Loading...
HomeMy WebLinkAboutARB202000077 Plan - Revision 2020-07-20 (7)TABLE 3.35-A ORGANIC MULCH MATERIALS AND APPLICATION RATES RATES Mulches Per Acre Per 1000 sq. ft. Notes Free from weeds and Straw or Hay 1- 2 tons (Minimum 2 tons 70 - 90 lbs. coarse matter. Must be for winter cover) anchored. Spread with mulch blower or by hand. Do not use as mulch for Fiber Mulch Minimum 1500 lbs. 35lbs. winter cover or during hot, dry periods. Apply as slurry. Cut or shredded in 4-6" lengths. Air-dried. Do not Corn Stalks 4 - 6 tons 185 - 275 lbs. use in fine turf areas. Apply with mulch blower or by hand. Free of coarse matter. Air-dried. Treat with 12 lbs Wood Chips 4 - 6 tons 185 - 275 lbs. nitrogen per ton. Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Free of coarse matter. Bark Chips or Air-dried. Do not use in fine Shredded Bark 50 - 70 cu. yds. 1 - 2 cu. yds. turf areas. Apply with mulch blower, chip handler, or by hand. ' When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 lbs. / ac. or 45 lbs. / 1000 sq. ft. I Source: Va. DSWC 0 TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nossle Gallons/Acre Anionic 7:1 Coarse Spray 1,200 Asphalt Emulsion Latex Emulsion 12.5:1 Fine Spray 235 Resin in Water 4:1 Fine Spray 300 Acrylic Emulsion 7:1 Coarse Spray 450 (Non -Traffic) Acrylic Emulsion 3.5:1 Coarse Spray 350 (Traffic) Source: Va. DSWC GRAPHIC SCALE 30 0 15 30 60 120 ( IN FEET ) I inch = 30 ft. nNG BRICK PATIO EXISTING 1 STORY HOUSE I SSP ;' TS TO I , I SF', x MU PS \ , }fix\ I \ \ G'y7�o' A\ ' TP Ilk DC sa:6o' arc I r HVAC 100.6T EXISTING 2 STORY HISTORIC TAVERN 1612 SF PROPOSED 2 STORY ADDITION 979 SF PROPOSED TERRACE 1 STORY ADDITION 424 SF EXISTING 1 STORY BLDG 230 SF 1� `bar -_ - _ _ \ � - \ ` � % \ .\ \♦ DIRECTION OF PROPOSED FLOW SCALE: 1 "=30' GRAPHIC SCALE 20 0 10 20 40 ( IN FEET ) I inch = 20 ft. NOTE: SEE 80 GENERAL EROSION AND SEDIMENT CONTROL NOTES NG SHEET BY OTHERS FOR LANDSCAPING PLAN. T 1 z ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND .+ SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA U A REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS (4VAC50-30). W d ES-2: THE PLAN -APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION z z CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK 0 PRIOR TO THE FINAL INSPECTION. THE NAME OF THE RESPONSIBLE LAND DISTURBER MUST BE PROVIDED TO a THE PLAN -APPROVING AUTHORITY PRIOR TO ACTUAL ENGAGEMENT IN THE LAND -DISTURBING ACTIVITY SHOWN ON THE APPROVED PLAN. IF THE NAME IS NOT PROVIDED PRIOR TO ENGAGING IN THE LAND -DISTURBING ACTIVITY, THE PLAN'S APPROVAL WILL BE REVOKED. uu z ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS SOON AS THE FIRST STEP IN CLEARING. Iiim=4 - w A ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 0 ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF SITE BORROW OR WASTED AREAS), THE CONTRACTOR SHALL SUBMIT SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. FIRM INFO: Lineage Architects, P.C. ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL P.O. Box 991 MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN 98 Lee Highway \ APPROVING AUTHORITY. Verona, VA 24482 Phone: (540)248-3771 Fax: (540)248-1628 ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES Email: info@lineagearch.com \ \ \ DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED, AFTER WHICH, UPON APPROVAL OF THE PLAN -APPROVING AUTHORITY, THE CONTROLS SHALL BE ENGINEER NAME/SEAL: \ \ REMOVED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE REMOVAL OF \ \\ TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND \ SEDIMENTATION. Sj TH OF , \ ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. \ ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES AT LEAST EVERY 2 WEEKS AND \ IMMEDIATELY AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO \ MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. ES-10: THE CONTRACTOR IS RESPONSIBLE FOR THE DAILY REMOVAL OF SEDIMENT THAT HAS BEEN TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE. ES-11: SEEDING OPERATIONS SHALL BE INITIATED WITHIN 7 DAYS AFTER REACHING FINAL GRADE OR UPON SUSPENSION OF GRADING OPERATIONS FOR AN ANTICIPATED DURATION OF GREATER THAN 30 DAYS OR UPON COMPLETION OF GRADING OPERATIONS FOR A SPECIFIC AREA. ES-12: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOILS WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS, OR HARM �. ANIMAL OR PLANT LIFE. ------------ GRADING/E&SC PLAN SCALE: 1" 2C' ES-13: A VSMP IS REQUIRED FOR PROJECTS DISTURBING 2,500 SQUARE FEET OR GREATER IN A DESIGNATED /CHESAPEAKE BAY PRESERVATION AREA (CBPA) OR 10,000 SQUARE FEET OR GREATER OUTSIDE THE CBPA. FOR MORE INFORMATION VISIT THE VIRGINIA STORMWATER MANAGEMENT PROGRAM PERMITTING WEB PAGE AT: http://www.deq.virginia.gov/Programs/Water/StormwaterManagement.aspx E&SC LEGEND JONATHAN F. GABBER 9 No. 038568 10 ,t07/13/20 "v `ti %`SIGNAL V&i ARCHITECT NAME/SEAL: 3 N0. TITLE KEY SYMBOL W W a 3.03 CONSTRUCTION ROAD ORS STABILIZATION O FTC z o U v_ 3.05 SILT FENCE SF X X X Qt O 4 z Q a STORM DRAIN I n 3'07 INLET PROTECTION r a r, vCULVERT 3'08 INLET PROTECTION C 3.30 TOPSOILING TO TO 1 SITE SUBMITTAL 7/13/20 3.31 TEMPORARY SEEDING TS TS NO. REVISIONASSUE DATE JOB NUMBER: 19066 3.32 PERMANENT SEEDING PS P$ DATE: MAY 26, 2020 DRAWN BY: JMT 3.35 MULCHING M U MU APPROVED BY: JFG DRAWING DESCRIPTION: 3.39 DUST CONTROL DC DC GRADING/E&SC PLAN TOPSOIL STOCKPTS DRAWING NUMBER: ILE TSSP C 05