Loading...
HomeMy WebLinkAboutSUB202000055 Review Comments Road Plan and Comps. 2020-07-175 N ?'h �IRGRTF COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: Proffit Road Townhomes North Project file number: SUB202000055 Plan prepares Shimp Engineering, PC [keane@shimp-engineering.com] Owner or rep.: Albemarle Land Development, LLC Brent Hall [brent@hallsautobodyinc.com] Date Received: 23 March 2020 Rev. 1 Received: 05 June 2020 Date of comments: 29 April 2020 Rev. 1 Comments: 17 July 2020 Keane, We have reviewed the above referenced plans and have the following comments: Engineering (Emily Cox) 1. Road B must terminate at Road D to match the approved ZMA20180006. Also interconnectivity must be shown as illustrated on the same approved ZMA. Rev 1:Comment not addressed. 2. Provide storm calculations to go along with the profiles shown on sheet C13. Rev. 1: Comment addressed. 3. Topography is older than a year. Please provide a date in which it was field verified. Rev. 1: Comment addressed. 4. Show the managed slopes on the property. Rev. 1: Comment addressed. 5. Ensure parallel parking spaces meet requirements (9ftx20ft). Rev. 1: Comment addressed. 6. Rev. 1: Velocity in storm pipe shall not exceed 15 ft/s. 7. Rev. 1: The trench drain should tie in with a manhole so there is a way to inspect or service the system. 8. Rev. 1: [Sheet C61 Trees should be ideally located at least 5 ft from a storm pipe. They cannot be centered on the pipe. Planning (Daniel Butch) 1. Transportation Planning: For pedestrian interconnectivity provide crosswalk ramps extending from sidewalk on Road D in front of lot 29, additionally crossing Road A in front of lot 45 to lot 31. Rev. 1: Proffered road improvements and right-of-way reservations from ZMA2018-6 on Proffit Rd should be shown on site plan. The recommended improvements from the TIA for a 200 feet turn lane with a 200 feet taper is warranted for the proposed site entrance. Planning (Mariah Gleason) 1. See attached comment letter dated 4/29/2020. Rev. 1: See attached comment letter dated 7/8/2020. Engineering Review Comments Page 2 of 2 VDOT (Adam Moore) 1. See attached comment letter dated 4/14/2020. Rev. 1: See attached letter dated July 7, 2020. Fire Rescue (Shawn Maddox) 1. No objection. ACSA (Richard Nelson) 1. Currently under review per email dated 4/23/20. Rev. 1: Still under review per email dated 7/9/2020. GIS (Brian Becker) 1. The private roads designated "Private Road A", "Private Road B", "Private Road C" and "Private Road D" each require road names, per the Albemarle County Road Naming and Property Numbering Ordinance, Sec. 7-200, Part B (page 2 of the PDF): "It is intended by this article that all roads within the county which serve or are designed to serve three (3) or more dwelling units or business structures shall be named..." Please provide this office at least three alternative road names for review, in case your first choices are not acceptable. The Albemarle County Master Road Names Directory can be accessed at: http://www.albemarle.org/albemarle/upload/images/webnps/roads/. 2. Rev. 1: The provided road names Zelkova Drive, Corner Oak Drive, Hall Of Oaks Drive and Flat Branch Lane are acceptable road names. Please show them on the submitted plan for approval. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. If you have any questions or concerns, please contact me either by email (ecox2@albemarle.org) or by phone at 434-296-5832 ext. 3565. Sincerely, Emily Cox, P.E. Civil Engineer II 00UNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 229024596 (434) 296-5832 Memorandum To: Emily Cox, Albemarle County Engineering Division (ecox2@albemarle.org) From: Mariah Gleason — Senior Planner Division: Planning Services Date: April 29, 2020 Revision 1: July 8, 2020 Subject: SUB202000055 Proffit Rd Townhomes North — Road Plans The County of Albemarle Planning Division will recommend approval of the plat referenced above once the following comments have been satisfactorily addressed. The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review. [Each comment is preceded by the applicable reference to the Albemarle County Code.] 1. [32.5.2(a)] Application ID. Include the application ID on the Cover Sheet (SUB202000055). Rev. 1: Comment addressed. 2. [32.5.2(a)] Tax Map Parcel. Provide the unabbreviated tax map and parcel number in at least one place in the plan. Staff suggests providing this information on the Cover Sheet. Rev. 1: Comment addressed. 3. [32.5.2(a)] Zoning notes. Include in the zoning notes that this parcel is subject to ZMA2018-06 and its associated proffers. Rev. 1: Comment addressed. 4. [ZMA2018-06] Proffer #2. Show the right-of-way improvements along Proffit Rd per the plan view map shown on Sheet 3 and the cross-section shown on Sheet 1 of the approved application plan. Rev. 1: Comment remains. During the review of ZMA2018-06, road improvements to Proffit Road were identified to mitigate the traffic impacts and increased vehicular trips associated with the up -zoning of this parcel. The resulting proffer (Proffer 2) will need to be provided as part of the site/subdivision plan approval. The County would be happy to meet to discuss this comment if the applicant desires. 5. [ZMA2018-06] Internal street network. The internal street network shown on the plan is not in alignment with the application plan and proffers associated with ZMA2018-06. To adhere with the approved application plan, Road B must terminate at its intersection with Road D. Rev. 1: Comment remains. Staff acknowledges the applicant's response, however, as ZMA2019-10 has not been approved, staff cannot approve the extension of Road B beyond the intersection of Road D, since the design is inconsistent with the approved ZMA (ZMA2018-06) for the subject property. Therefore, revise the road plan so Road B does not extend beyond the intersection with Road D. 6. [ZMA2018-06, 32.7.2.2(d-e)] Extension and coordination ofstreets. County Code requires all streets within a development to extend and be constructed to the abutting property lines. To meet this requirement: a. Show construction of proposed Road D up to the property line of TMP 32A-2-113 and secure any off -site construction or grading easements that may be needed to allow the construction of Road D up to the property line. OR b. Provide documentation to demonstrate that the abutting landowner will not grant the easement, show construction of proposed Road D as close to the abutting property line as possible, and grant the necessary easement area to allow the future extension/connection of Road D to this parcel boundary in the future. Note: The easement plat will need to be submitted, reviewed, approved, and recorded prior to final site plan approval. Revision 1: The comment response letter from the applicant indicates that documentation from the abutting landowner, consistent with Comment 6b, will be provided to staff. The aforementioned documentation will be needed before this comment can be resolved. In addition, provide information to demonstrate that the road is being built as close as possible to the abutting property line and that a future connection can be built inside the right-of-way on the subject property. If not, easements outside of the proposed right-of-way may be needed to ensure this segment of roadway can be built in the future. [32.5.2(b), 4.12] Parking. a. The required parking for this development is 122 spaces. Per Sec. 4.12.6, this development is required to provide one guest parking space per four units (54/4=14 spaces). With this addition, the required parking for this development is 122 spaces (108+14). Review and revise the Parking Schedule on the Cover Sheet accordingly. Rev. 1: Comment addressed. b. There is a discrepancy in the proposed widths of on -street parking spaces. The plan maps indicate spaces will have a width of 8ft while the ROW Cross Sections provided on Sheet CIO indicate on -street parking spaces will have a width of 9ft. Please review and revise to align this information and provide on -street parking space widths of 9ft, it rdance with Sec. 4.12.16. Rev. 1: Comment addressed. c. [New] The driveway widths for Lots 23-30 will need to be increased to provide at least the minimum parking space envelope of 9 feet wide and 18 feet long, as described in Sec. 4.12.16. 8. [32.7.9.4] Landscape Plan a. Provide a scale bar. Rev. 1: Comment addressed. b. Since this is not an infill development, where existing utilities are already in place, street trees will be required on both sides of the entire lengths of Road A and Road B. Revise the Landscaping Plan to include street trees in front of Lots 50-45 and on the eastem-facing sides of Lots 37-38. Rev. 1: Thank you for providing continuous street trees, however, some tree placements may create conflicts with proposed storm sewer lines. Revise the landscaping plan to provide adequate separation between these two plan elements. Planning staff will defer to Engineering on guidance related to the storm sewer line separation. c. All required street trees must be provided with this site plan, not a future site plan. Please revise the Landscaping Plan accordingly. Rev. 1: Comment acknowledged by applicant in the comment response letter. d. Remove Note 5 from the Landscape Plan. The scheduled street trees are being used to meet the tree canopy requirement for this development. As such, tree species cannot be substituted since different species have different canopy covers. Rev. 1: Comment addressed. e. Is the last tree species provided in the Interior Street Tree Schedule supposed to be a Nyssa sylvatica (black gum) or a Quercus palustris (pin oak)? The schedule currently specifies "Nyssa sylvatica (pin oak)", which appears to be a clerical error. Rev. 1: Comment addressed. f. [New] The Landscape Plan map indicates 12 medium trees are being provided along Profiit Rd, however the planting schedule table and landscaping notes indicate that 11 trees are being provided here. Revise and align the map, planting schedule, and landscaping notes. g. [New] Including the adjusted tree quantity for the street trees along Profit Rd, staff is only able to confirm a 1.52 acre (66,409sf) tree canopy being provided by the revised plan, however the Landscaping Plan notes a 1.53 acre canopy is being provided. While the canopy requirement is being met, there is likely a rounding difference between the calculations of the applicant and staff. Please review and revise as needed. 9. [32.5.2(i)] Street names. Provide street names for new roads. Proposed names will need to be reviewed/approved by E911 prior to final site plan approval. Rev. 1: Comment addressed. 10. [32.5.2(m)] Nearest intersection. Adjust the nearest intersection distance labels on Sheet C3 so they are on top of the hatched pattem(s). Current layering makes it difficult to read these labels. Rev. 1: Comment addressed. 11. [32.5.2(a)] North. Review and revise the north arrow on Sheet C8. Rev. 1: Comment addressed. 12. [Comment] This road plan application is only for the review/approval of improvements in the right-of-way. All other information and improvements outside of the right-of-way are being reviewed with site plan application SDP202000028. 13. [New] If not already provided, include a note on the road plan that all proposed right-of-way areas are hereby dedicated to public use. Please contact Mariah Gleason in the Planning Division by using meleason e albemarle.org or 434-296-5832 ext. 3097 for further information. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street (804) 786-2701 Commissioner Richmond, Virginia 23219 Fax: (804) 786-2940 July 7, 2020 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Emily Cox Re: Proffit Road Townhomes North — Site Plan SDP-2020-00028 Review #2 Dear Ms. Cox: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Shimp Engineering, dated 3 June 2020, and find the turn lane requirement has not been adequately addressed from the rezoning ZMA-2018-00006. 7. Turn lane Warrant Analysis V I)OT turn lane warrants were evaluated for the proposed site entrance per the turn lane warrant forms in the V[X)T Road Dcsign Manual. Table 6 below summanzcs the turn lane warrant analysis results. VDOT Road Design Manual turn lane warrant forms are provided in Appendix J. As shown in Table 6, a 200 feet left turn lane with a 200 feet taper Is warranted for the proposed site entrance. The turn lane warrant was dated a year ago and should be updated to include both developments. This office requests a turn lane warrant that encompasses both developments as this will soon be a 4 way inersection. If further information is desired, please contact Max Greene at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. VirginiaDOT.org WE KEEP VIRGINIA MOVING Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency