Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSUB199900148 Plan - As-built Road Plan and Comps. 2004-03-31APPROVAL
DEPT. OF PLANNING VIRGINIA DEPT. OF HIGHWAYS
& COMMUNITY DEV
DEPT. OF ENGINEERING VIRGINIA DEPT. OF HEALTH
DEPT. OF ZONING ALBEMARLE COUNTY
SERVICE AUTHORITY
ALBEMARLE COUNTY FIRE OFFICIAL ALBEMARLE COUNTY BUILDING OFFICIAL
NOTE: ALL LOTS ARE REQUIRED TO HAVE A PRIVATE
PRESSURE REDUCTION VALVE INSTALLED BETWEEN
THE METER AND THE HOUSE PLUMBING.
GENERAL WATER AND SEWER CONDITIONS
Rev. January 27, t9%
1. Work shall be subject to inspection by the Albemarle County
Service Authority inspectors. The contractor will be
responsible for notifying the proper service authority
officials at the start of the work.
2. The location of existing utilities across the line of
the proposed work are not necessarily shown on the plans
and where shown, are only approximately correct. The
contractor shall on his own initiative locate all
underground lines and structures as necessary.
3. All meterials and construction shall comply with General
Water and Sewer Construction Specifications as adopted
by the Albemarle County Service Authority on January 15, 1998.
4. Datum for all elevation shown in National Geodetic Survey.
5. The contractor shall be resposible for notifing
"Miss Utiltiy" (1-800-552-7001).
6. All water and sewer pipes shall have a mimimum of
3 feet of cover measured from the top of pipe, over the
centerline of the pipe, This includes all fire hydrant
lines, service laterals and waterlines, etc.
7. All water and sewer appurtenances are to be located
outside of roadside ditches.
B. Valves on deadend lines shall be rodded to provide adequate
restraint for the valve during a future extension of the line.
ALBEMARLE COUNTY ENGINEERING
GENERAL CONSTRUCTION NOTES FOR PUBLIC ROADS
1. The abbreviation V.D.O.T. made hereafter refers to the Virginia Department
Of Transportation, the term County refers to -County Of Albemarle, Virginia.
2. Prior to any construction within any existing public right-of-way,
including connection to any existing road, a permit shall be obtained
from the Virginia Department of Transportation (VDOT). This plan as
drawn may not accurately reflect the requirements of the permit. where
any discrepancies occur the requirements of the permit shall govern.
3. Construction inspection of all proposed roads within the development
will be made by the County. The contractor must notify the Department
of Engineering (296-5861) 48 hours in advance of the start of
construction.
4. All materials and construction methods shall conform to current
specifications and standards of VOOT. All excavation for underground
pipe installation must comply with OSHA Standards for Construction
Industry (29 CFR Part 1926).
5. Erosion and siltation control measures shall be provided in accordance
with with the approved erosion control plan and must be installed prior to
any clearing, grading or other construction..
6. Upon completion of fine grading and preparation of the roadbed subgrade,
Ion
contractor shall have CBR tests performed on the subgrade soil.
Three (3) copies of the test results shall be submitted to the County.
If a subgrade soil CBR of 10 or greater is not obtainable, a revised
pavement design shall be made by the design engineer and submitted with
the test results for approval.
7. All slopes and disturbed ares are to be fertilized, seeded and mulched.
The maximum allowable slope is 2:1 (horizontal:vertical). Where
reasonably obtainable, lesser slopes of 4:1 or better are to be
achieved.
B. Surface drainage and pipe discharge must be retained within the public
right-of-way or easements prior to acceptance by VDOT (All drainage outfall
easements are to be extended to a boundary line or natural watercourse).
9. Where cross sections are installed, all residential driveway
entrances shall conform to V.D.O.T standard PE-1.
10. Where rural cross sections are installed, all residential driveway
entrances shall conform to VOOT Standard PE-1.
11. Paved, rip -rap or stabilization mat lined ditch may be required to
stabilize a drainage channel when, in the opinion of VOOT, the Director
of Engineering, or the Director's designee, it is deemed necessary.
12. A minimum clear zone of ten (10) feet from the edge of pavement shall be
maintained on all residential subdivision streets. Additional clear
zone may be required depending on the category of road design.
13. Compliance with the minimum pavement width, shoulder width and ditch
sections, as shown on the typical pavement section detail, shall be
strictly adhered to. Exceptions will not be allowed.
14. Upon completion of the roadway construction, street identification signs
shall be installed by the developer at all street intersections. Signs
and their installation shall conform to'V.D.O.T. standards. Signs may be
purchased through The Department Of Engineering. The developer shall be
responsible for maintenance of the signs until the roads have been accepted
into the state secondary road system.
15. Road plan approval is subject to final subdivision plat validation.
Should the final plat for this project expire prior,to signing the
recordation, then approval of these plans shall be null and void.
16. Traffic control or other regulatory signs or barricades shall be
installed by the developer when, in the opinion of the Director of
Engineering, or the Director's designee, they are deemed necessary in
order to provide safe and convenient access. All signs or other
regulatory devices shall conform with the Virginia Manual for Uniform
Traffic Control Devices.
17. Standard CO-1 or CO-2 underdrain areas required at all cut and fill
transitions and grade sag points.
18. Location of all signs to be shown on the plan: stop sign, street name sign,
speed limit sign, etc. (the speed limit is to be posted 5 mph below the
design speed).
19. All required signs to be furnished and installed by the developer prior
to acceptance.
20. Contractor shall field verify the length of all storm drainage pipe. Cross
slopes shall be maintained as shown.
21. Speed limit posting to be determined by V.D.O,T. prior to road acceptance.
Lo
SNEsi
DETAIL A
ROLL TOP CURB
6" Curb
Line
F
.-i
ff2
<w
R1
0
B 1 C I
ROLL TOP DIMENSIONS
A = 11.5"
B= 1' 0"
C = 2' 0"
D=2"
E=7"
F = 1' 6"
R1 = 1' 6"
R2 = 1' 3"
NOTES:
THE ROLL TOP CURBING OPTION MAY BE
USED UNLESS OTHERWISE INDICATED,
PROVIDED THAT:
A. CG-6 TYPE CURBING IS MAINTAINED
WITHIN 10 FEET FROM THE EDGE OF ALL
DRAINAGE STRUCTURES, AND
B. A MINIMUM TRANSITION OF 10 FOOT
BETWEEN CG-6 AND ROLL TOP CURBING
IS MAINTAINED
TYPICAL SECTIONS
N.T.S.
ROAD 'DESIGN SPEED 20 MPH
ROAD "B-1"
40' R/W
4' - 24'
3% max 114 11/4'. 1'
77 ,
ROAD "A, A- i, B, B-2 "
40' R/W
Back
of Curb
4' 5' 30'
3% max 1/4" : 1' _ 114" : 1
-4'�a��
�2•
3% max
SEE CURBING NOTES
3: 1
Back (2: 1 max.) of Curb
3%Max
SEE CURBING
NOTES * ROAD "A" IWILL HAVE A
PRIVATE ALLEY 4' SHOULDER WITH NO
SIDEWALK ON THE RIGHT
20' ACCESS SIDE.
EASEMENT
C90ZE-T
Rt - 240-
►-If-f �---x
Tabor St
sx rE
0
N co• Hi11 Top St.
VICINITY MAP
N. T. S.
PAVEMENT SPECIFICATIONS
ROADS A, B AND B-2
6" AGGR. BASE MATERIAL, Type I, Size 21A With Prime Coat
2 1/2" SM 9.5A SURFACE
ROADS A-i, B-1 AND ALLEY
6" AGGR. BASE MATERIAL, Type I. Size 21A With Prime Coat
2" SM 9.5A SURFACE
14'
4' 4' 10' 4'
CURBING NOTES:
3% max ill": 1' 1/4": 1' 3% max
1. CURBING SHALL BE ROLL TOP (SEE DETAIL A) OR CG-6,
7'-
2.,SEE SHEET 2 FOR LOCATION OF CG-6 OR ROLL TOP CURB.
3. PROVIDE A MIN. 10' TRANSITION BETWEEN ROLL TOP AND CG-6.
4.IF ROLL TOP CURBING IS USED, CG-6 WILL BE REQUIRED
10' EITHER SIDE of ALL DRAINAGE STRUCTURES.
HILL TOP STREET WIDENING
(NORTH SIDE) (SOUTH SIDE) HILL TOP STREET NOTES. ,-- OCTOBER 13,2003
- As°y=,Built Road Water San. Sewer=Phase 2
U
Z
O
C77
P
Cv
tl
U
a
H
z
M
O
Q
O
CD
D=
f -1
r n
cc
>
J
J
J
W
H
-=.ram •
cn
W
O
�
CD
CD
J
Cc
<
V
cn
cc
Q
_L
V J
O
>-
W
M
cl:
Cn
cn
W
Q
cc
Q
W
C-
5
0
H
o
cc
W
J
�
REVISIONS
DEC. 10, 1999
FEB. 14, 2000
MAR. 13, 2000
APRIL 14, 2000
Curb Note#4
Typ, Section
Ge!n. Note#4
MANY 3, 2000
MOT Comments)
JAN. 2,2002
AS BUILT
MAR. 19,2002
A.C.S.A. COMMENTS
1 4, 3 5' 1. HILL TOP STREET IS TO BE WIDENED TO 22' PRIOR R'EV: tD EC EM BER 15; 200 3
Maintain
22' Maintain AINY CONSTRUCTION UN PARKSIDE VILLAGE. A,C.S.A. Comments Phose2 DATE , 2" SM 9.5A SURFACE OVERLAY Existing Existing 0.5' REV: JANUARY 6 20.04
Crown down t/4' t' 2. A 2" OVERLAY ON HILL TOP �T1' WILL BE REQUIRED OCT. 7 1999
PRIOR TO ACCEPTANCE OF ANY ROADS IN PARKSIDE Engineering Comments Phase '
6" 21-A AGGR. BASE MATERIAL VILLAGE OR WHEN 24 HOUSES'h° PARKSIDE VILLAGE REV: MARCH 3,1, 2004 _
SHEET 62 i/2" BM 25.0 EXISTING
SURFACE HAVE BEEN OCCUPIED, WHICHEi,E`8 OCCURS FIRST. Street Trees Added
GRASS RUN SURFACE SCALE
VARIABLE STRIP TEMPORARY 3. MAINTAIN EXISTING DRAINAGE PATTERNS.
II WIDTH WALKWAY
v
i SyFFr 1�
�Alp
\\�rF
SEWER
NOTES RELATIVE TO EASEMENTS:
1.
COMMON AREAS ARE RESERVED WITH PRIORITY FOR WATER, SANITARY
AND STORM SEWER WHERE APPLICABLE, BUT NOT TO THE EXCLUSION
OF OTHER USES.
2.
THE DEVELOPER RESERVES A 10' DRAINAGE AND/OR UTILITY EASEMENT
ALONG ALL FRONT PROPERTY LIDS AND 7.5' ALONG ALL SIDE PROPERTY LINES.
3.
THE DEVELOPER RESERVES THE RIGHT TO VACATE OR REVISE ANY
EASEMENT HEREON PROVIDED THE PROPER AUTHORITY AGREES.
4.
TYPICAL EASEMENT ( N.T.S.)
20
20
1 0 '
TYPICAL EASEMENT UNLESS OTHERWISE
INDICATED FOR UTILITIES ON OR 51
TYPICAL EASEMENT FOR
BLOW -OFF ASSY. AND
WITHIN 10' OF PRIVATE LOTS.
- WATER METER ASSY.
jr
7 CENTER OF PIPE OR
OF
CENTER OF PIPE
SHALE/CHANNNEELINAGE
.,i
MANHOLE,STORM
BLOW -OFF ASSY. OR
STRUCTURE OR
WATER METER ASSY.
FIRE HYDRANT
5.
PRIVATE 10' SANITARY SEWER SERVICE LATERAL EASEMENTS ARE TO
BE CENTERED ON AS BUILT LOCATIONS,
6.
20' WATER, STORM,_AND SANITARY SEWER EASEMENTS ARE TO BE
CENTERED ON THE ASBUILT LOCATIONS OF THE LINES.
7.
THERE SHALL BE A PEDESTRIAN ACCESS EASEMENT OVER ALL WALKS.
B.
THERE SHALL BE AN ACCESS AND MAINTENANCE EASEMENT ASSOCIATED
WITH THE PERMANENT STORMWATER MANAGEMENT FACILITY LOCATED
IN THE COMMON OPEN SPACE ALONG THE STREAM.
I a - lifjmlii vmll
a WIT!, 14 W 111
W���ffilfg
GENERAL NOTES
1. ALL PROPOSED ROADS WILL BE PUBLIC.
2. ALL LOTS SHALL BE SERVED BY PUBLIC WATER, SEWER
AND ELECTRICITY.
3. ALL LOTS SHALL BE ACCESSED BY PUBLIC ROAD.
4. ROLLTOP CURBING MAY BE USED .
(SUBJECT TO V.D.O.T. AND ENGINEERING APPROVAL)
5. ONLY ONE DRIVEWAY WILL BE PERMITTED PER LOT.
6. STANDARD V.D.O.T. CG-12 CURB RAMPS REQUIRED AT ALL
SIDEWALK ANO STREET CROSSINGS.
®B.M. TOP OF SANITARY SEWER MANHOLE NEAR
`CORNER LOTS 10 & II. ELEV. 669. 10'U.S.G.S. DATUM
4\0
wun J. I--
�l off,
Cn
LEGEND
0-' S Proposed San. Sewer
+--- -® Proposed Storm Drain
Proposed Water Line
�'0 Proposed Water Service, double
Proposed Water Service, single
• Proposed Street Tree
SHEET
INDEX
SHEET
i
- COVER SHEET
SHEET
2
- OVERVIEW
SH'=ET
3
- ROAD "A" PLAN AND PROFILE
SHLET
4
- ROAD "A-1" PLAN AND PROFILE
SHEET
5
- ROAD "B" PLAN AND PROFILE
SHEET
6
- ROADS "B-1 AND "B-2" PLAN AND PROFILE
SHEET
7
- SANITARY SEWER PROFILES
SHEET
8
- SANITARY SEWER PROFILES
SHEET
9
- STORM DRAIN PROFILES
SHEET
.�E
le
OFF81TE SANITARY SEWER PEMN ANO PROFILE
,RY S Wcn nL A N ANDPROF TI E
SHEET
12_OOFFSKTIE-SANITARY
ARID PROFILE
SEWER PLAN
SHEET
13
OFFSITE SANITARY SEWER PLAN AND PROFILE-
CONTOUR INTERVAL
vJ
FILE NUMBER
7907
E E T
�V 092004
OF 14
Nily r'&d ir•o -
13
1
II REVISED AVERAGED ip \
x R u er ,
' RESERVED FOR PUBLIC DEDICATION ream �. \ 20` SAN. SEWER ESMT. �,_.•��
I UPON DEMAND BY THE COUNTY 20 W L \ D.B.1974 pp 487-492
RESERVED FOR PUBLIC IC DEDICATION
EASEMENT C2 ,, -.--. <._...- UPON DEMAND BY THE COUNTY
moll 4 ON 411
Z2 20 `SAN. SEWER ) \ m t-
2� �. ESMT. D //% :.� ! ` r (V . 0)
, .B.2415 pp.
// / �. �a �N p_1T �rn
x .q \ m , PCP 217-222 �' \ \ vd - W d
I C4 ti T COMMON -, ,` `^ ' 2 LO Oc��� C Q
I — ° OPEN SPIKE a
1 _ o Ze- 1 \ A .
I x I Z _ I 4.253-AC. S ', , �`bo a o�
10
ll
co
x3 I �3 X J/ ` Y can r. V5 pj ii ® End State
(487 " �" �3. (1�2) -D S TOR_M'pRAIN. ESMT :�!� �� ,^e ��" 20` S o Maintenance
I -14
I I B..2.4I5 Sign
PP217�222. r �' 4 PP 4 -492T A ,
.,® � r--- � , D B.197 R
t )
_Street
1 m
a
- (Z8
A
r., ,GRA Will
� S D �~ � akw; 8 Si
o
x ssl- sd► - o I \ 1 SIOF LTER \ \ W , •_
m Q I II ,, drai s RANG RRY LA E — ---
I can u / 'h, / w . �0 - ----�~�a
Ix c 1 �, & �j -1
- 5B /Q
willow -willow ;
I W e
I
` O
/H- v
� k
o illow
J'
Oak
+ Wi �
C5� ,' I . .►- I� 4✓ ��` +t; Q4 "X24" w
~�ti rg -- (201 to �./ o T P��tiv ati4�` /: z r..o Stop. Sign
ESMT I ; / . - I ra �Q��F Q CSC `. , )` �-
i M j� LATERAL .. -' -
L 10 PRIVATE SAN.,.. ' I DLO 0 ,'\ a�'�' . }'- �� x �,
Ix PRIVATE 5AN.LATERAL ESM1• ® p g 24i5 Pv 21T-222 I GG L� �, REVID AVERAGED ,Uj
�
I10 P 217-222 < , _ . �, �, y -0 ream u er a
2415 PP.
LOvi
Lon (0 Go
W �t
Q.N p0 SAS. $ E Q 0 �o�
_ ER ESMT `n a
c0 �. Z CO ,� 6.19 4'PP 87-492 H d' z Q
L O : Q Z Q Lu a
q _ ® _ w cn" /� <D I ;' ► _ `t n g rn B M. cn �• .3 C�
I
1 > / n;
m >- ,ate .a a N_.. o U 03¢
o
CV
� � V) X 3
"4 ► (14 I tin W -LO �° _ U / /
I —
I
m ° -- W W
• rr
� f � O f•
ILU f
z a �NO
.. Q
.., OCV
x
' HYDRANT ESMT. © _,.JO) W
2415 pP.217 -222 PRIVATE $AN. t Z w `L"� ` :N.. 'o�X2�
I ._
d.
D,B. 10 PR �' :' I _ ST RM DR
o LATERAL ESMT. ` t Lu r701 U., `� o �r� D B MT. v
p 87 4 P
I. 3
-+ 415 217-222 , � .
AIN E '
� � NO a {
I� D # cn I F Stop Sign X2-A
I I -
10 PRIVATE SAK LATERAL `
2415`pR 2
17-222 , - (R! j
7, � n � z � 1�
' w w �v
_ ,,, I cri aD
M D.B. a v �- c: W tv �o
E5 T. I• Q3-1 DRA1W__&S• ►� �,
I
• -
R_.LO
,
I ao , ( C , . � . �'. 20 2415 .217' ._...-"---•-'""' E c -I : � —NJ
w o� •a
tl7 U. ry
20' Ve etative ► N , I-- 2 _ r-+
AL SMT D B _ I1m N 8 J a �a
x
3 I 4 SIDE�N E
Buffer To Remai D5 2415pp .17-22 V1 ��5' �.o
4, ,
I - Y v 24"x24• m EC} 0 4` SI D ALK a ESM
v m�
.Stop Sjg' O
m
48
i E
Street _ I D. 8.19 4 7- 49
II Stop S n Sin (Ri i) Street , ESMT. k a W PP.
HYDRANT Re
- (Ri-i1 -12 g I ed Oak Sign D.B.2415 Pp 217-222 :�,.... :S Red 0o z'�c3 Speed Ljolit
I -
h g ( - )
I pl ,_
.. Y4
nr►. as wi►
I C11 „em,ent. , ..
•
m i n R2 !
7,►"tied- a f ° XV c
M
I �1 � , ry, �, NFL L , � • 'Stal luard .
' HIL T0' THE T(40 v4 ; ROAD B 3.., ,Y zP Stop' sign` QoP
?rEt.
Rlf_i
v ...,
,j ;,_ ...; s .. • :: :•kov � Speed Limit
1
2 Q
i Red 0 , $ Sign (R2-w-i
Y
_g, Z "`
I: o :6' M"f EX , g LU
1 Red Oak
"..-, 487-492 s O REMAIN z I U C
, V5_-� '"8 = HYDRANT,ES ` s r Lt3G. � Q
j D.B.1974pp L 0
20 .SAN. SEWER ESMT. o g � o
D.B. 241 pp 217-222 I e _
4 g ` al REVISED AVEIAAGED
0 x ,
' ! :W m I r C t ream u er Street 8a cc `?
CK
0) a I f ' i Sign 0 4 0
t CU Ov cu `~ O p> > c� � ¢ a m w i I' elkovo,
t' tU N e a'• a e e Q. COMMON � ,- 6
I I w v p M // ai 3 OPEN SPACE ' I M: CHjSELED X.
.J L > 1 1. 44� AC. I" •Zglkowa N CORN CONC •
I J C.> W L Q+, ER
` z v w H n , ' H i ELEV-680
i
I-
�a t
a� 1
EX.810G . H
O pEMA IN
- • O TO BE ADJUSTED - _ -
o m AS NEEDED
Cu
w�
f1 Z O .1 a
1N W3Sy z > (N o J
I I it J ~- _- _ °Ne �Nx� y�l yM zr a- ci
Uj
NOTE: HILL TOP STREET IS TO BE WIDENED TO 22' PRIOR X� cc ' I
TO ANY CONSTRUCTION ON PARKSIDE VILLAGE. STAKEOUT Q M ; ,� j� ro
I SHALL BE PROVIDED BY THE SURVEYOR TO ACCOMMODATE _ Q i l ,
WIDENING, AND SIDEWALK WITHIN EXISTING 4U .R.O.W. o 0)cl
THE COUNTY WILL BE REQUIRED TO OBTAIN A PERMIT FOR a- (1 3 Cn
Cn Z W
ro
THE INSTALLATION AND MAINTANM OF THE WALK. GO X '
4
I
,
,
,
,
1
20' W. L.
EASEMENT
D. B.1974 pp 487-492
PROPOSED
— 3 BOARD FENCE
0.5 Feet SOUTH
OF R.O.W. LINE
MAR. 19,2002
A.C.S.A. COMMENTS)
PHASE I
OCT. 1312003
PHASE 2
As Built Road, Water Q
Sewer
REV: DECEMBER 15,2003
A.C.S.A. Comments Phase 2
REV: JAN.602004
Engineering Comments Phase 2
REV: MARCH 31, 2004
'Street Trees Added
NOTE: ALL LOTS ARE REQUIRED TO HAVE A PRIVATE
PRESSURE REDUCTION VALVE INSTALLED BETWEEN
THE METER AND THE HOUSE PLUMBING.
NOTE: I"SERVICE LINE TO DUAL METERS.
3/4"SERVICE LINE TO SINGLE METERS.
• a
i a 1
g 9 10 11 12 I 13 14 ,N
4 5 BLOCK "A" 6 7 ( I I I TRANSITION—
3 I I I I ( BLOCK "A" j PAVEMENT
I LOTS 3 THRU 8 ROM 22' TO 30'
, D.B. 275 p. 310 (PLAT) i i LOTS 10 THRU 14 ,
i ' O.B, 311 p. 557 (PLAT) ' EX.
EX. R.O.W. 12"T,S.aG.V. F R.O.W.
FH
R.O.W. Proposed Edl e Of Pavement
Ede Of Pavement Existing Edge Of Pavement
nt
22'
Pr sed Pave✓arroble� 40t�
HILL TOP STREET (40' R.O.W.) Widening (Variable Width)
40EX. SS
12"W.LS
- -
_- - ---
22 _---------- Pr °e° ��-e--- -- ----------
- sed E Of Pavement
— _ _�___----------_----_---- ------ -- ----------------------------- --
L '
-71,17
--- -- ROW
R . 0. W. _ - 3.3'GRAYEL l�69L Kl Y EX. I I 35'��rrRAI�EL W<1LK!'i/rJA > o
(E G�TA/L O,t/ SHEE l
(SEE ,DETAIL OA/ SNE T l) 1 ,
BLOCK "B" ,, o
' BLOCK "B" ) LOTS 15 THRU 23 I I NOTE: o
LOTS 1 THRU 11 I I I I
I D.B. 275 I , , , D.B. 311 p. 557 (PLAT)I , i Maintain 10' U
p. 310 (PLAT)
i , i ' separation, or a
II I I ( approval by A.C.S.A.
23 25
I 3 I 1 7 , 9 11 13 15 ; 17 19
,
1 ` ' S
I
MANHOLE TOP
►-'i�_� TO BE ADJUSTED
AS NEEDED
U
N
H
�
w
cv
cv
U
Q
O
O
z
Z
CD
r
ti„J J
Q
O
CC
H
cn
c
>
Q
O
J
LL
_j
-I
w
I
>
C
v
H
(n
w
W
Z
O
�
�
O
J
rr
Q
CT)U
V
tz
to
VJ
O
�
�
w
U)
w
�
Z
Q
Wo
-
in
0
IZ-+
CD
p
z
5
�
Cc
W
J
a:
REVISIONS
DEC. 10, 1999
FEB. 14, 2000
MAR. '13, 2000
April 14, 2000
Rev.Stream Buf'r
& lots 37-37&47
Add Sight Es'mt.
Rev.San.A & B
MAY 3, 2000
(VDOT REVS.)
JAN. 2,2002
AS BUILT
DATE
OCT. 7, 1999
SCALE
I" = 50'
CONTOUR INTERVAL
2 FEET
W a
n H
z
2C
Q
J
W
•-j >
I-•J
>
z
Q
j
W
J
Cr
Y a
Iz m
aC J
a a
FILE NUMBER
7907
SHEET
2114
710
70C
-.j
670
.0
L*Y1j
640
630
VERTAIN TOP 0
WATEROLI
E
ROAD
o
=
g
(u
•o
N
o
HILL
TOP STREET
X
m
' w
coo
m
PHA
E 1
PHA
� E 2
---
+
c
I—
au
Z
+ cl:
,�
u
cu
O
II +�
to
la
0
O
M O
>
Lu
NJ 0O
_
1
it m
co
a, +
_
ei
; a
m :
(n
W w
W
(D
p
II
W
Lj
.I
W
I. 43 %
„
o
Q cD
om
wc
o
II
a-
K
17.1
+'o0c
0 >
N
rn
LC
200.
0
',
co UJ
4
_
o
(uo
w
12
D.I.P. W
TER LINE CL
I
^`
row
i +
M
m a
1
`
`,69
cj
(D
DESIGN PROFILE
:.
H W
°
(� W
>
i�
+
LO
1
AS BUILT PROFILE
fir
_I W (D
-i
'`�.�
-j
cti !tJ
DESIGN PRO
ILE
dr c 5
N co
>
W
00
4 0
✓`'
m _
Lu Pi�-`p
w�c�
��.
AS BUILT
PROFILE
>
w°-
-.
,---
r
7
Q z
1
m-
N
W
a
>
Ground
`r
H
, ao
H
CL w
o
a
RI cxv
ra
ca cn
a
5►
15" RCP
- W
.�
---..,
w
cv a
-'I—
, �,
_
a
1' MIN. SEPp
m
x
m(D
N
E"
J
S2
W +
N
K
31. 9
1
�;
z�
OD
o�
,��
S
'COI
NOTE:
DEPTH OF
XISTING 1
"
±
LC
200.00
>
c
W
T
00 �
W. L.
0 BE FIEL
VERIFIED
v w
ILJ
a'
w
<
in
ui
n
o0
00
1
aJ
utn
mz
Q
ai
ui
-
>
~
m
v
Q
(D lL W
chLG
SO.
GO
.i7
-T SLJ
r,
x
ao
x _
co m
x
O
ao
m
i
p
N
u)
(�.
co
m
0)
O
ro
t�
t�
f�7
rh
V
m
'
N
_
r
I.,
fn
aj
CO
1 rj
N
(D
u')
_(D
! i
(D
(D
(D
th
(D
CO
(D
aJ
(D
ap
(D
co
(o 10
ti
O
(D
(D
c0
(fl
(D
(D
(D
(gyp
(D
r
I
(D
1—
to03
1(0
((D
c~D
c~D
L • V V
J T u u
44-r'uu
0tVV
b+UQ
7+00
MKI
0;
9+00
710
700
� 00]
.:e
370
350
540
530
10+00
REV: DECEMBER 15,2003
A.C.S.A. Comments Phase' 2
RE V: J ANUARY 6, 2004 }
Engineering Comments Phose 2
REV: MARCH 31,2004
Street Trees Added
U
z
cU
O
07
w
CV
CU
H
z
0
� ('°�
Q
H
U
is
� J
0
c
H
p
W
czcn
W
>-
`.�
H
z
W
�
g , o
0
O
rr
<
U
U7
�.J J
O
W
ZD
�
CC
�
W
o
cn
zrr
J
n
n
�0"
D
W
W
n
3
0
(D
o
W
J
a
REVISIONS
DEC. 10, 1999
FEB. 14, 2000
MAR. 13, 2000
April 14, 2000
Add Sight Es'mt.
JAN. 2,2002
AS BUILT
MAR.1912 002, A.C:S A.
Comments PHASE,'1
OCT. 13, 2003 PHASE 2
AS BUILT Road, Water a Sewer
DATE
OCT. 7, 1999.
SCALE
1" = 50' HORZ
1" = 10' VERT
CONTOUR INTERVAL
2 FEET
W
—.J
W
a
H
CD
z
LL
J
H
0
>
Ci
In
H
IL
_
>
>-
0
W
o
Z
o
z
Q
®
I. --I
(n
w
Q
rr
�
W
w
Q
0—
co
Q
0—
FILE NUMBER
7907
SHEET
5 OF 14
710
FO-Lore,
me:
67C
=0
MCI
64C
20'STORM DRAINAGI
D. B. 2415 pp 217 —222
C&O RA ILROA0
34
33
32
m U)
27
31
(D
c
26 28
'30
--
(D
10 CD
0)
01 9--
0 -Jo Y,
45- Bf Fnd-
6
I' Red Be
15 '0
32.2
SE4ER EsMT-
cn D B 2 415 p 217 222
a 1 141)
lc� 1"Red
Oak
ON
A
Red Op SIRE E
fn ro
(4Q
HILL
zl�
Red 01K LO LO
co Zak.Iwo.
I "Red Oak
HYDRANT, EASEMENT 35
D.B.2415
k86 39 36 r, Ira 2
31-7 1
4n
J
I R d ak C\1
-an Red
rn
wo
0
1% Oak
0 a
431• 'F -k 70-00 ted Oak —
52 MOO
1. L
2
:§
r
T)
41 ESMT-
42 'Ib'PRIVATE, SA LATERAL
R d ok
D. B. 2415 pp. 21 222
/"3.88'
>
Red Oak
MT.
IO'-PRIYATr-AN LAT• E MT.
21�.-222 -------
MT
>
!�3 V
5. �9.
0
< C)
Lo
KE3,X'4 Tee
8 GV'
4" GV 11�11
Ai,
R
7+74. 77
to
('Redi'0
Z:
3.91
co
32,
a
I ��O-
TypeA:
9WO
53
2qr A 10
A"\
14 1 S85 2 14 E s,
J*
233- - Go' 4
LA 0
1.OR Ln
ri
(SUNF
+
8x8x6 T e\ -,As EMENT
6" HYDRANT
GV
21
:FH Ass D.
45 46 47
nt Pdght
4
4
43
I
1 20 STORM DRAINAGE SMT.
2415 pp. 217-222
ROAD
B- I
SUNFLO
ER LANE
(40')
NT
M
0
-c 100.00
23.277
61D 16
.63
r—. to
lv�
'1� j
0
CA
to
-I- (D
0
LO c
M r
+
C)11
&J
> W
CL
DESIGN
PIROFIL
ILD
rf)
+
W :-1; —
—i W
FL W
fll
6
>
W
-i
W CL
U) 11-1
4-
U)
W
Existing
7 2-649/o'_.!,
Ground
-�j
4
0
1.4
2 14V
co
AS BUILT
PROFILE
41D.I.P.
Water,
Line CL 53
ai
ri CD
(D
c
U)
IT
C)
c I
c
+
0M
0
QQ •-
0 CL
.
> ,
*
r 0)
Cr ACL
c >
f
,
L
>
J
cu 0
LJ
W
17-
MAINTAIN
3' MIN.
DEPTH
c-
OVER TO
OF WATER
PIPE
NL-)
If,
(U
U C)
co
cp
00 (JI
D
0) c�
C,
(0
(D
(D
(D
710 710
700 700
590 690
580 680
-070 670
560 660
650 1 650
640 640
ROAD
13-2
HILL
TOP STNEET
f--Jl-i. Liu'
J\J. XJU
—U.
cS
00
C
> cri
c
W c.
u 3 r -
+
U I
c)
co
01
Q)
V- c)
C I r
0
(a
-P
a:
0
>
Existing
I H1
DES 14N
PROFILE
Ground
W
C
li J
AS BUILT PROFIL8,
'c)
K)
8"CL5211i.p--
+
W
CL
W-i
L
-4
c
T7
(U
C) C
(b
(1.1
0
C)
c
(n
(D it c)
W
0
C)
C)
00
0
f, 06 (j)
c
c
>
(WO -
d Q)
If)
.
c ) C)
r,
06
CL
0
+
11
4
1
X (D
co
4- CJ
cl
Q) Ir
+
,
>
C
1
X
00 (0 1
LJ
1 >
ti CL
Li I
I I re)
U
to 06
;I 0)
11
(U
LLI
0
j
j
1P 14
L
v
T
>
a-
+
n
Lo
,9
> CO
-
to
LTj co I
,-
0
LC IOO,D0
C L
Aj
>
. r, f,-
0) (0
U)
<
r,z
(:I
K 21.2
9
M
+ 0+
CO
00
VSD 36949
L 50. 0 0'
C:)
0
Ia
K 2 9:76
>
VSD 91Z57
-j CO
0.1
W
Co.
OD
MAINTAIN 3'
MIN. DEPTH
OVER TOP OF
WATER LINE
D
0
00
D
W
4- I
1)
W T)
ff) f
c;
M
0
C
U-) c
(Z) (1)
(T)
(D —
co
(0
D
(D
(D D
(D
(0 W
(D D
(0 (P
710
W,
1110
.10
570
660
M-1
MIR
REVISED: MARCH 31,2004
Street Trees Added
,Q,
a
U
cli
(D
M
N
cu
U
0
C:)
<
CD
U J
0
rT-
0
LIJ
_j
_j
ca
0
cn
Li
0
0
I
(T
<
<
CD
J—
e
U J
c-
>
If
O-V—%
U
rT
:D
CU
iE
LL-i
<
U)
C3
CC
LJ
U!
0-
n
0
71
CD
0
z
cc
77
Ljj
<
I
a
REVISIONS
DEC. 10, 1999
FEB. 14, 2000
MAR. 13, 2000
April N, 2000
Add Sight Es'mt.
OCT, 1312003 PHASE 2
As Built Road^ter S Sewer
DEC. 15, 2003 Phase 2
A.C.S.A. Comments
JAN.6,2004 Phase 2
Engineering Comments
c\j
W
V)
W
Cu
CL
-j
Go
LL-
Lij
CD
0
_j
(D a
cr
z
c)—
<
>
>:
C13
m
Li
D 0
Z
C)
i.—i
0
LLJ
I
Cf)
rr
LU
z
cr
<
LU
CO
<
U)
0
FILE NUMBER
7907
SHEET
6 OF 14
0+00
1+00
2+00
3+00
4+00
0+00
1+00
2+00
3+00
4+00
NOTE 680 680 z N
N LID O
Maintain 1' minimum separatio
bet en Water Lie and 15"RC NOTE: N `i H (p)
680 680 690 ' co = N ° cU
Maintai 1' minimum separation 690 J � 680 X -�CU
between Storm Lane -and Water m o _^_ 680 w
o e, �-+ � N (D ,� and Sew r Lines 3 I N �' () <
� 1 11 Z) II m _v cu X I ci
U J �, J > n _> ., > oo� 670 m 670 W II H II Z
W V 11
Q) j H O 0. ("� H
670 �, m m 670 680 clv `t I u am° n 680 I 670 cn o O CE
U) H , H W 670
w O O CL a 0 0 0 cn rr
U; ° Existin --- UJ
o �" m 11 it ~ h- 3 0 660 66q Ground "� J J
J
> I I a o •+ H H
w o E°- F- o Ground r T� v t
LU
660 660 670 _--- _ 670 ELEV= 56.5 660 c 0 660 �C.! z
W Existing m O p
W. L. W Ground 1�CD W OJC
1 650
o rn uw , n Q o� c�
650 650 660 �. i „i `n= 660 co T650 F-+ o ►-� a
I 650
is L0 L0 o f 18 +ep- po c� 3 cD� cD a II H
11 n .0 @ 4.666% HOPE O = (D U) n 11 ° n o 5.50 HOPE
u u 19 2.72° J Z 640 ( 640 ' of 15" PGP- °' cn
O (D3 II n a H p H ' o rr
O o ~' (n 35.8733 of 15" REP 33.0� HDPE @ 8 9 r (. 9 /o p
640 ►-� �+ H 640 650 11 n u v o ri o, 9 ~ H PE 650 % 32-66' @ f 15" flC-f�- W
t o 'of 15" 2 76% ro 640 0'9) /O 640 MM�
33.74' HOPE 34'of 15" o �' S.99� tOE 2.17�%7
Imo! W
� � o
z
32'a 15" ReP @ 8;?�of 15" °27.6 HOPE
@ ~' 2 20 HD E @q ' of i5" REP- 630 a COco 630 Q z "
2.34 % @ oa-864%-I. 9 % 3.9 4 °/ 0. C_ ® W rn
F-; (D � z (rn
Z
0
0+00 1+00 2+00 0+00 1+00 2+00 3+00 0+00 1+00
�-+
-1+00 0+00 71
1+00 2+00
rr
z a
W J a
X � '� X 11
X c1 N NOTE: REVISIONS
_' o Maintain aintin 1' minimum separation DEC. 10, 1999
c� ao U LD co 680 690 690 680 between Water Line and 36" RC
680 FEB. 14, 2000
o n I u H 11 MAR. i3, 2000
X I O f] V
U
CoQO O cJ.
N '� , �,� o o � 0 x -, M J JAN. 2,2002
W LO O c0 Existing ~ — h
cD o AS BUILT PHASE
670 �-+ Ground --- 670 680 CD 0 cD OCT.13,2003 PHASE-2
u 680 670 670 AS BUILT Rood,WateraSewe
W
W a r2 1'2 xc II 0 DEC. 15, 2003 Phase
o p 4 o Y1
0 0 A.M.A. Comments
E fisting I- JAN. 6120 04 Engineerini
round .Comments Phone 2
660 OD 660 670 - . 670 660 ti ;7w-,L 660
o ,QD_ _
B P 288.2� HDPE N cv (DD g
a ,
- """" Existin '-'
"°ram f 15" ;IG ca Ground
ELEV.= 656.5 � @ � X if 11v DATE
ro 1 42% If
A
650 ,�,. o �; 0 650 660 M 660 650 650 OCT. 7, 1999
UP 1 cD �-+ _
ui
(D II II II H ►-a F- i H 1 H-1 28�48-' o f 15 " HRH N m cp (a
c�D n 35.67' @ X NN I L0 co v
I ; o ►-' C cv 3§ . 39 ' f 15 " HOPE
1.4 (D c° I 1 W _
SCALE
``I II 1 " 50 ' HORZ
H '-' '� co 0 @ • u u 11 I 1" = 10 ' VERT
o 1 U)
640HOPE 68, 48' PE 92 /O 640 650 0 650 640 640
4 4 -g o f 15 " REP- fib. 81 ' 0 15" RCP- N cn ci W
G. 2 1.OBB% @ `° 106.12' H.DRE. CONTOUR INTERVAL
3. 92 % 1. 00 % HOPE 406-. 8f? of 36 " -REP-
of 15" ReP @
52. @ F9 1.34 % 2 FEET
0'
13.11%
0+00 1+00 2+00 3+00 4+00 5+00 0+00 1+00 -1+00 0+00 1+00 2+00 3+00
PIPE OUTLET CONDITIONS
A A
Ii0
CD
ado ------ J H
d z
o
z H
PIPE OUTLET TO FLAT I H I°—i >
AREA WITH NO DEFINED
W
PLAN VIEW CHANNEL J r
e-+ z
z
o
La
® Cl- H
D % r
_RM
d cn W
W
p
�J a
r— J. L �C
SECTION A -A FILTER CLOTH KEY IN 6"-9"; RECOMMENDED FOR J�r
ENTIRE PERIMETER NO. 1 78
A
A 3da (MIN.)',
G.
d
PIPE OUTLET' TO WELL
DEFINED CHANNEL
PLAN VIEW
L a IS CLASS ill bWLESS OThEWESEme ."_o..._..._
FILE NUMBER
d OUTLET / INLET PROTECTION NOTE:
7907
SECTION A -A — i- OUTLET PROTECTION A T UO, VO, WO,
FILTER CLOTH KEY IN 6PRECOMMENOEQ FOR ENTIRE PERIMETER X0, YD AND ZO AND INLET PROTECTION
.,`T. NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, OABION
BASKET, OR CONCRETE.
2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3.18-4. A T Y1 WILL BE DETAILED ON THE EROSION ®'
� —.
3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT
LESS THAN 6 INCHES. CONTROLIBMP PLAN. SHEET
Source: Va. DSWC Plate 3.18-1
9 OF 14