HomeMy WebLinkAboutARB202000077 Plan - Revision 2020-07-20 (7)TABLE 3.35-A
ORGANIC MULCH MATERIALS AND APPLICATION RATES
RATES
Mulches
Per Acre
Per 1000 sq. ft.
Notes
Free from weeds and
Straw or Hay
1- 2 tons (Minimum 2 tons
70 - 90 lbs.
coarse matter. Must be
for winter cover)
anchored. Spread with
mulch blower or by hand.
Do not use as mulch for
Fiber Mulch
Minimum 1500 lbs.
35lbs.
winter cover or during hot,
dry periods. Apply as
slurry.
Cut or shredded in 4-6"
lengths. Air-dried. Do not
Corn Stalks
4 - 6 tons
185 - 275 lbs.
use in fine turf areas. Apply
with mulch blower or by
hand.
Free of coarse matter.
Air-dried. Treat with 12 lbs
Wood Chips
4 - 6 tons
185 - 275 lbs.
nitrogen per ton. Do not use
in fine turf areas. Apply with
mulch blower, chip handler,
or by hand.
Free of coarse matter.
Bark Chips or
Air-dried. Do not use in fine
Shredded Bark
50 - 70 cu. yds.
1 - 2 cu. yds.
turf areas. Apply with mulch
blower, chip handler, or by
hand.
' When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum
rate of 2000 lbs. / ac. or 45 lbs. / 1000 sq. ft.
I Source: Va. DSWC
0
TABLE 3.39-A
ADHESIVES USED FOR DUST CONTROL
Water
Application
Dilution
Type of
Rate
Adhesive
(Adhesive: Water)
Nossle
Gallons/Acre
Anionic
7:1
Coarse Spray
1,200
Asphalt Emulsion
Latex Emulsion
12.5:1
Fine Spray
235
Resin in Water
4:1
Fine Spray
300
Acrylic Emulsion
7:1
Coarse Spray
450
(Non -Traffic)
Acrylic Emulsion
3.5:1
Coarse Spray
350
(Traffic)
Source: Va. DSWC
GRAPHIC SCALE
30 0 15 30 60 120
( IN FEET )
I inch = 30 ft.
nNG BRICK
PATIO
EXISTING 1 STORY
HOUSE
I
SSP ;' TS TO I , I
SF',
x MU PS \ , }fix\ I
\ \ G'y7�o' A\ ' TP
Ilk
DC
sa:6o' arc
I
r
HVAC
100.6T
EXISTING 2 STORY
HISTORIC TAVERN
1612 SF
PROPOSED
2 STORY
ADDITION
979 SF PROPOSED
TERRACE
1 STORY
ADDITION
424 SF
EXISTING
1 STORY
BLDG
230 SF
1�
`bar -_ - _ _ \ � - \ ` � % \ .\ \♦
DIRECTION OF PROPOSED FLOW
SCALE: 1 "=30'
GRAPHIC SCALE
20 0 10 20 40
( IN FEET )
I inch = 20 ft.
NOTE: SEE
80
GENERAL EROSION AND SEDIMENT CONTROL NOTES
NG SHEET BY OTHERS FOR LANDSCAPING PLAN. T 1 z
ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT
CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND .+
SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA U A
REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS (4VAC50-30). W d
ES-2: THE PLAN -APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION z
z
CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK 0
PRIOR TO THE FINAL INSPECTION. THE NAME OF THE RESPONSIBLE LAND DISTURBER MUST BE PROVIDED TO a
THE PLAN -APPROVING AUTHORITY PRIOR TO ACTUAL ENGAGEMENT IN THE LAND -DISTURBING ACTIVITY
SHOWN ON THE APPROVED PLAN. IF THE NAME IS NOT PROVIDED PRIOR TO ENGAGING IN THE
LAND -DISTURBING ACTIVITY, THE PLAN'S APPROVAL WILL BE REVOKED. uu z
ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS SOON AS THE
FIRST STEP IN CLEARING. Iiim=4 - w
A
ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE
SITE AT ALL TIMES. 0
ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE
PLANS (INCLUDING, BUT NOT LIMITED TO OFF SITE BORROW OR WASTED AREAS), THE CONTRACTOR SHALL
SUBMIT SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE
PLAN APPROVING AUTHORITY. FIRM INFO:
Lineage Architects, P.C.
ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL P.O. Box 991
MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN 98 Lee Highway
\ APPROVING AUTHORITY. Verona, VA 24482
Phone: (540)248-3771
Fax: (540)248-1628
ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES Email: info@lineagearch.com
\ \ \ DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS
ACHIEVED, AFTER WHICH, UPON APPROVAL OF THE PLAN -APPROVING AUTHORITY, THE CONTROLS SHALL BE ENGINEER NAME/SEAL:
\ \ REMOVED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE REMOVAL OF
\ \\ TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND
\ SEDIMENTATION. Sj TH OF ,
\ ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
\ ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES AT LEAST EVERY 2 WEEKS AND
\ IMMEDIATELY AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO
\ MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
ES-10: THE CONTRACTOR IS RESPONSIBLE FOR THE DAILY REMOVAL OF SEDIMENT THAT HAS BEEN
TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE.
ES-11: SEEDING OPERATIONS SHALL BE INITIATED WITHIN 7 DAYS AFTER REACHING FINAL GRADE OR UPON
SUSPENSION OF GRADING OPERATIONS FOR AN ANTICIPATED DURATION OF GREATER THAN 30 DAYS OR
UPON COMPLETION OF GRADING OPERATIONS FOR A SPECIFIC AREA.
ES-12: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND AIR MOVEMENT OF DUST
FROM EXPOSED SOILS WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS, OR HARM
�. ANIMAL OR PLANT LIFE.
------------
GRADING/E&SC PLAN
SCALE: 1" 2C'
ES-13: A VSMP IS REQUIRED FOR PROJECTS DISTURBING 2,500 SQUARE FEET OR GREATER IN A DESIGNATED
/CHESAPEAKE BAY PRESERVATION AREA (CBPA) OR 10,000 SQUARE FEET OR GREATER OUTSIDE THE CBPA. FOR
MORE INFORMATION VISIT THE VIRGINIA STORMWATER MANAGEMENT PROGRAM PERMITTING WEB PAGE
AT: http://www.deq.virginia.gov/Programs/Water/StormwaterManagement.aspx
E&SC LEGEND
JONATHAN F. GABBER 9
No. 038568
10
,t07/13/20 "v
`ti
%`SIGNAL V&i
ARCHITECT NAME/SEAL:
3
N0. TITLE KEY SYMBOL W
W a
3.03 CONSTRUCTION ROAD ORS
STABILIZATION O FTC
z o
U v_
3.05 SILT FENCE SF X X X Qt O
4 z Q a
STORM DRAIN I n 3'07 INLET PROTECTION r a r, vCULVERT
3'08 INLET PROTECTION C
3.30 TOPSOILING TO TO
1 SITE SUBMITTAL 7/13/20
3.31 TEMPORARY SEEDING TS TS NO. REVISIONASSUE DATE
JOB NUMBER: 19066
3.32 PERMANENT SEEDING PS P$ DATE: MAY 26, 2020
DRAWN BY: JMT
3.35 MULCHING M U MU APPROVED BY: JFG
DRAWING DESCRIPTION:
3.39 DUST CONTROL DC DC GRADING/E&SC PLAN
TOPSOIL STOCKPTS DRAWING NUMBER:
ILE TSSP
C 05