Reduction Request
5. Comment: See attached letter dated June 23, 2020. Parking reduction has been approved by
Zoning. The following is a summary of the remaining comments:
On Sheet 1, Show the parking requirements for this site:
• 9 spaces for retail
• 370 spaces for residential
• 379 total
On Sheet 1, Include the following note: "Parking reduction approved by Zoning, per letters
dated February 26, 2020 and June 23, 2020. Total parking provided: 347 spaces. "
Remove other parking information on Sheet I of the site plan for other areas of Stonefield.
This information was needed for Zoning to make a determination; however it is not
necessary to include it on the final site plan.
Response: The cover sheet has been revised accordingly.
Engineering
1. Comment: (Rev. 1) Partially addressed. As follow-up: Edit Note 8 to read SDP2011-00047
rather than WPO 2011-00047. Also, New (Rev. 1) this page (list WPO2020-00016).
Response: The note and cover sheet have been revised accordingly.
5. Notes:
a. Comment: WPO2011-00055 Amendment approval is required prior to FSP
Approval. (FSP /Rev. 1) Comment persists. (WPO2011-00055 Amendment is
assigned WP0202000016).
Response: Noted.
b. Comment: SWM Facility /Facility Access) Easement Plat recordation is required
prior to WPO2011-00055 Amendment approval. Applicant to provide Planning
/Engineering circuit court deed bk.-pg. ref. to recorded easement. Engineering
will format deed of dedication of easement once plat review comments are
addressed (once plat date of last revision is known). (FSP) Addressed bk. pg.
4135-223. (Rev. 1) UPDATE: See WPO202000016 SWM Plan review items 4.h.,
and 6.
Response: Noted.
c. Comment: A Stormwater Facility Maintenance Agreement is required prior to
final WPO2011-00055 Amendment approval. Albemarle records Agreement for
968 Olympia Drive, Suite 1 ■ Charlottesville, VA 22911
Telephone (434) 984-2700 ■ Fax (434) 978-1444
........................................................................................................................................................................................
Charlottesville ■ Lynchburg
Page 4of5
any new SWM Facilities, once executed. (Albemarle formats Agreement.) If there
are no new SWM Facilities; that is, if only SWM are facilities shown on
WPO2011-00055, then Albemarle requests deed bk.-pg. ref. to recorded
Agreement with WPO2011-00055 Amendment Application /submittal. (FSP)
Addressed. See b., above. (Rev. 1) UPDATE: See WP0202000016 SWM Plan
review item 2.b.
Response: Noted.
24. Comment: C-12: Storm profile 46 thru 46.8 shows 18 " HDPE downstream of 24 " DIA pipe.
Increase receiving pipe diameter. (Rev. 1) Partially addressed. Applicant: `The 18 " HDPE
pipe in question discharges to the biofilter on District Ave. Storm manhole 46.1 upstream of
the pipe is a flow control structure and is designed to allow low flows to the biofilter and
pass larger storm events to the North UGD system.' As follow-up: Review profile, C-12.
Revise graphic portion or labels for consistency: identical INV OUT but different elevations
in graphic portion of profile.
Response: The graphic has been revised accordingly.
25. Comment: New (Rev. 1) Revise C-1 sheet index to list parking garage layout, landscape and
lighting plans.
Response: The sheet index has been revised as requested.
We trust that these revisions adequately address your concerns. Please do no hesitate to contact
us if you have any questions.
Sincerely,
WW Associates, Inc.
John D. Beirne, Jr., P.E.
Senior Project Engineer
968 Olympia Drive, Suite 1 ■ Charlottesville, VA 22911
Telephone (434) 984-2700 ■ Fax (434) 978-1444
Charlottesville ■ Lynchburg
Page 5 of 5