Loading...
HomeMy WebLinkAboutWPO201200086 Calculations 2020-07-27THE PRESERVE AT GLENMORE STORMWATER MANAGEMENT CALCULATIONS PACKET (AMENDMENT) Date of Calculations J U LY 20, 2020 PREPARED BY: COLLINS """TRING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com 62C- 62C 62B 62B +. 51D i 62C 62C 51 C 80 B Tl 95 Y , 51B 51B 51D 51C yloosto�e C�eeK Soils Table (Source: NRCS Web Soil Survey Online Database) Albemarle County, Virginia (VA003) Albemarle County, Virginia (VA003) J Map Unit Map Unit Name Acres Percent Symbol in AOI of AOI 51B Bugley 7.5 5.0 s�- channery silt loam, 2 to 7 percent slopes 51C Bugley 14.0 Q. channery silt loam, 7 to 15 percent slopes 51D Bugley 44.1 29.3% channery silt loam, 15 to 25 percent slopes 62B Buffstat silt 34.0 22.6% loam, 2 to 7 percent slopes 62C Buffstat silt 35.9 23.9% loam, 7 to 15 percent slopes 80B Littlejoe silt 5.4 3.6% loam, 2 to 7 percent slopes 05 Hatboro silt 9.3 6.2% loam, 0 to 2 percent slopes, occasionally flooded Note: Soils' properties within this subarea are predominantly composed of hydrologic type B soils. Precipitation Data (Source: NOAA's National Weather Service, Hydrometerorological Design Studies Center, Atlas 14 Point Precipitation Frequency Estimates) s c ea Map U o Heslbnrlee Apo I� Terrain PC S y API vyes(erh30" a i 6. 9b C o 0 Gkmmie Q Qa � q Country `CO Gt Club F� Q C cwsy- 0-oo'' �a g° 04enq Wi'i1erj,, n ,s I Grey Ir-- rc Y OSC V 0i 0 0 m` U e J0.4km d.2mi POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH 90%CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOAA Atlas 14, Volume 2, Version 3 PDSa3ased precipitation frequency estimates with 90% confidence intervals (in inches)' Asaa9e rewrenm iftr el (yeas) OureBonl�I�OS 10 ®I� tro 200 ® t999 24h 2.8 AB 4A5 518 BA7 7S1 aA5 991 31A 73A (2.5 .24) 11 (3.123.92) 11 (3.9&5.01) (5.7&728) (8.B1b.40) (].559.B8) (8.5&11.0) (10.0.13.1) (112-14.9) SCS TR-55 Calculations U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 2: Runoff Curve Number and Runoff Project: The Preserve at Glenmore SWIM Amendment Designed By: SRC, PE Location: Grey Heron Road, Keswick, VA Checked By: SRC, PE Check One: Present X Developed 1. Runoff curve Number (CN) FL-ENG-21A 06/04 Date: 1/23/2020 Date: 1/23/2020 Cover description Soil name and CN (weighted) _ Drainage Area hydrologic group (Cover type,treatment, and hydrologic condition; ON Area Product of CN total product/ Calculated Description percent impervious; us connected (Acres) xArea 'S'Value (Appendix A) totalarea impervious area ratio) area ratio) DA'A' Impervious Areas 98 0.37 36.3 B Woods in Good Condition (75%+/-) 55 20.80 1144.0 56 7.86 (Present) Lawns in Good Condition (25%+/-) 61 0.95 58.0 DA'A' Impervious Areas 98 1.49 146.0 B Woods in Good Condition (75%+/-) 55 0.00 0.0 63 5.75 (Developed) Lawns in Good Condition (25%+/-) 1 61 1 20.63 1 1258.4 2. Runoff 1-Year Storm 2-Year Storm 10-Year Storm Drainage Area Description Frequency -years 1 2 10 n/a Rainfall, P (24 hour)- inches 2.87 3.48 5.26 n/a Runoff, Cl- inches 0.18 0.37 1.18 DA'A'(Present) Runoff, Cl- inches 0.40 0.67 1.71 DA'A'(Developed) U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Warkaheet 3e Time of Concentration (TJ or Travel Time [T j Project: The Preserve at Glenmore SWM Amendment Designee By: SRC, PE Location: Grey Heron Road, Keswick, VA Checked By: SRC, PE Check One: Present X Develaped X Check One: Tc X Tt Segment ID: Sheet Flow: (Applicable to Tc only) 1 Surface description (Table 3-1) 2 Manning's roughness craft, n (Table 3-1 3 Flow length, L (total L< 10D) (ft) 4 Two-year 24-hour rainfall, Pz (in.) 5 Land slope, s (ft/ft) 6 Compote T,=(0.00](n'Lf6 /P sso4 Shallow Concentrated Flow- 7 Surface description Upaved or unpaved) 8 Flow Length, L(ft) 9 Watercourse slope, s(ff/ff) 10 Average velocity, V(Figure 3-1)(ff/s) 11 Tr=L/36WV Channel Flaw: 12 Crass sectional Now area, a (ft) 13 Welted perimeter, P. (ft) 14 Hydraulic radius, r=a/P.(fl) 15 Channel Slope, s(ft/ff) 16 Manning's Roughness Coeff, n 1]V=[1.49rfs° ] / n 18 Flow length, L (ft) 19 Tr L/ 3600W 20 Watershed or subarea T, or T, (Add Tr in steps 6,11 and 19) Through subarea n/a FL-ENG-21A 06/04 )ate: 1/23/2020 Wte: 1/23/2020 DAW DA'A' (Present) (Developed) Dense Grass Dense Grass 0.24 0.24 100 100 3.] 3.] 0.045 0.045 0.16 0.16 Unpaved Unpaved 962 962 0.0] 0.0] 4 4 0.0] 0.0] U.S. Department of Agriculture Natural Recouroes Conservation Service TR 55 Worksbeet 6: Graphical Peak Dimharge Method FL{NG-21C O5/06 Project: The Preserve at Glenmore SWM Amendment Designed By: SRC, PE Date: 1/23/2020 Ittation: Grey Heron Road, Keswick, VA Checked it, SRC, PE Date: 1/23/2020 Cbxk One: Present A Developed A 1. Data Oaina,Area Description DminMe Area Description Drainage Area Description Drainage Area Description DA •A• (Preaent) DA •A• (Developer) Drainage Area'Am)ia miles°= DOM6 DOb6 RunoHmrve number [N= 56.0 63.5 Time of mncen[ration (Tc)= Dn 0.23 Ramfaii ristnbu[inn Up- II II Pond and swamp areas spread throughout the wMeabed= 0 0 2. Frequed, years 1 2 10 1 2 10 3. Rainfall, P(20 boury inches 2.82 3.08 5.26 2.87 1,18 516 6.Inhial Abrtmcdori inches L573 1.5]3 L573 1.150 1.150 1.150 S. Compute la/P 0.55 0.05 0.30 0.E0 0.33 012 6. Unit peak discharge, Du-mndri 300 655 620 ]. Runoff, D hom Worksbeet 2-inches 0.18 0.37 1.18 0.00 0.62 171 B. Pond and Swamp adjustment faMq Fit 1 1 1 1 1 1 9. Peak Discharge, Op chs vfiere Dp=Ou Am D Fp 1.90 5.85 22.25 Round through SWM Faradic, Note: Du of 1" min / inch is the most mnservative SIN TR-SS Du. Outflow Summary: (1-Year Storm Event) J DA 'A' 1 1.90 cfs 1 0.71 cfs (Routed) Outflow Summary: (2-Year Storm Event) DA 'A' 5.85 cfs 5.25 cfs (Routed) Outflow Summary: (I 0-Year Storm Event) DA 'A' 27.25 cfs 27.18 cfs (Routed) 9 VAC 25-870-66 Section B: Channel Protection (Energy Balance Calculation fit) "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria in subdivision 1, 2 or 3 of this subsection..." Section B.1: Manmade stormwater conveyance systems "When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land -disturbing activity, either..." a. or b. shall be met: Section B.l.b. "The peak discharge requirements for concentrated stormwater flow to natural stormwater conveyance systems in subdivision 3 of this subsection shall be met." Section 8.3 "... the maximum peak flow rate from the one-year 24-hour storm following the land -disturbing activity shall be calculated either.." a. or b." Section 6.3.a. In accordance with the following methodology: Q Developed < I.F. * (Q Pre -Developed *[RV Pre -Developed *A Pre -Developed)) (RV Developed* A Developed) Q Allowed < 0.71 cfs Where: Q Pre-Developed 1.90 cfs (From Worksheet 4 Watershed Summary) CN pre -Developed= 56 (From Worksheet 4 Watershed Summary) S Pre -Developed = 7.86 (From SCS TR-55 eq. 2-4) RV pre -Developed= 0.18 in. (From SCSTR-55 eq. 2-3) A Pre -Developed= 22.12 ac. (From Worksheet 4 Watershed Summary) CN Post -Developed= 63 (From Worksheet 4 Watershed Summary) S PostDeveloped= 5.75 (From SCS TR-55 eq. 2-4) RV port -Developed— 0.40 in. (From SCS TR-55 eq. 2-3) A Developed 22.12 ac. (From Worksheet 4 Watershed Summary) I.F. = 0.80 (Factor of Safety) Q Developed = 0.71 cfs Section 8.4 Limits of Analysis The analysis terminates at the onsite subareas since subsection B.3.a is met. Level I Wet Pond Design & Routing Calculations WET POND W DESIGN & REQUIREMENTS: Treatment Volume, Tv (VRRM) Minimum Treatment Volume Required for Level 1 Treatment Volume Provided at MWSE Minimum Percentage of Tv Provided at MWSE Percentage of Tv Provided at MWSE Minimum Forebay Volume Required (15%of Tv) Forebay Volume Provided SfORMWATER Elevation (ft) Area of Forebay Cell Contours(sf) Volume(cf) 350 0 352 0 353.5 25 0 354 61 41 356 354 394 358 827 1,542 360 1450 3,790 Elevation (k) Total Facility Area Contours(sf) Volume(cf) 350 4,582 0 352 5,945 10,497 353.5 7,071 20,247 354 7,841 23,974 356 11,223 42,937 358 15,029 69,096 360 19,310 103,346 20,116 of 20,116 of 20,247 of 100 % 101 % 3,017 of 3,m of Elevation (ft) Area of Main Cell Contaurs(sf) Volume (cf) 350 4,582 0 352 5,945 10,497 353.5 ],NG 20,229 354 7,780 24,181 356 10,869 42,451 358 14,202 67,448 360 17,860 99,440 Notes- 1 A minimum forebay volume depth of 4' with an aquatic bench 4' wide, 2' deep has been provided. 2 A minimum forebay volume of 15%of the total Tv has been provided. 3 A maximum water depth of 4' during normal operating conditions is proposed, therefore an aquatic bench and a safety bench is not required (Sec. 6.3). 4 The minimum treatment volume required has been provided. 5 Wet pond side slopes of 4:1 are proposed upland of the permanent pool "to promote better establishment and growth of vegetation" per DEQ specification N14. Submersed 2:1 grades below the MWSE are acceptable. BasinFlow printout INPUT: Basin: The Preserve at Glenmore - SWM Amendment 7 Contour Areas Elevation(ft) Area(sf) Computed Vol.(cy) 350.00 4582.00 0.0 352.00 5945.00 388.8 353.50 7071.00 749.9 354.00 7841.00 887.9 356.00 11223.00 1590.3 358.00 15029.00 2559.1 360.00 19310.00 3827.6 Start_Elevation(ft) 353.50 Vol.(cy) 749.90 5 Outlet Structures Outlet structure 0 Orifice name: Proposed Barrel area (sf) 7.069 diameter or depth (in) 36.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 350.000 multiple 1 discharge out of riser Outlet structure 1 Orifice name: Low Flow Orifice area (sf) 0.136 diameter or depth (in) 5.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 353.500 multiple 1 discharge into riser Outlet structure 2 Orifice name: Mid Flow Orifice area (sf) 1.396 diameter or depth (in) 16.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 355.370 multiple 2 discharge into riser Outlet structure 3 Weir name: Proposed Riser diameter (in) 42.000 side angle 0.000 coefficient 3.300 invert (fl) 357.150 multiple 1 discharge into riser transition at (fl) 1.063 orifice coef 0.500 orifice area (sf) 9.621 Outlet structure 4 Weir name: Proposed Emergency Spillway length (ft) 12.000 side angle 0.000 coefficient 3.300 invert (fl) 359.000 multiple 1 discharge through dam 4 Inflow Hydrographs Hydrograph 0 SCS name: 1-yr SCS TR-55 24-hr Design Storm Area (acres) 22.120 CN 63.000 Type 2 rainfall, P (in) 2.870 time of conc. (hrs) 0.2300 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 8.771 peak time (hrs) 11.991 volume (cy) 1128.236 Hydrograph 1 SCS name: 2-yr SCS TR-55 24-hr Design Storm Area (acres) 22.120 CN 63.000 Type 2 rainfall, P (in) 3.480 time of conc. (hrs) 0.2300 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 15.009 peak time (hrs) 11.991 volume (cy) 1930.568 Hydrograph 2 SCS name: 10-yr SCS TR-55 24-hr Design Storm Area (acres) 22.120 CN 63.000 Type 2 rainfall, P (in) 5.260 time of conc. (hrs) 0.2300 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 38.708 peak time (hrs) 11.991 volume (cy) 4979.010 Hydrograph 3 SCS name: 100-yr SCS TR-55 24-hr Design Storm Area (acres) 22.120 CN 63.000 Type 2 rainfall, P (in) 8.650 time of conc. (hrs) 0.2300 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 96.686 peak time (hrs) 11.991 volume (cy) 12436.656 OUTPUT: Routing Method: storage -indication Hydrograph 0 Routing Summary of Peaks: inflow (cfs) 8.728 a1 discharge (cfs) 0.705 ; water level (ft) 355.370 storage (cy) 1341.509 1-yr SCS TR-55 24-hr Design Storm 11.98 (hrs) it 12.66 (hrs) at 12.74 (hrs) Hydrograph 1 Routing Summary of Peaks: 2-yr SCS TR-55 24-hr Design Storm inflow (cfs) 14.934 at 11.98 (hrs) discharge (cfs) 5.246 at 12.22 (hrs) water level (ft) 356.042 at 12.22 (hrs) storage (cy) 1607.931 Hydrograph 2 Routing Summary of Peaks: 10-yr SCS TR-55 24-hr Design Storm inflow (cfs) 38.516 at 11.98 (hrs) discharge (cfs) water level (ft) storage (cy) 27.184 at 12.10 (hrs) 357.628 at 12.10 (hrs) 2357.009 Hydrograph 3 Routing Summary of Peaks: inflow (cfs) 96.206 a discharge (cfs) 74.246 water level (ft) 359.047 storage (cy) 3183.527 100-yr SCS TR-55 24-hr Design Storm t 11.98 (hrs) at 12.08 (hrs) at 12.08 (hrs) Sat Jul 18 10:42:51 EDT 2020 Approved Plan 1999 VSMH Water Quality Calculations Preserve at Glenmore Road Plan Short Version BMP Computations For Worksheets 2 - 6 Albemarle County Water Protection Ordinance: Modified Simple Method Plan: Extended Detention Basin Water Resources Area: Development Area Prepares AML, PE Date: 17-Oct-12 Project Drainage Area Designation Drainage Area to Detention Basin L storm pollutant export in pounds, L = [P(Pj)RV12 ] [ C(A)2.72 ] Rv mean runoff coefficient, Rv= 0.05 + 0.009(I) Pj small storm correction factor, 0.9 I percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area, C pollutant concentration, mg/I or ppm target phosphorus f factor applied to RR V required treatment volume in cy, 0.5' over imperv. area = A(1)43560(0.5/12)127 RR required removal , L(post) - f x L(pre) %RR removal efficiency, RR100/L(post) Impervious Cover Computation (values In feet & sauare feed Item pro -development Area post -development Area Roadway Length Width subtotal 13924 Length Width subtotal 38007 13924 38007 Sidewalk Length Width subtotal 0 Length Width subtotal 0 -EL F Gravel areas Area x 0.70 = Area x 0.70 = Structures Area no. subtotal 2074 2074 Future houses Area no. subtotal 125288 125288 Grass Area 912701 x 0.08 = 73016 Grass 800252 x 0.08 = 64020 Active crop land Area x0.25= Area x0.25= Other Impervious Areas Impervious Cover 9% 247% l(pre) Rv(post) V 0.26 350.8 New Development (For Development Areas, existing Impervious cover <= 200/4 C f I (pre)' 1 Rv(pre) L(pre) L(post) RR %RR Area Type 0.23 1 17.851 20.36 2.51 12% Development Area gpost) Virginia Runoff Reduction Method Water Quality Calculations (for Amendment) Drainage Area A D2inaee Nea Aland Coder laered A Salk I Bsod: csod: oson: Tmab Una fever Rv pen innrsdoSpare lxraxl oao 0.00 MW ManaptlTurflarnl 20.63 2063 0.20 Impmiouxtwegarnl 1A9 1.09 0.95 ToUI 22.12 Stormwater Best Manaliernent Practices MR = RDDnff Reduction) Total Phosphoroa Available for Removal in D.A A(Ib/yr) SL60 PortDewelopment Tremeent Volume in 0A AiRai 1 20,116 _Calve fmm AmnAmVn liax_ Runoff Managed Impervious VUl--rom Ru Remaining TMaIBMp pbaaerval pboapborus Unheated oma Remaining Pfdtti[! Reduction d. EoeerEredb Uprtream fti Redu[tion Runoff Treabnent Remora) Load from Pbospborus RemOred By Reanow PFospbomi DJxmrtream Pnttice to be [red'n (%) Area br Area(acrcR) Area (aces) Pnttice (hs) (to) Volume(Ra) Volume(Ra) Efficienry(%) Up,.(l Loaato prattice(Ib) Land(11, Employed Pattices 116) Pactice(Ib) 1- vabwew Bun(wz (sper.) as 0 0 0 0 oN o.O] ot0 lbvegesa[eaxnnf wz lsperas 60 0 0 0 0 oao 0.00 000 2. Rooftop Cilsommeetion (RR) 2.a. smple 0lxnnreatinn to AM Irk (BPeral) so 0 0 0 0 0 ot0 oao o.O] 000 3 b. Smple Oisonn¢tion b C/O In, 6pea1) 2s 0 0 0 0 0 OLO oN O.O] OLO Lr. Tobll Ammtletl faker Pak ax Per xpearratimn lex., M wild(sperxal so 0 0 0 0 0 W. oao 0.. am za. Tn Dr, well, Rmm Drainxy Miwinfilra[ion w1 Pper 48) so 0 0 0 0 zs o00 oao o.O] oao ze Tn Orywminr Rercbbnlnwz , Mirme. anon SpmwBl 0 0 zs at0 oao 0..me,p2 2.cmxam Gardmm, Mbmaorteminn .I(Sper del 0 0 0 0 zs nrV oao 0.. D 0o 4.1OBain GaNma2, Mmem reRntionaz ISper MI B0 0 0 0 0 50 000 oW 0.. 000 z.b. TO Rear-rer xa um, lscer wsl 0 0 0 0 0 0 oa o00 0.m o00 z:. Tn SformmaR, Plantm, Dean Bbreremion ISpee a5, Appman Al W 0 0 0 0 zs ot0 000 oO] 000 3 Permeable pavement (RR) 3e. Permeaae Poremmt wl gpm all as 0 0 7aa0 000 000 nM 3. b Permeade Palmer, az View an IS 0 oN O.O] -M <.a. ruao name MB Suilx(Sper a3) 20 0 0 0 ot0 oN m- I- ab. Gras Manrel M Sualx (5ler a3) ]O 0 0 0 o OLO oN O.O] OLO ra— clnnl xim fmmport Amended! 5uilx 0 0 0 0 ot0 oao o.O] ot0 per, lane Sper no an I I I0 oII I I Da I o.0o I o.00 I Da Nitrogen NNrogen Load Untreated Nitrogen Remaining Removal kom Upstream NRragen load [o Removetl gy NNrogen -icienuy(%) Pmaice(Ibs) Paaice(Ibs) practice(lbs) Wad (firs) 20 5. Dry Swale (RR) 5. Dry Swale (RR) 6. BioreUntion (RR) N Xex_CmrY®xe_9pev41®I Jf Te Prvrw MrwWreM DkA 6b. Biortenlion N2w MicmBioMen[ion N2 GP-.' &t 0 0 50 "'i OLO ON 60] 7 Infiltration RR) 1.a.loducco.41( .) so 0 o ss D.m oa Bm D.m 1.b.lnmmtmn Nzlsps rel so 0 o ss D.m oa Bm D.m S. Extended Detention Pond (RED .a. Fn#1 gperx15l o o D.m ow Bm D.m 81,. E0 p1(5per M15) 15 0 0 0 0 15 0.0] OLO E. 0.0] TOTALIMPERWOUS COVER TREATED (ac) 0.00 AREACHECR: OR. TOTALMANAGED TURF AREA TREATED (ac( 0.00 AREACHECR: OR. TOTAL RUNOFF REDUCTION IN D.A A TOTALPHOSPHORUSAVAIIABLE FOR RFMOVALIN DA A(Ib/yr 12: TOTALPHOSPHORUS REMOVED WITH RUNOFF REDUCTION PRACTICES IN D.A. A(Ib/yr 0.0G TOTAL PHOSPHORUS REMMNING AFTER APPLYING RUNOFF REDUCTION PRACTICES IN D.A. A (Il 12. SEE WATER QUALITY COMPLIANCE TAB FOR SITE COMPLIANCE CALCULATIONS 10- Wirt Nl i" It) 0 C 0 z0 000 ot0 oN 0.00 10 b.. Swale xE Prou M1 0 0 W 000 OLO ON "A" .aFl[ering Prarlirepl lSpec Nlll 0 0 W 0W OLO 111b. F1[ering PraRiep3lSPec N]3I 0 0 0 0 0 65 0W OLO ,12. Constructed Welland (no RR) O.a.Coortwaea Wmana xl G, xLt 0 o o o o.oR in.7F77 D.m 1z b. cunmuraawmana ez lsperxlil 0 0 0 011CAD 000 oa0 O.oO 113. Wet Ponds (no RED 13.a.WHPord.1(1p-x1U 0 DArs 149 0 0 Dol Mr. 50 OD] 1261 -1 -1 13b WHPed#1(CoamlPl,a)(Spmnlal 0 0 0 0 o as "'1 oDE ILW 0D] 11ewHPonaxz Dp-P1U o 0 0 0 0 is "'1 0- oW 0.0] va.WxtPonaxz(maaelwamllsperx1U 0 0 0 0 0 ss o.00 000 oao o.00 w D.m oao apo "'i R. Extended Detention Pond (RR) 9. ShoetRow W Fiher/Open Space (RR( TOTAL RUNOFF REDUCTION IN D.A. A(Ra) 0 NITROGEN REMOVED WITH RUNOFF REDUCTION PRACTICES IN D.A. A(Ib/yr ODO SEE WATER QUALITY COMPLIANCE TAB FOR SITE CALCULTONS (In)ororation Only) 10. Wet Swale PC ..at Plain) (no RR) 11. FiRering Practices (no RR) 12. Constructed Wetland (no RR) DO cond LEND N Hr_CmrY®xe_9pev41®I Jf Te Prvrw MrwWreMDkA 14. Manufactured Treatment Devices (no RR) TOTAL IMPERVIOUS COVER TREATED(ac) 1.09 AREA CHECK: OR. TOTAL MANAGED TURF AREA TREATED (ac) 20b3 AREA CHECK: OR. TOTAL PHOSPHORUS REMOVAL REQUIRED ON SITE(Ib/yr 3.5] TOTALPHOSPHORUS AVAILABLE FOR REMOVAL IN OA A(Ib/Yr 12.GC TOTAL PHOSPHORUS REMOVED WITHOUT RUNOFF REDUCTION PRACTICES IN D.A. A(Ib/Yr G31 TOTAL PHOSPHORUS REMOVED WITH RUNOFF REDUCTION PRACTICES IN D.A. A(Ib/Yr 0.00 TOTALPHOSPHORUS LOAD REDUCNONACHIEVED IND.AA(Ib/yr 6Z TOTAL PHOSPHORUS REMAINING AFTER APPLYING BMP LOAD REDUCTIONS IN DA. A(Ib/, 633 SEE WATER QUALITY COMPLIANCE TAB FOR SITE COMPLIANCE CALCULATIONS KOFF REDUCTION PRACTICES IN D.A. A(Ib/yr 0.00 KOFF REDUCTION PRACTICES IN D.A. A (Ib/yr 27.03 TOTAL NITROGEN REMOVED IN D.A. A(Ib/yr 27.03 30. Manufactured BMP (no RR)