RE: AutoZone Charlottesville Store #6464 — VSMP Permit Plan Review— WP0201900043 -
Comment Response Letter
Dear Ms. Cox:
We have reviewed all of your comments from March 4, 2020 and made the necessary revisions.
Please find our responses to the comments below in bold lettering.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP
must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Registration statement must be filled out and signed.
Acknowledged. The signed registration statement will be provided prior to final site plan
approval.
Rev.1: Comment not addressed.
The registration statement will be signed once property has been purchased by the developer.
Rev.2: This must be provided before land disturbance permit is issued.
A signed registration statement is included with this submittal.
2. Section 9 (signed certification) must be signed.
Acknowledged. Executed signed certification page will be provided prior to final site plan
approval.
Rev.1: Comment not addressed.
The signed certification will be signed once property has been purchased by the developer.
Rev.2: This must be provided before land disturbance permit is issued.
A signed Section 9 is included with this submittal.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. No comments.
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-
403.
1. Nutrient credits must be purchased before plan can be approved. Please contact Ana
Kilmer before purchasing the credits.
Acknowledged. Nutrient credit availability letter has been added to the calculation book.
Purchasing of nutrient credits will be coordinated with Ana Kilmer.
Rev.1: Comment not addressed.
Correspondence with Ana Kilmer has been initiated.
Rev.2: Comment not addressed, but in process. Nutrients must be purchased before land
disturbance permit can be issued.
Nutrient credits have been purchased. Affidavit & Bill of Sale have been sent to Ana Kilmer.
2. SWM Maintenance agreement must be recorded before plan can be approved. Please
contact Ana Kilmer to start this process.
Acknowledged.
Rev.1: Comment not addressed.
Correspondence with Ana Kilmer has been initiated.
Rev.2: Comment not addressed, but in process. Plan cannot be approved until the SWM
Maintenance Agreement is recorded.
The SWM Maintenance agreement has been executed and recorded.
Reference Deed Book 5357, pages 121-130.
3. A plat and deed showing the SWM facility easement must be recorded before the plan
can be approved.
Acknowledged.
Rev.1: Comment not addressed.
Location and label confirmed by County Planning and Engineering via email dated 1/30/20.
This plat will be provided once obtained.
Rev.2: Comment not addressed. Plat must be recorded before land disturbance permit can be
issued.
The SWM Easement Plat will be resubmitted once the deed has been signed. Deed book and
page number to be added to the site plans once the plat is recorded.
4. Clearly show the extent of the SWM Facility easement.
Stormwater Easement Plan has been added. See Sheet C2.3.
Rev.1: Please label this easement to be SWM facility easement. Ensure this matches the final
site plan.
Callouts have been updated accordingly. See Sheets C3.0 & C2.3.
Rev.2: Comment addressed.
5. Provide a detail of the SWM facility. Will there be a trash rack? What size are the
manholes/openings? Are they accessible for maintenance? Are there any special
installation instructions?
Site specific detail of SWM A to be provided once received.
Rev.1 Comment not addressed.
Shop drawings for the proposed SWM facility, addressing these items, have been added to
Sheet U.C.
Rev.2: Comment addressed.
6. Provide maintenance requirements for the SWM facility on the plans.
Detention Pipe Maintenance schedule has been added to Sheet C1.6.
Rev.1: Comment addressed.
7. Provide the following checklist on the plans:.
Checklist added to cover C0.0.
Rev.1: Comment addressed.
8. Please double check all calculations. Page 7 of the calculations does not match Sheet
C1.6 (1.03 vs 1.06 etc).
Due to the removal of the proposed entrance from Route 29, areas have been updated and
double checked.
Rev.1: Comment addressed.
9. Please double check the DA for inlet 118.
Drainage Areas have been updated per the plan changes.
Rev.1: Comment addressed.
10. Are the storm pipes sized for the future development? It is clear the SWM facility was
sized/routed for it, but the storm calculations do not appear to include the future area
(the DA for 112 is 0.69 c factor for future building area).
The pipe calculations for future development are not being performed at this time. They will
need to be computed at the time of the future development design. The SWM facility has
been sized for a conservative potential option so that the pipe will not need to be replaced.
The details of how the inlet and pipe calculations would change with the future development
are too specific to assume.
Rev.1: Comment not addressed. The pipe and inlet calculations should include the future
development if they will eventually handle runoff from that area. For example, 204-202-SWM A.
Where will the future development tie in? If it goes directly to SWM A, then no calculations
necessary and comment is addressed.
With the future development, the roof drainage will connect directly to SWM A. That new
pipe will be analyzed with that proposed scope.
Rev.2: Comment addressed.
11.0.5% is the minimum storm pipe slope. The calculation shows some pipe slopes less
than 0.5%.
Pipes corrected to have a minimum slope of 0.5%.
Rev.1: Comment not addressed. There is a slope of 0.49% from 101-102.
The pipe calculations have been corrected.
Rev.2: Comment addressed.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code 62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion
control plan content requirements can be found in County Code section 17-402.
1. A soils type map was not apparent on the plans or in the calculation's booklet.
All soil on site is type 91. A callout has been added to Sheet C1.4.
Rev.1: Comment addressed.
2. Please show a wash rack at the construction entrance.
A callout and the detail have been added. See Sheet C3.3.
Rev.1: Comment addressed.
3. Please show mulching anywhere there is TS or PS.
Mulching has been added to sheets C1.4 and C1.5.
Rev.1: Comment addressed.
4. Per PGIII-72 pf the VESCH, please show there is a 2:1 length: width flow ratio for the
sediment trap flow path.
The sediment trap was reshaped, and a wood baffle was added to ensure a 2:1 flow ratio. See
Sheet 1.4.
Rev.1: Please add a detail for the proposed baffles and note that they must extend from the
bottom of the trap to 6" above the riser.
A Wood Baffle detail has been added to Sheet C1.3.
Rev.2: Comment addressed.
We have included PDF copies of the plans and calculations for your review. If you have any
questions or comments, please feel free to give me a call at 434.295.5624.
Sincerely,
( A4"� X�Lc,
Craig Kotarski, P.E.
Principal