Loading...
HomeMy WebLinkAboutWPO202000017 Calculations 2020-07-20Project Information: 46 1161* Project Name: Proffit Road Townhomes South StormTecF�- Location: Charlottesville 7.9.20 Date: 7.9.20 OelanNon-RelmNdl-Rec/,arpe Subsurface Stormwater Management`" Engineer: Skimp StormTeCh RPM: JMC MC-4500 Site Calculator System Requirements System Sizing Units Number of Chambers Required 83 each Required Storage Volume CF Number of End Caps Required 10 each Slone Porosity (Industry Standard = 40%) 40 % Bed Size (including perimeter stone) 3,434 square feel Stone Above Chambers (12 inch min.) 12 inches Stone Required (including perimeter stone) 734 tons Stone Foundation Depth (9 inch min.) 9 inches Volume of Excavation 986 cubic yards Average Cover over Chambers (24 inch min.) 24 inches Non -woven Filter Fabric Required (20% Safety Factor) 1136 square yards Bed size controlled by WIDTH or LENGTH? LENGTH Length of Isolator Row 75.5 feet Limiting WIDTH or LENGTH dimension 75 feet Woven Isolator Row Fabric (20% Safety Factor) 207 square yards Storage Volume per Chamber 162.6 CIF Storage Volume per End Cap 108.6 CIF Installed Storage Volume 14,582 Cubic feet Controlled by Length Maximum Length = 75 feet zo' Za (2.13 m) (610.m) MAX. MIN. 24 inches _ 4 rows of 17 chambers F 12 1 row of 15 chambers inches Maximum Length = Maximum Width = 75.5 46.7 feet feet AAA / 1�;(1524mm) B0 9 inches 10m (2540 rum) System Cost* Quantity Cost/Item Total Chambers each 83 $525.00 per chamber $43,575.00 $300.00 End Caps each 10 per end cap $3,000.00 $2.00 Non -woven Filter Fabric square yards 1136 per unit area $2,271.34 Woven Filter Fabric square yards 207 $2.00 per unit area $414.98 Manifold — estimate % of chamber cost ------ 15% of chamber cost $6,536.25 Subtotal $55,797.56 Other Contractor Costs* Quantity Cost/Item Total Stone tons 734 $25.00 per unit volume $18,351.49 Excavation Cost cubic yards 986 1 $15.00 per unit volume $14,784.69 Inlet/Outlet structures number of structures 2 $5,000. per structure $10,000.00 Subtotal $43,136.18 Total Material Cost $98,933.75 Cost per cubic foot $6.82 'This represents the estimated material and site work costs (US dollars) for the project. Materials excluded from this estimate are conveyance pipe, pavement design, etc. It is sways advisable to seek detailed construction costs from local installers. Please contact STORMTECH at 888-892-2694 for additional cost information.