Loading...
HomeMy WebLinkAboutSDP202000039 Review Comments Major Amendment, Final Site Plan 2020-07-24� AI ?"h �IRGRTF COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 229024596 Phone (434) 296-5832 Fax (434) 972-4126 Project: Project file#: Plan preparer: Owner or rep.: Plan received date: (Rev. 1) Date of comments: (Rev. 1) Reviewer: Project Coordinator: SDP2020-00039 Site Plan review Major Site Plan Amendment, Malloy Ford SDP2020-00039 Shimp Engineering, 912 E. High St. Charlottesville, VA 22902 Kendra Patrick, kendra(a�shimp-engineering.com Justin M. Shimp, justin(a),shimp-engineerina.com Malloy Properties III, c/o Malloy Companies LLC 2070 Seminole Trail, Charlottesville, VA 22901 24 Apr 2020 24 Jun 2020 26 May 2020 24 Jul 2020 John Anderson Christopher Perez Note: If text grayscale, comment addressed with Rev. 1 C1 1. Recommend provide brief Major Site Plan Amendment narrative. 2. Recommend revise plan title to include reference to SDP2020-00039. 3. Provide title sheet stormwater management notes that, at a minimum, discusses on -site treatment, detention, reliance on existing facilities, and VSMP /WPO plan submittals (planned, pending). 4. Recommend that title sheet SWM Note discuss nutrient credit purchase, if nutrient purchase proposed. C2 5. 30,096 SF portion of building TBR: Provide demolition plan, details, narrative, sequence, etc., relative to site access and limiting effect of demolition on the public, including the traveling public on US Rt. 29. (Rev. 1) Withdrawn. Applicant (6/2220 letter): `The building has actually already been demolished.' 6. Provide safety fence (SF) with demolition plan during demolition and construction phases. Immediately adjacent to site, public visits to purchase or consider new /used car inventory. Construction site must be isolated to prevent unwitting trespass by children, unaccompanied minors, or others. Note: Engineering recommends fence be installed using posts set in pavement. (Rev. 1) Withdrawn. Applicant: `Safety fences were provided at the time of demolition.' 7. Provide narrative /description of proposed boundary line adjustment. Please acknowledge separate application /review process is required. If not yet submitted, submit BLA Application to Albemarle as soon as possible. A BLA exhibit shown with Major Site Plan Amendment does not approve a property boundary line adjustment by effect of site plan approval. Boundary line adjustments are distinct, important and require separate plat review, and approval. (Rev. 1) Comment persists. Applicant: `Acknowledged, a BLA plat is currently being prepared by Roger W. Ray & Associates, Inc. and will be submitted for review. The BLA is now mentioned in the SPA summary on the cover sheet.' 8. Provide legend definition of symbol NS (Nail set? List on Cl). 9. Label Rt. 29. Engineering Review Continents Page 2 of 4 10. Label Ex. building `building'. 11. Provide deed bk.-pg, reference for IMP 45-68A. 12. Show /label existing parking area fronting building, show pavement markings. 13. Label adjacent parcels: TMPs 45-68C1, 45-112B, 45-112A, 45-112B1. 14. Provide complete ownership information for adjacent parcels, including deed bk.-pg. reference. 15. Show /label existing easements: power, gas, telephone, cable, private /public drainage, any on -site SWM facility, ACSA /RWSA utility, access, etc. Provide deed bk.-pg. ref for easements. 16. Show /label Rt. 29 right-of-way. 17. Provide Rt. 29 ROW deed bk.-pg. reference. (Rev. 1) Comment persists. Applicant: `... see a reference to DB 478 PG 523 that might be it but need to confirm before adding this to the plans.' 18. Show and label managed steep slopes on adjacent parcels. Use easily distinguishable hatching. 19. C3: Recommend provide specific details for proposed boundary line, with bearing -distance -tie information to evaluate amendment effects on managed steep slopes, and proposed effect of BLA on major amendment (Rev. 1) Applicant: `Acknowledged. To be provided on the plans once BLA plat is complete.' C4 20. Provide stop bar and stop sign at site exit/s to US Rt. 29. (Rev. 1) Withdrawn. Applicant: `A stop sign would have to be located within VDOT ROW: we will defer to VDOT for this.' 21. Label sidewalks, if any. (Rev. 1) Withdrawn. Applicant: `No sidewalks are to be provided as it is intended for all customers to remain outside looking at the vehicles on display.' 22. Label US Rt. 29. 23. Although site plan shows HC parking, it does not include CG-12 ramps. If connection is proposed between HC parking and Ex. 9,120 SF warehouse (to remain as vehicle sales and service), provide accessible ramps. (Rev. 1) Withdrawn. Applicant: `No connection from the HC parking to the building is proposed. No customers will enter the building.' 24. Provide /label HC parking sign. 25. Show /label existing travel -way feature immediately south of site which appears to be a frontage road. (Gifel�:) [ Image removed with Rev. 1 comments. ] C5 26. Proposed grade at south edge of new outdoor sales /storage /display parking may release to US Rt. 29. Site runoff may not release to US Rt. 29. Provide grade, spot elevations, and inlet capture as needed to route runoff to on -site storm detention and prevent off -site release into US Rt. 29. (Rev. 1) Persists. Applicant: `Less water is to be released from that area of the site in post -development conditions than in pre - development. It is unclear based on the existing topography we have of that travelway whether water will drain from the new entrance to an existing DI outside of the ROW or not. We will need to visit the site and get some more spot elevations.' 27. Level 1 dry conveyance swale design is ambiguous: Level 1 and Level 2 dry swales require underdrains that daylight. It is unclear if proposed dry swale (based on information presented) is more than a linear low point. (Rev. 1) NA. Applicant: `The dry swale has been removed.' 28. Provide VSMP /WPO plan. VSMP /WPO plan approval is required prior to Major Site Plan Amendment approval. (Rev. 1) Addressed. VSMP /WPO202000033 review comments sent to Applicant on 2/24/20. 29. Provide means for off -site slope runoff to cross CG-2. For example: Provide grade, stone pretreatment, and curb cut so slope runoff from the south and from channel created by proposed -to -existing grade ties on slopes to the south may reach proposed new paved surface and transit site to storm collection /conveyance. (Rev. 1) Addressed. Applicant: `A berm is now provided to direct water away from the parking lot (as it is directed in existing conditions by the concrete channel). C6 30. Show dry swale underdrain connection to downstream receiving point (daylight /piped system). (Rev. 1) NA. Applicant: `The dry swale has been removed.' 31. Provide public drainage easement for dry swale underdrain that extends to receiving point. (Rev. 1) NA. Applicant: `The dry swale has been removed.' Engineering Review Comments Page 3 of 4 32. If dry Swale underdrain receiving point is a piped system, provide public drainage easement for portions of existing piped system outside VDOT ROW. (Rev. 1) NA. Applicant: `The dry swale has been removed.' 33. Provide SWM facility easement for dry swale, and storm detention system elements. (Rev. 1) NA. Applicant: `The dry swale and storm detention system have been removed.' 34. Provide separate easement plat for SWM facility easement and public drainage easements. (Engineering will format both SWM facility and drainage deed templates once easement plat comments are addressed.) (Rev. 1) NA. Applicant: `The dry swale and storm detention system have been removed.' 35. Easement plat recordation is required prior to Major Site Plan Amendment approval. Note: Planning may require easement plat deed bk.-pg. reference be shown on the Site Plan Amendment. (Rev. 1) NA. Applicant: `There are no longer proposed easements.' 36. Sloped section of new 36" HDPE is designed to experience two-way flow (inflow, w/ negative slope). This design will not be approved. Two-way flow is not approved. Design limits velocity to zero when flow transitions, in to out. This (periodic) zero -velocity section of 36" HDPE will experience debris deposition that will short-circuit performance. This upslope section of pipe connects with Sir. A3, which outlets to a 15" DIA HDPE which connects with a weir structure in MH A2. Anticipate performance issues nearly immediately once flow reverses, velocity is zero, and debris settles. This two-way section of 36" HDPE is not an outlet pipe, will not experience self-cleaning velocities, and dead ends. Any piped storm system must ensure adequate one-way flow with at least 0.5% positive grade in direction of flow. Design proposes negative grade for water entering this section of pipe from A3. Revise design. Avoid designs that may work briefly under ideal /hypothetical conditions. Design revision may be accomplished via conventional storm system design that meets drainage plan review checklist (guidelines) for plan reviewers. Copy attached. (Note: Innovative designs encounter construction and other unforeseen circumstance. Please consider post -construction challenge certifying As -built or performance conditions of stormwater systems, including detention elements at Hillbrook and Sparrow Hill subdivisions.) (Rev. 1) NA. Applicant: `The detention system has been removed, but this has been acknowledged for future plans. Thank you.' 37. Provide VDOT LD-204, LD-229 (inlet and stone sewer design computations). Include additional or increased flow in existing storm pipes in LD-229 table. (Rev. 1) Addressed. Applicant: `This information is now provided. The existing storm pipes do not have an increased flow —overall site drainage curve number /area to existing pipes has decreased.' 38. Str. Al appears to capture and convey a portion of site runoff without detention. Please ensure VSMP /WPO plan accounts for un-detained flow. (Rev. 1) Addressed. Applicant: `The VSMP does account for this, thank you.' 39. Please ensure VSMP plan accounts for off -site slope runoff. Also, item 29 above. (Rev. 1) NA. Applicant: `The berm was added prior to VSMP submittal, so offsite water is not included.' 40. Provide CG-6 curb with stone inlets wherever curb is adjacent to storm inlets. (Rev. 1) Addressed. As follow- u : Please label CG-2, CG-6. 41. Provide CG-6 wherever paved area (sheet) runoff concentrates against a curb. (Rev. 1) Addressed. As follow- u : Please label CG-6. 42. C7: Label circled hatched area, which appears on sheets C4-C7. (Rev. 1) Addressed. Graphic removed. Engineering Review Comments Page 4 of 4 08 92 ]9 20 20 76 \- 20 9 S� AE.. AS 10 n0.ESALES 0 yPNR C9: 43. Check profile captions against graphic depictions, revise as needed. 44. Revise profiles once storm system is revised. Also, item 36, above. 45. Provide plan view of any MH Structure equipped with weir. Check for conflicts in 3 dimensions, including placement of MH steps, internal geometry, clearance required to examine /clean -out detention pipes. On the site plan and WPO plan, provide VDOT inlet shaping, steps, pipe bedding, and CG-6 (IS-1, ST-1, PB- 1) details. 46. Provide weir plate debris cage detail (site and VSMP /WPO plans). (Rev. 1) NA. Applicant: `No longer applicable.' 47. VDOT land use permit is required for work within VDOT ROW. (Rev. 1) Applicant: `Acknowledged. No work is proposed within the ROW at this time.' 48. Provide CG-12 detail. (Rev. 1) NA. CG-12 is not required. Please feel free to call if any questions: 434.296-5832-x3069. Thank you SDP2020-00039 Malloy Ford -Maj Site Plan Amend_SDP1987-6 072420revl