HomeMy WebLinkAboutWPO202000026 Bond Estimates 2020-07-22Project Name: Yancey Farm Pad 2. TMP 71-21B, WP0202000026, Erosion Control Plan
WPO file M WPO2020-00026
TM P(s): 07100-00-00-021BO
Date Estimate Completed: 07/22/2020 ()a /Alb. Co.; ST Vol. by L. Oday, RGA)
Erosion and Sediment Control Bond Estimate
Item
Number
1
2
3
4
5
6
7
0
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Item
No. Unit
Unit Cost
Cost
(installed)
TS)
silt
acres
$5.0$5.00
$$1,950.00
silt fence (SF)
fence (SI)
ft
$5.00
$1,950.00
safety fence (SAF)
ft
oft
$5.00
$0.00
diversion (DD, FD, RWD)
$13.00
$28,080.00
temporary slope drain (TSD) pipe length
-ft pipe diameter -in
$0.00
$0.00
Sediment Trap 91
earthwork for trap/basin
ST7 net eartthmork Vol.; cut/fill report
Roudabush, Gale &Associates
Logan Oday email, 7/21/2020 1:33 PM
structures for basin
Sediment Trap #2
earthwork for trap/basin
ST2 net earthwork Vol.; cut/fill report
Roudabush, Gale & Associates
Logan Oday email, 7/21/2020 1:33 PM
silt fence inlet protection (IP)
height of dam at toe ft out at high sideoft
ft
9 9
height of fill at face ft
length of dam ft
top width %
(area above transition; 0 sf
(total width of dam) 0 ft
(height below transitioi 0 ft
(area below transition) 0 sf
(total fill volume) 0.0 cy
length of spillway -fl
width of spillway fl
riser height ft
riser diameter in (user unit price) $0.00
barrel length ft base plate or fdn -
barrel diameter in (barrel unit price) $0.00
barrel Collars
baf%e IengU R
Os
ft
height of dam at toeoft
height of fill at faceft
length of dam%
top width
(area above transition;
0 sf
(total width of dam)
0 ft
(height below transitioi
0 ft
(area below transition)
0 sf
(total fill volume)
0.0 cy
length of spillway
width of spillway
-fl
fl
at at face
ft
length of Cut
ft
width of Cut
(area below transiti(
0 sf
(total width of cut)
0 ft
(depth below transit
0 ft
(area above transitii
out at high side ft
out at faceoft
ft
length of cutft
width of cut
(area below transiti(
0 sf
(total width of cut)
0 If
(depth below transit
0 If
(area above transith
0 sf
(total fill volume)
0.0 cy
(TOAL CY estimate
1610 cy
(spillway stone tons
12.1 tons
$13.00
$41,435.29
$50.00
$1,610.00
$0.00
$200.00
$0
$0.00
$200.00
$0
$50.00
$0
$13.00 $20,929.35
$50.00 $605.00
S100.00 $0.00
7/2212020
Project Name: Yancey Farm Pad 2. TW 71-21B, WP0202000026, Erosion Control Plan
WPO file M WPO2020-00026
TM P(s): 07100-00-00-021BO
Date Estimate Completed: 07/22/2020 Qa /Alb. Co.; ST Vol. by L. Oday, RGA)
Erosion and Sediment Control Bond Estimate
Item Item
Number
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
stone inlet protection (IP)
outlet protection (OP)-Trap#1
outlet protection (OP)-Trap#2
outlet protection (OP)
channel (SCC, matted)
check dam
construction entrance (CE)
wash rack
paved construction entrance
length
0 It
length
0 ft
length
0 It
length
930 ft
depth in channel
0 It
rip -rap, placed depth
width
survey and layout (price per 0.1 mi.) acres
mobilization
Temporary Access road
WP0202000026 Yancey Farm Pad 2_ESC_bond est_072220
Oft
IL 0.0
` 4.4
width
width
width
width
channel width
length -ft
:tons) 0 tons
traps and basins -
No. Unit Unit Cost Cost
(installed)
1 $20.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
0 $10,88loo
10.00 $0.00
$2,500.00 $0.00
$2,000.00 $2,000.00
$3,500.00 $3,500.00
$60.00 $0.00
$3,200.00
$2,500.00
cost sum
$138,790.64
con8ngency
$13,879.06
Total
$152,670
7/2212020