Loading...
HomeMy WebLinkAboutZMA201900004 Correspondence 2020-08-03 (2)ipROUDABUSH, GALE & ASSOC. , Inc. A PROFESSIONAL CORPORATION Serving Virginia Since i956 July 31, 2020 Ms. Megan Nedostup, Principal Planner Community Development 401 McIntire Road North Wing Charlottesville, VA 22902 RE: ZMA2019-4 Breezy Hill Dear Ms. Nedostup, We are requesting placement on the next available agenda of the Board of Supervisors. In order to get ready for the BOS meeting, we request clarification on the next staff report: • Concept Plan Proffer b) has been updated to indicate that the connection at Running Deer Drive can be either full access or emergency access at the discretion of VDOT. The timing of the proffer has remained the same. • Concept Plan Proffer c) has been added to indicate that construction traffic shall be prohibited from using the Running Deer Drive entrance. • Concept Plan Proffer i) has been updated to include the maximum number of units. • We would like to request that the reference to the water quality requirements be removed from the staff report rather than struck through. I would also like to formally withdraw the three modification requests for the street standards (the curb/gutter, sidewalks, and planting strip along streets). We will be providing curb/gutter, sidewalks and planting strips along all of the streets in the development. I have also made several changes to the plan to address the staff concerns listed in the Staff Report. • I have updated the mid -block trails to be a io' asphalt multi -use trail. The remaining trails through the open area will be primitive trails. A description of each trail type is located on the Cover Sheet (left hand side of the page). (Sheets 3,4 and 5) • On the Cover Sheet, the typical section of roadway has been updated to be curb and gutter streets with a sidewalk and planting strip. • On the Cover Sheet, the typical section of the emergency access road will be a rural road section with a shoulder/ditch cross-section. A note has been added to the typical section to state that if VDOT indicates that the roadway connection to Running Deer Drive should be a full access connection, the roadway cross- section will be curb and gutter. 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com 434-977-0205 ZMA 2019-4 Breezy Hill 7/31/2020 The following notes have been added to the Cover Sheet (left hand side of the page): • Lots shall not encroach into the stream buffer or preserved slope areas. • Secondary vehicular access point at Running Deer Drive is to be installed prior to the issuance of the 31st building permit. The vehicular access at Running Deer Drive shall emergency access only unless a full vehicular connection is required by VDOT. • Two layers of erosion and sediment control measures shall be provided where development abuts stream buffers. • No grading and erosion control measures shall encroach into the stream buffer except for the construction and/or improvement of stormwater conveyance channels that may be required to comply with water quality requirements. • All construction traffic shall enter/exit the site through the main entrance on Route 25o and will not be permitted to use the entrance at Running Deer Drive. The sidewalks and planting strips have been added to Sheet 4. I have also provided a cross-section in the area of the stormwater management pond along Route 250 to demonstrate how the enhanced extended detention pond works with the io' multi -use path, landscaping and preserved steep slopes. The cross-section is located on Sheet 4. Sincerely, f}12t12ty Cjeorge 999 Second Street SE. Charlottesville. VA zzgoz. www.Roudabush.com Page 2 of 2