Loading...
HomeMy WebLinkAboutZMA202000007 Review Comments Zoning Map Amendment 2020-07-23 (2)(Z) COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 July 22, 2020 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Andy Reitelbach Re: RST Residences ZMA-2020-00007 Review #1 Dear Mr Reitelbach: (804) 786-2701 Fax: (804) 786,2940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Bottler, dated 18 May 2019, and find it to be generally acceptable. 1. Traffic Impact Analysis (TIA) comments : VDOT Traffic Engineering offers the following Comments: • Page 1: the counts and collection dates do not match and will be corrected. • Page 6: TE recommends 100-ft storage and 100-ft taper for Ashwood @ Archer Ave. The construction of the left turn lane may lead to the closure of the existing median break. TE recommends 200-ft storage and 200-ft taper to comply with the VDOT access management for turning lane length of taper and storage for US 29@ R1RO Driveway. Please include the following recommendations in revised analysis. Synchro Files: AM and PM existing models do not have the correct existing total split timing, yellow timings and all red timings. Considering this intersection is coordinated with other intersections along US 29, the existing timings need to be used throughout all scenarios. If signal -timing modification is deemed necessary to accommodate the development, the modified signal timings should be added to the recommendation section for review. Furthermore, any signal timing modification to this intersection may require updating the entire coordination system along US 29. Obtain the correct existing timings from VDOT/1'OC and update Synchro files accordingly. Lost time adjustment is coded incorrectly throughout all scenarios (Existing, No -Build and Build). Use the default value of "0". Side note: VDOT/ TE commented in this practice from RKA several times at different occasions. Refer to Synchro guide for information in regards to the lost time adjustment. VirginiaDOT.org WE KEEP VIRGINIA MOVING The existing condition has a pedestrian phase, which was not coded into Synchro. Add the pedestrian phase for all scenarios. Level of Service Summary tables uses Synchro output values; however, per TOSAM "HCM 2010 should be used for reporting Synchro analyses. If HCM 2010 reports are not generated because of the operation of the intersection, HCM 2000 should be used". Revise all the summary tables to include the HCM values and all attached reports are to be HCM 2010/2000 reports. • Southbound left turn lane is coded incorrectly throughout all scenarios (Existing, No - Build and Build). SBL is coded as a protected permissive; however, SBL is in a protected only mode. Revise Synchro models to match the existing condition of the SBL operation. VDOT TE performed internal analysis for the PM Build model using existing timing. The analysis showed that the 95' queue length of the SBL will spillover to the US 29 and the Synchro queue length is #313-ft. As a result, TE recommends that the SBL storage needs to be extended an additional 150-ft to accommodate the long queues during the PM peak. 2. Note that the final plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. If further information is desired, please contact Max Greene at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency