Loading...
HomeMy WebLinkAboutARB202000076 Plan - Submittal (First) 2020-07-23FLOW AUTOMOTIVE OF CHARLOTTESVILLE Audi - Porsche - Volkswagen - Mazda ARB Revised for Submittal #2 dated June 22, 2020 (of original February 24,2020) 9 R W A R C H I T E C T S 112 fo trth street NE cherlottesville vIrghlls 22902 434.971.7160 www.brw ar,,h Rocte:com AERIAL PERSPECTIVE RENDERING OF PROPOSAL FLOW AUTOMOTIVE DEALERSHIPS DEVELOPMENT ARB Submittal June 22, 2020 A New Site and new Direction for Flow Dealerships Earlier this fall, Flow Companies was presented the opportunity to ac- quire the Old Malloy Ford property as a substitute for its current prop- erties across Richmond Road. This document introduces all four of the previously reviewed dealerships on this completely new site. Throughout 2019, Flow Automotive, Inc. has been extremely appre- ciative of the Albemarle ARB in its guidance for the development of both the new Audi /Porsche dealerships on 1313 Richmond Road (ARB-2019-55) and the VW /Mazda dealeships on 1289 Stoneypoint Road (ARB-2019-47). While having spent a good deal of time this year working diligently to find the best design solutions for both locations, we always faced serious limitations on these sites making each less than ideal for efficient operations. Thus, with the opportunity of acquir- ing the old Malloy Ford site - across the street from their current Audi/ Porsche complex - the decision was made to switch gears and pursue this change of direction. This new address - 1300 Richmond Road - is comprised of 2 adjacent lots - the old dealership and Service Building on the east side (TMP 7800-7) and the the Pre -owned building and ma- jority of parking on the west side ( TMP7800-6.) Flow finds many advantages with this new site that we hope may also be seen as a boon to the County and EC. First and foremost, this proj- ect would reutilize a major portion of the existing Malloy site. In keeping the large Service building, Body Shop as well as re -purposing the Pre - Owned Building, this redevelopment is a sustainable option in its preser- vation and re -use of existing resources. Further, the replacement of the existing old showroom along Richmond Road with the new Porsche / Audi complex will result in a much needed renovation of the rambling, outdated structure. The resulting project will be a fresh, clean design; bringing about a much improved condition along a very visible stretch of the Entrance Corridor. The Board will likely recognize the design's similarities with the previous project across the street that was `condi- tionally approved' by the ARB this summer There was much discussion about the limitations of the previous VW / Mazda corner site: the large electrical easment, difficult access and a long narrow lot were all features creating problems for future planning. B R W A R C H I T E C T S 112 fourth street NE charlettesvl lle vlrglnla 22902 434.971.7160 www.brwarchitects.com While we felt the previous design 'made the most' of a difficult situa- tion (and again we thank the ARB for helping sculpt those solutions), ultimately these compromises were leading to an inefficient site with crowded operations. Ultimately, a car dealership may not be the best fit for such a prominent locaton in the E.C. On the other hand, 1300 Richmond Road provides ample space - and not to mention, already developed space - for operations of all 4 dealerships combined. Further, we've found through a lengthy vetting process that a majority of the existing site's facilities can be re -used; which again is perhaps a more sustainable solution. Finally, vehicular drop-off was always a problem at the 1313 Richmond Road site. Due to limited space, this activity has had to occur on Rich- mond Road. At the new site, with the additional Road being built for the adjacent Wawa development, proposed vehicular drop-off will occur in the rear of the site via the new Road off of Stonypoint. With the previous Porsche / Audi project having gained conditional ARB approval and VW/ Mazda also having undergone multuiple re- views, we understand a good deal of effort has been put forth on these projects to date. We respectfully ask again for the ARB guidance in finding the best possible solution for both the dealerships in their relation with the Entrance Corridor. NEW DIRECTION FLOW AUTOMOTIVE DEALERSHIPS DEVELOPMENT ARB Submittal June 22, 2020 R R W A R C H I T E C T S 112 fourth street NE cherlottesvllle vlrghlle 22902 434.971.7160 www.brw archLettsaom U.S. ROUTE 250 RICHMOND ROAD I- - - - - - - - � I I f 1 I 1 I I I I I � / I 1 / I r / I 1 / I 1 / I I / I � / I / I / I , / I 1 / I / I I l I � r I / 1 I / 1 I / 1 I 1 1 I / 1 I f 1 I 1 1 I 1 1 , I 1 (EX) SALES 8 SERVICE NEW SALES &SERVICE f FFE 420 TO REMAIN BUILDING FFE 416.35 1 11 , � 1 I d I , , I � 1 II I EXISTING SERVICE FFE 1 I APPROX 414 TO 1 — 1 REMAIN i — )I h'' I NEW SALES BUILDING FFE �. _ NEW SALES BUILDING FFE / 417.00 419.50 / scale : 1" = 80'-0" -- - I I 1 IO - T C� I � EXISTING SITE PLAN ------�-_-/ 10 FLOW AUTOMOTIVE DEALERSHIPS DEVELOPMENT ARB Submittal June 22, 2020 U.S. ROUTE 250 RICHMOND ROAD scale : 1 " = 80'-0" NEW SITE PLAN FLOW AUTOMOTIVE DEALERSHIPS DEVELOPMENT ARB Submittal June 22, 2020 f- sf���1 AUDI & PORSCHE OF CHARLOTTESVILLE SHOWROOM RENOVATION & EXPANSION B B W A R C H I T E C T S 112 fourth street NE charlottwllle vIrglm 22902 434.971.7160 uww:brw-arch ft.ts.com R R W A R C H I T E C T S 1121nurtb street NE charlottesvllle vlrgl nla 22902 434.971.; 160 www.brw a r,h1Lec,t1.c.rr EXISTING AND NEW - FRONT PERSPECTIVE FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 The project on the site's East side (Parcel 7800-7) is a new addition expan- sion of the existing Ford complex transforming the old empty Ford dealer- ship into a new Flow Audi and Porsche Showroom as well as a renovation of the existing Service Building. While the Service Building block in the rear (not visible fro the EC) will remain, the entire front of the old Ford com- plex - including showroom and offices - will be demolished and replaced with a new updated complex; and a design that should be familiar to the ARB. As with the previously approved project reviewed last year, this new design is a dealership hybrid - marrying Audi on the west side with a Porsche Showroom on the east. The Audi portion of the building picks up from where it left off from the previously ARB approved but unbuilt design planned for the lot across the street. The new proposal for the existing building's west (Audi) side is similar in size and scale to the previous design and it employs a ground to roof curtain wall running across the front facade - a major feature that can be seen as both contemporary but also maintaining time honored classical elements. The vehicular drive-thru is represented as a minor massing in relation to the main showroom; thus helping to break down the scale of the overall facade. In composition, one can point to the buildings unadorned glass box as conveying the beauty of simple, whole geometry. Further, architectural elements - such as the repetition of the glass and its repetitive slender vertical framework - evoke a strength of repetition and subtle rhythm one finds in more classical buildings. The Audi Entry is an elegant recess within the front facade. With a reduced palette of materials, a general design theme is an uncluttered minimalism; an idea drawn from classical precedents. Porsche's curved facade is well suited to the new site in how its form ad- dresses the corner of Town and Country Road. You will note in the per- spective renderings that this portion of the facade is couched within the landscape as it is downhill by @ 10-15' from the corner of Richmond Road with Town & Country. One might argue Porsche's form and massing is a better fit at this new location vs. the previous site. The Porsche addition keeps the some material palette planned for across the street; which were revised per the previous ARB process commentary. These materials are compatible to Audi. The metal canopy complements the anodized glass frame of the Audi glass wall front and forms a suitable contrast to the transparency of the glass. An entire front facade make -over, this project is a major upgrade over the exisiting out -dated dealership. Pehaps, just as important, from a sus- tainability perspective, the re -use of this site / building saves resources; and a general goal is to maintain large portions of the site without major disturbance. On a building scale, the new showrooms are an improvement in that they will add a crisp, fresh design to the corridor and provide quality spaces filled with plenty of natural light on the interior. While the new exterior designs maintain some of the characteristics of each corporate identity, the overriding intent is to create a cohesive building and one that is in keeping with the local character and Entrance Corridor Guide- lines. After last year's February 4, 2019 work session and April 15th 2019 Con- cept Meeting with the ARB for the previous project, both dealerships made a number of design changes to address the Board's comments. We have maintained these revised architectural elements in this pro- posal. These design features include the following: 1. minimizing the drive-thru location which thereby reduces the overall canopy size - (in this new project the drive-thru is now an exterior lane under the metal canopy.) 2. reducing the metal canopy volume and overall building height by removing its top 4'-0" panel, 3. revised the Porsche storefont glass widths to a 4'-0 module for consistency to the Audi design as well as 4. modifying the vertical connections of the curtain wall frame in the Porsche central glass entry - changing from butt joints to anodized frame - to again tie into the Audi framework and create more overall design consistency and 5. the columns were enlarged in order create a more solid connection to the ground. Again, an important issue in this program is not just looking at either side or dealership in isolation but rather designing a building that works as a whole; and stands on its own merit to be a positive addition to the En- trance Corridor. In this way, a design goal is finding ways creating com- positional unity. We are finding this unity in materiality, overall massing as well in more focused architectural detail. We are proposing a brick siding for the new building side elevations; one that takes the place of each corporate standards materials of cement paneling and black corrugat- ed metal. Regarding the more general building composition, roof heights were modified to reflect the sloping grade. On the detail level, more minor architectural elements were brought into alignment; such as the Porsche banding pattern with various featires pf Audi's facade. Also, de- fining the 4'-0" glass width lends to this idea of consistency - maintaining a shared module of the field of glass; furhter tying the two sides together. While a separation is requested by both dealerships to avoid blending of branding identities, the central block - a simple recessed wall of minimal dark gray metal paneling - provides an architectural element that mar- ries the two styles while creating a pause for transition. PROJECT NARRATIVE FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 0 R W A R C H I T E C T S 112 fourth street NE 0er1otte.1U vIrghlls 22902 434.971.; 160 www.brw ar,,hltette.c.m scale: 3/64" = 1'-0" EXISTING PLAN FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 R R W A R C H I T E C T S 112 fourth street NE ch.rlettesvl lle tlrglnla 22902 434.971.7160 uww:brw-arch ft.t.x., a ii WH L 'I 1 1 1 II 10)ij f 11 11 j EXISTING TO REMAIN I 1 li��1i I . � 11i = i �111 011 �,�1i i 11 1I1, � I II fU�1 1I ` 1 10 o 11 I '�1 11 �I 11 1 1 r c L�-- II �1 EX SHOWROOM TO BE DEMOLISHED L 77 I I � t ' - •� — I I I I — ---------------------- s b II I �j 11 1 fll l 1 L_ L-- ------------------ scale: 3/64" = 1'-0" DEMO PLAN FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 NOTE: VISIBILITY OF ALL MECHANICAL EQUIPMENT FROM THE ENTRANCE CORRIDOR SHALL BE ELIMINATED. EXISTING TO REMAIN I11 1 jj� 'i .. i,`lv 7• I .i— r I Q B ri Ei U �LJLI -I E:I1� a �' 75FNEW AUDI SHOWROOM417,_0, Gr�l-� B R WA R C H I T E C T S 112 fourth street NE 0er1ottesv1U vlrghlle 22902 434.971. 160 www.brw ar,,hltecte.c.m 404� - O" 7 414' - 0" L rI ® NEW PORSCHE E � 77, SHOWROOM - — � �` scale :3/64" = 1'-0" a 419'- 6' -- NEW PLAN FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 R R W A R C H I T E C T S 112 fourth street NE ch rlottesvllletlrglrt. 22902 434.971.7160 uww:brw-arch ft.ts.com nAF('I-I I INITS AUDI RTU SIGHTLINE PORSCHE RTU SIGHTLINE scale : 3/32" = V-0" AUDI & PORSCHE RTU SIGHTLINE STUDY FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 B R WA R C H I T E C T S 112 fo trth street NE cher10tte.1U vlrghlls 22902 434.971.7160 www.brw arohltects:com NEW - FRONT PERSPECTIVE FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 ACM dry -joint Brick veneer - rainscreen system - Glen- Gery Steel matte (MICA OPT) finish Grey K12-3008 at Service Drive portal AUDI ROOF J 440'-2 W NO r\ Aultlsw:'rvxJa AUDI SERVICE DR[ Recessed metal Curtain wall with 2' corners - grey finish anodized frome— Matte white ACM at Brick veneer - interior ceiling fascia Glen- Gery Steel beyond - CWM Grey K12-3008 White finish I ACM dry -joint rainscreen system - matte (MICA OPT) finish at entry portal NOTE: 1. VISIBLE LIGHT TRANSMITTANCE (VLT) SHALL NOT DROP BELOW 40%. VISIBLE LIGHT REFLECTANCE (VLR) SHALL NOT EXCEED 30%. 2. VISIBILITY OF ALL MECHANICAL EQUIPMENT FROM THE ENTRANCE CORRIDOR SHALL BE ELIMINATED. R R W A R C H I T E C T S 112 fourth street NE charlottesvllle vlrglnla 22902 434.971.7160 uww:brw-arch itects.com Metal paneling @ recessed building connection - VM QUART - ZINC finish. SHARED SPACE Curtain wall with anodized frome @ V-0" wide interior columns - silver finish. Revised from ARB submission 3/4/2019. Aluminum composite metal panels - T2'-q" matte (MICA OPT) finish (revised from MTLC BSX SLVR per ARB comments r2 -91/4 submissions 3/4/2019) ,-2'-9114" PORSCH r Q Q ICh rllm'I�II 'l Ow a Structural glazing at showroom - vertical butt joints with glass fins behind Exterior canopy columns - black finish scale : 3/64" = 1'-0" AUDI- PORSCHE FRONT BUILDING ELEVATION FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 -- 9 R W A R C H I T E C T S 112 fourth street NE cherlottesville vlrglnle 22902 434.971.; 160 www.brw archltetts:com Audl Chats 1 ottesvllle 1� CharlotbesvNe r AUDI- PORSCHE FRONT PERSPECTIVES FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 8 R W A R C H I T E C T S 112 fourth street NE c Ila tottesvl l le,IrgIrw 22902 434.971.7160 www.brw-arch ft.ts.com AUDI - PORSCHE SIDE PERSPECTIVES FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 9 R W A R C H I T E C T S 112 fourth street NE 0er1otte.1U vIrghlls 22902 434.971.; 160 www.brw ar,,hltette.c.m EXISTING - PERSPECTIVE - LOOKING WEST FROM RT.250 FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 B R W A R C H I T E C T S 112 fourth street NE charlottesvllle tlrglrt. 22902 434.971.7160 www.brw-arch ft.ts.com NEW - PERSPECTIVE - LOOKING WEST FROM RT.250 FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 9 R W A R C H I T E C T S 112 fourth street NE cherlottesville vlrglnle 22902 434.971.; 160 www.brw archltetts:com EXISTING - PERSPECTIVE - LOOKING EAST FROM RT.250 FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 N 8 R W A R C H I T E C T S 112 fourth street NE c Ila tottesvl l le,IrgIrw 22902 434.971.7160 www.brw-arch ft.ts.com NEW - PERSPECTIVE - LOOKING EAST FROM RT.250 FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 PORSCHE ROOF d45- 9• Ex'sfing building to be ,wanted fork grsy— EXISTING REAR BODY SHOP BEYOND NOT VISIBLE FROM E.C. Aluminum composite metal panels - matte (MICA OPT) finish. I?NO urved metal ZO N O —. b. Structural glazing at showroom - vertical butt joints with gloss fins behind- 9 R WA R C H I T E C T S 112fourth street NE cherlotti lle vlrg nle 22902 434.971.7160 www.1l arohltects:com txtenor canopy columns - block finish RSCHE DRIVE-THRU NOTE: Audi Sew. Dm.e- More white ACM of interior Cochi n wall wBh 2' Porsche building Thru roof ceihngfasda beyond- CWM White finish anodized forme beyond l e a-t EXISTIN SERVICE AREA tr �� AUDI OOF PARTLY VISIBLE FROM E.C. 4d0'-2' h. O � O AUDI SHOWROOM ACM dry-iaintminscreen Bride veneerGlen-Gery Steel Recessed mewl system 0service drive portal- Grey k12.3008 corner -grey it (MICA OPT finish finish - poihno i EXISTING TO REMAIN u 1 Existing building to be re-paind III dark grey to oral ACM panel u garage door 1. VISIBLE LIGHT TRANSMITTANCE (VLT) SHALL NOT DROP BELOW 40%. VISIBLE LIGHT REFLECTANCE (VLR) SHALL NOT EXCEED 30%. 2. VISIBILITY OF ALL MECHANICAL EQUIPMENT FROM THE ENTRANCE CORRIDOR SHALL BE ELIMINATED. AUDI SIDE - WEST ELEVATION scale: 3/64" = 1'-0" PORSCHE SIDE - EAST ELEVATION scale: 3/64" = 1'-0" AUDI - PORSCHE SIDE ELEVATIONS FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 R R W A R C H I T E C T S 112 fourth street NE dTw ottesvllle virglnle 22902 434.971.7160 aww:brw-arch itacts.com NEW - PERSPECTIVE - LOOKING WEST FROM TOWN & COUNTY RD FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 Old Mazda OIL 0 R W A R C H I T E C T S 112fourth street NE Charlottesville vIrghlls 22902 434.971.7160 www.brw arohltette:Com Goodwill Store Future Wawa Development k -w 4-_ Proposed FLOW Mazda - VW beyond �— S'WQ[Charmue..1, mmmmilim BMW of Charlottesville across ELEMENTS OF ENTRY CORRIDOR GUIDELINES FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 Proposed FLOW Audi Porsche Old Audi Porsche across 6 R W A R C H I T E C T s 112 fourth street NE .herlottesvllle virglnla 22902 434.971.7160 eww:brw-arch it..t.x., Guadalajara Restaurant (1) 1 TOYOTA BROWN -y To Brown Toyota across In developing a new identify for this site, both Audi and Porsche look to create a building that responds to the guidelines for the Entrance Corridor. While using modem design and materials, the intent is for tak- ing cues from the scale, texture and detail of the surrounding Entrance Corridor and the historic precedents of the larger community. Compatibility with the Character of the Entrance Corridor The size and scale of this building compares appropriately with the size and scale of buildings on both sides of the Entrance Corridor. It would fall into the moderate to large range in comparison to other buildings in the area and will be the some scale as the existing building. The Entrance Corridor along US 250 east of Charlottesville at Pantops represent a diversity of architectural approaches to design and scale. A good portion of the development along the stretch includes a num- ber of buildings using different materials and a variety of architectural styles. The Union Bank and UVA Credit Union buildings use painted white brick, the Montessori school is a more contemporary design which use scale, material and texture to accomplish their appropriate- ness within the district. Toyota has used modem materials to modify its trademark building to break down the scale of the building down into section that reflect the historic scale of much more traditional buildings of the region. Form, Shape, Scale, and Material Creating a Cohesive Whole This renovation / addition breaks down the scale of long facade and create variations on the facade. The Design narrative goes info more detail regarding how the materiality and detailing help create a more cohesive whole. Buildings should relate to their site and surrounding context The different sides of the new design step down with the natural topog- raphy; which help it relate more appropriately to the site. Porsche's rounded eastern corner provides an suitable response to the corner of 250 and Town and Country Road. Buildings should have a human scale Both Dealerships provide a strong sense of entry and scaling mech- anisms that deal with human scale. Each respective Entry provides a focus and reduced overall scale to allow people to relate to buildings in a personal way. ELEMENTS OF ENTRY CORRIDOR GUIDELINES FLOW AUDI PORSCHE AUTOMOTIVE RENOVATION AND EXPANSION ARB Submittal June 22, 2020 T MAZDA & VOLKSWAGEN OF CHARLOTTESVILLE SHOWROOM RENOVATION & NEW CONSTRUCTION B B W A R C H I T E C T S 112 fourth street NE charlottwllle vIrglm 22902 434.971.➢160 ¢ww:brw-arch itects.com The project on the west side of the old Ford property (Parcel 7800-6) includes both a new Mazda and VW Dealership. Mazda would occupy what is currently the old Pre -owned building. While renovating the ex- isting structure, scope of work would also include 2 new small additions -one on either side of the buildng - as well as a completely new facade across the building front. The VW will be a completely new building next to Mazda. The new Mazda will provide all the amenities of a full -service dealership: an up-to-date showroom with waiting areas and offices, a vehicular drop off station as well as a new Service Bay Garage in the existing garage below. Related to the E.C. review, the new Showroom/Service Center will provide a much -needed upgrade from the existing dated structure. We see this project as an opportunity to enhance the character of the site by improv- ing the Site Plan with better organization and improved county recom- mended landscaping. And from an architectural standpoint, the project replaces the existing with a new building that is more appropriate for its prominent location. The current Mazda design standard is a contemporary style. Subdued with a simple combination of light and dark metal paneling, the exterior facade shows enough variety to create and maintain interest and has a calm, cool demeaner; as apposed to being flamboyant and overwhelm- ing the rest of the character on the 250 corridor. Large storefront windows are added to the facade which rounds out the material palette and provides a healthy amount of daylighting for the interior. Mazda's main design feature - referred to as 'the jewel box' - is a 2 story room enclosed in a glass frame that encourages one's gaze on the outside into the inte- rior environment. This 'jewel box' appears an appropriate answer for an addition to the existing building. In contrast with the rest of the white front exterior, it helps break down the scale of the building. Its prominent but well proportioned oversized glass wall is oriented toward a wonderful view and enhances the importance of its location. Further, the interior wall of the jewel box is lined with a wood plank the which forms a warm contrast to the exterior and materially ties into the local vernacular. As with the previous 2019 design, this building's facade has traded the corporate branded white metal panels in exchange for white brick; which we see as a material much more in keeping with the local character and material vernacular. EXISTING & NEW - PERSPECTIVE - LOOKING NORTH WEST FROM RT.250 e a w a e c e[ r e c r s FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION 112 fourth street NE cherlottesvllle vIrg nle 22992 434.971.7160 ARB Submittal w.w.hrw erchlle<«:eom June 22, 2020 In addition - per ARB Conceptual review comments, we have reconfigured the Mazda exterior facade by reducing the height of the front white brick wall making it 22' vs the original 26' height. This move brings about 2 positive results: 1. It breaks down the scale of the original building. Now there is a clear major and minor element to the building's overall composition. 2. It addresses the problem of the 'blankness' of the original white wall. With its new reduced height, the wall appears at a more appropriate scale and from a compositional standpoint, it plays a secondary role to the 'jewel box' on the west side. The new VW complex will provide the some full -service amenities as Mazda. As with Mazda, this particular site layout is advantageous in allowing for efficient daily operations and a plus for the Entrance Corridor in the way it limits the visual noise of constant visible moving vehicular traffic on site. The VW location was mainly informed by the re -use of the existing pre -owned building. Given the need for their proximity in creating an efficient site - con- gregating massing, drive-thru bays and drive thru aisles - the new VW facade is placed alongside the Mazda complex. In this way, there is an efficiency of scale created on the site as well as the potential for re -using the already de- veloped parking in the front of the buildings. The VW building also picks up from where we left off on the prior design for the previous site per the 2019 ARB review process. Again, a buff colored stone paneling has replaced the original VW white metal panel; a standard in the companies branding material palette. Also, the white frame is broken down into smaller frames ;which help both break down scale of compostion as well as lend a human scale. The major VW change from the concpetual submission is - per the county comments - eliminating the light trough in the exterior frame. It's also worthwhile pointing out that while we looked at breaking down the scale of VW by recessing the Drive-thru block on the left, we felt that adding an additional element might introduce a 'busy-ness' to the overall composi- tion of VW and Mazda when looked at in unison. You'll note in the side by side comparison (see elevation sheet), that the VW building forms an appropriate counter point to the 2 part Mazda design. further, the lower VW building shows a relationship to the existing topography. The lower Her portion of Mazda's white wall provides a suitable transition between the lower roof line of VW and the higher eastern block of the Mazda building. We look forward to working with the county in providing the best possible de- sign solutions. PROJECT NARRATIVE FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 j-� b of er v ' I _Z -- j +4-v�:• fig, .a _w i= } ;� .'�..� 'i.�a.. 'fig.MR �.y n r + � C l 4 9 R W A R C H I T E C T S 112 fourth street NE cherlottesville vlrglnle 22902 434.971.; 160 www.brw archltetts:com EXISTING - PERSPECTIVE - ENTRY LOOKING WEST FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 8 R W A R C H I T E C T S 112 fourth street NE c Ila tottesvl l le,IrgIrw 22902 434.971.7160 www.brw-arch ft.ts.com NEW - PERSPECTIVE - ENTRY LOOKING WEST FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 9 R W A R C H I T E C T S 112 fourth street NE cherlottesville vlrglnle 22902 434.971.7160 www.brw archltetts:com MAZDA - PERSPECTIVE - LOOKING WEST FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 8 R W A R C H I T E C T S 112 fourth street NE c Ila tottesvl l le,IrgIrw 22902 434.971.7160 eww:brw-arch it..t.x., MAZDA - PERSPECTIVE - LOOKING EAST FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 9 R W A R C H I T E C T S 112 fourth street NE cherlottesville vlrglnle 22902 434.971.; 160 www.brw archltetts:com EXISTING - PERSPECTIVE - LOOKING NORTH EAST FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 8 R W A R C H I T E C T S 112 fourth street NE c Ila tottesvl l le,IrgIrw 22902 434.971.7160 www.brw-arch ft.ts.com NEW - PERSPECTIVE - LOOKING NORTH EAST FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 B R W A R C H I T E C T S 112 fourth street NE cherlottasvllle vlrgl rila 22902 434.971.; 160 www.brw archltec[s:com EXISTING - PERSPECTIVE - LOOKING WEST FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 L B R W A R C H I T E C T S 112 f.a h street NE rlo chattesdllle vi rgieia 22902 434.911.7160 eww.brw-a rch itects.com BA NEW - PERSPECTIVE - LOOKING WEST FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 FEW B R W A R C H I T E C T S 112 fourm street NE charlottesvllle vlrglnla 22902 434.971.; 160 www.brw archltec[s:cem NEW - PERSPECTIVE - VW FRONT & EAST SIDE FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 0 0 Z Y 3 l 1 I r ---1 -i'- II -I II IIIIi I I-III1 I IIIIIIIIIII i1 IIIIIIIIIII I �-IIIIII-1 1I I IIIIIIIITI—IIIITiI II I� I IIIIIII � II � II � II � I—IIII � B R W A R C H I T E C T S 112 f.a h street NE rlo chattesdllle vi rgiaia 22902 434.911.7160 v.ww.brw-a mM1 itccts.aom NOTE: NO ROOFTOP UNITS FOR MAZDA. MAZDA MECHANICAL UNIT IS HIDDEN FROM STREE ON WEST SIDE ELEVATION —MECH UNIT VW RTU SIGHTLINE scale : 1 " = 30'-0" MAZDA & VW RTU SIGHTLINE STUDY FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 jk FIRST FLOOF 420' - 4 1 /4" B R W A R C H I T E C T S 112 fo trth street NE fherlottesville vlrghlls 22902 434.971.7160 www.brw ar,,hltetto.c.m STONE PANEL SP-1 ENTRY FRAME WITH CLEAR INSULATED GLAZING SYTEM AND VW LOGO CLIP ON INTERIOR AND EXTERIOR FACES DEALER FRAME WITH ILLUMINATED DEALER NAME SIGN WITH BACKLIT LETTERS BY VWoA SIGN VENDOR. — CENTERLINE OF VW SIGNAGE CLEARANOD. ALUM,. CURTAIN WALL (CW-1) WITH CLEAR GLAZING (GL-1) .. ..f ............ SHOWROOM SERVICE SERVICE DRIVE SHOWROOM NOTE: 1. VISIBLE LIGHT TRANSMITTANCE (VLT) SHALL NOT DROP BELOW 40%. VISIBLE LIGHT REFLECTANCE (VLR) SHALL NOT EXCEED 30%. 2. VISIBILITY OF ALL MECHANICAL EQUIPMENT FROM THE ENTRANCE CORRIDOR SHALL BE ELIMINATED. PER ARB COMMENTS 05.18,2020: MAZDA BRICK -FACED FRONT REDUCED VW FRAME LIGHTING REMOVED scale : 1/16" = 1'-0'1 MAZDA & VW FRONT BUILDING ELEVATION FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 B R W A R C H I T E C T S 112 fourth street NE t,h.rlettesvl lle vlrgIrt. 22902 434.971.7160 uww:brw-arch it..t.x., MAZDA WEST ELEVATION scale : 1/16" = 1'-0" PARTLY SEEN FROM E.C. I r] I l I I M i. 1`­ rrl A l A r flr111"I All VI A1111AT :O STOUT LOTUSAN 1.5 TINTED ISHED CONCRETE RATION - NOT SEEN FROM E.0 VW EAST ELEVATION scale : 1/16" = 1'-0'1 MAZDA & VW SIDE ELEVATION FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 Old Mazda 0 R W A R C H I T E C T S 112fourth street NE fher10tte.1U vIrghlls 22902 434.971.7160 www.brw arohltetto.c.M Goodwill Store Future Wawa Development Proposed FLOW Mazda - VW beyond �— S'WQ[Charmue.. 1, sera.:. �6AFI :AR■ MeMW BMW of Charlottesville across ELEMENTS OF ENTRY CORRIDOR GUIDELINES FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 Proposed FLOW Audi Porsche Old Audi Porsche across 6 R W A R C H I T E C T S 112 fourth street NE .herlottesvllle virglnla 22902 434.971.7160 eww:brw-arch it..t.x., Guadalajara Restaurant TOYOTA BROWN � ! 7_0 41ZJ�T ._ 4 �t - Brown Toyota across In developing a new identity for this site, both VW and Mazda look to create a building that responds to the guidelines for the Entrance Cor- ridor. While using modern design and materials, the intent is for taking cues from the scale, texture and detail of the surrounding Entrance Corridor and the historic precedents of the larger community. Compatibility with the Character of the Entrance Corridor The size and scale of this building compares appropriately with the size and scale of buildings on both sides of the Entrance Corridor. Clearly, the Pre -owned converted into Mazda complex maintains the scale and generally improves the exisitng condition. The VW complex is sim- ilarly sized and would be considered a moderate sized building along this corridor; certainly within bounds of the surrounding context. Also both building designs fit within the variations found on both sides of the street and one might argue that they bring a high level of detail vs many other commercial ventures. Form, Shape, Scale, and Material Creating a Cohesive Whole Both buildings break down the scale of long facade by introducing a variations of architectural features. In Mazda's case, we have revised the typical design standard and lowered the white wall on the east side of the front elevation; which breaks down the building scale and and substituted white brick for the white metal panels with the intent to better tie the design into a materiality with shared by the local vernac- ular. Buildings should relate to their site and surrounding context VW is scaled and located to relate the existing pre -owned building. Both buillding fronts are a similar length. VW ground and building height is lower than Mazda as a way of relating to the existing grade. A priority in this development is for a sustainable re -use of the existing resources. Buildings should have a human scale Both Dealerships provide a strong sense of entry and scaling mecha- nisms that deal with human scale. Mazda's entry is clearly marked and the interior of it's most visible architectural feature - the jewel box - has an interior wood wall that has a warmth and texture more appropriate for the human connection. In addition, VW's design has a number of entry portals that break down the front facade and it's overall white frame into entries and detailing of a very human size and scale. ELEMENTS OF ENTRY CORRIDOR GUIDELINES FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 B R WA R C H I T E C T S 112 fo trth street NE Charlottesville vIrg nls 22902 434.971.7160 wew.brw ar,,h Rocto.o.m PROPOSED LANDSCAPE ype Botanical Nome Common Name �i Tree Lfiedotlmn fulipilem Tull, Popov u. Tree Natenos ocerifdb Loreon None Tree u, Tree Clerlrostris 4entu.4m renoe rwe „ Tr 0m.;di,hpwm M.Ire ..Lr— ieoer _ Cor,mm below. P9emiare Euro,.n ro T-beret. Horn"_ runt1 terci, a n�eoensip h o Eestere R.*w T i. em0ata Gr000s,be L^rnm emnl C,steoy.. mria'e. 'wnt Kingm W Itmy' In mom hen .oe mentel rto u (Iwko 'A„alz,n, Spring' i—e 9.1.1u Ni,. oum Rcet el.'c. wup Hytlmngen M.161a1ha Ook to, H,o—con hreb F.1haq11e co rend h.orr Eomsguu SITE LANDSCAPE FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020 Proposed Aerial Existing Aerial B R W A R C H I T E C T S 112 fourth street NE sln rlottesvlllevlrglnla 22902 434.971.7160 aww:brw-arch its.t..o., Landscape Design for the Particular Site The updated landscape design attempts to provide a thoughtfullness and respect for this particular site - taking into account both its advantiages and limitations. A few major issues to note: • The majority of the planting palette is comprised of native species of trees & shrubs. • The overhead power line and narrow planting bed at the east lot 250 frontage pose a challenge and limits the options for the variety of trees - especially the standard typical large canopy street tree - that would thrive here. Looking at the existing site, we clearly want to avoid the previous planting scheme of a large canopy trees which would inev- itabley would be trimmed inappropriately or 'topped' for the power lines. Instead, we propose a tree selection that works within this existing context - one that is a lower height and species durable enough to thrive in this difficult condition. In turn, the proposed `east frontage' planting plan utilitzes a mix of smaller understory specimens - and through their repetition begin to reinforce the street edge while complimenting the narrow space be- tween road and intrior drive/building. • On the other hand, with Route 250 turning to the left in front of the west lot, we are afford- ed some space which provides the opportunity for the larger canopy trees recommended by ARB standards. In this case, we choose a variety that has a stong form/ presence and place them in a row of seven; as a way of developing a consistency, repition and pattern that will certainly enhance the character of the Entrance Corridor. SITE LANDSCAPE FLOW MAZDA - VOLKSWAGEN AUTOMOTIVE RENOVATION AND NEW CONSTRUCTION ARB Submittal June 22, 2020