COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5823 Fax (434) 972-4126
January 10, 2006
Alton L. Carver, Architect
C.W. Hurt Contractors, LLC
195 Riverbend Drive, P.O. Box 8146
Charlottesville, VA 22906
RE: SP 2005-00022 Berean Baptist Church (Sign #72) - Tax Map 76 Parcel 51 B
Dear Mr. Carver:
On December 7, 2005, the Albemarle County Board of Supervisors took action on SP 2005-022
to allow for expansion of an existing church in accordance with Section 13.2.2.10 of the Zoning
Ordinance on Tax Map 76 Parcel 51 B in the Samuel Miller Magisterial District. This special use
permit was approved based on the following conditions:
1. The improvements and the scale and location of the improvements shall be developed in
general accord with the plan dated August 22, 2005;
2. The floor area of the proposed addition will be no larger than fifty-one hundred (5,100)
square feet;
3. The construction of the church expansion, as shown on the plan dated August 22, 2005
and titled Berean Baptist Church, shall commence within five (5) years of the approval of
this special use permit or this special use permit shall expire;
4. There shall be no daycare center or private school provided on site without approval of a
separate special use permit; and
5. Connection to public sewer or installation of septic system as approved by the Health
Department prior to issuance of building permit.
Please be advised that although the Albemarle County Board of Supervisors took action
on the project noted above, no uses on the property as approved above may lawfully
begin until all applicable approvals have been received and conditions have been met.
This includes:
Carver
Page 2 of 2
January 6, 2006
compliance with conditions of the SPECIAL USE PERMIT;
approval of and compliance with a SITE PLAN amendment; and
approval of a ZONING COMPLIANCE CLEARANCE.
In the event that the use, structure or activity for which this special use permit is issued is not
commenced within sixty (60) months from the date of Board approval, it shall be deemed
abandoned and the permit terminated. The term "commenced" means "construction of any
structure necessary to the use of the permit."
If you have questions or comments regarding the above -noted action, please do not hesitate to
contact Gerald Gatobu or Louise Wyatt at 296-5832.
Sincerely,
V. Wayne Cilimberg
Director of Planning