Loading...
HomeMy WebLinkAboutWPO202000026 Bond Estimates 2020-07-22Project Name: Yancey Farm Pad 2. TMP 71-21B, WP0202000026, Erosion Control Plan WPO file M WPO2020-00026 TM P(s): 07100-00-00-021BO Date Estimate Completed: 07/22/2020 ()a /Alb. Co.; ST Vol. by L. Oday, RGA) Erosion and Sediment Control Bond Estimate Item Number 1 2 3 4 5 6 7 0 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Item No. Unit Unit Cost Cost (installed) TS) silt acres $5.0$5.00 $$1,950.00 silt fence (SF) fence (SI) ft $5.00 $1,950.00 safety fence (SAF) ft oft $5.00 $0.00 diversion (DD, FD, RWD) $13.00 $28,080.00 temporary slope drain (TSD) pipe length -ft pipe diameter -in $0.00 $0.00 Sediment Trap 91 earthwork for trap/basin ST7 net eartthmork Vol.; cut/fill report Roudabush, Gale &Associates Logan Oday email, 7/21/2020 1:33 PM structures for basin Sediment Trap #2 earthwork for trap/basin ST2 net earthwork Vol.; cut/fill report Roudabush, Gale & Associates Logan Oday email, 7/21/2020 1:33 PM silt fence inlet protection (IP) height of dam at toe ft out at high sideoft ft 9 9 height of fill at face ft length of dam ft top width % (area above transition; 0 sf (total width of dam) 0 ft (height below transitioi 0 ft (area below transition) 0 sf (total fill volume) 0.0 cy length of spillway -fl width of spillway fl riser height ft riser diameter in (user unit price) $0.00 barrel length ft base plate or fdn - barrel diameter in (barrel unit price) $0.00 barrel Collars baf%e IengU R Os ft height of dam at toeoft height of fill at faceft length of dam% top width (area above transition; 0 sf (total width of dam) 0 ft (height below transitioi 0 ft (area below transition) 0 sf (total fill volume) 0.0 cy length of spillway width of spillway -fl fl at at face ft length of Cut ft width of Cut (area below transiti( 0 sf (total width of cut) 0 ft (depth below transit 0 ft (area above transitii out at high side ft out at faceoft ft length of cutft width of cut (area below transiti( 0 sf (total width of cut) 0 If (depth below transit 0 If (area above transith 0 sf (total fill volume) 0.0 cy (TOAL CY estimate 1610 cy (spillway stone tons 12.1 tons $13.00 $41,435.29 $50.00 $1,610.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $13.00 $20,929.35 $50.00 $605.00 S100.00 $0.00 7/2212020 Project Name: Yancey Farm Pad 2. TW 71-21B, WP0202000026, Erosion Control Plan WPO file M WPO2020-00026 TM P(s): 07100-00-00-021BO Date Estimate Completed: 07/22/2020 Qa /Alb. Co.; ST Vol. by L. Oday, RGA) Erosion and Sediment Control Bond Estimate Item Item Number 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 stone inlet protection (IP) outlet protection (OP)-Trap#1 outlet protection (OP)-Trap#2 outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance length 0 It length 0 ft length 0 It length 930 ft depth in channel 0 It rip -rap, placed depth width survey and layout (price per 0.1 mi.) acres mobilization Temporary Access road WP0202000026 Yancey Farm Pad 2_ESC_bond est_072220 Oft IL 0.0 ` 4.4 width width width width channel width length -ft :tons) 0 tons traps and basins - No. Unit Unit Cost Cost (installed) 1 $20.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 $10,88loo 10.00 $0.00 $2,500.00 $0.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $60.00 $0.00 $3,200.00 $2,500.00 cost sum $138,790.64 con8ngency $13,879.06 Total $152,670 7/2212020