HomeMy WebLinkAboutSP200400036 Legacy Document 2006-01-12 (8)Original Proffer
Amended Proffer
(Amendment # )
PROFFER FORM
Date:
ZMA # 04-011
Tax Map and Parcel Number(s) TMP 78-413 and TMP 78-4A1
2.142 Acres to be rezoned from C-1 to HC
Pursuant to Section 33.3 of the Albemarle County Zoning Ordinance, the owner, or its duly
authorized agent, hereby voluntarily proffers the conditions listed below which shall be applied
to the property, if rezoned. These conditions are proffered as a part of the requested rezoning
and it is agreed that: (1) the rezoning itself gives rise to the need for the conditions; and (2) such
conditions have a reasonable relation to the rezoning request.
1. The development on TMP 78-413 and TMP 78-4A1 shall be in general accord with the plan
produced by Terra Partners, LLC, dated October 19, 2004, last revised May 9, 2005, entitled
"Williams Property", herein referred to as the plan. The limits of disturbance shown on the
approved final site plan shall not be significantly different from the limits shown on the
Application Plan.
2. Permitted uses of the property, and/or uses authorized by special use permit, shall include
only those uses allowed in the C-1 District (Section 22 of the Albemarle County Zoning
Ordinance in effect on March 15, 2005, a copy of the section being attached hereto). An
additional permitted use of the property shall include machinery and equipment sales,
service, and rental as allowed for in the HC District.
3. The character of the development shall be based on the form, massing, character, and
detailing that draws upon and is compatible with the proposed building elevations produced
by C.W. Hurt Contractors, LLC, dated December 28, 2004, entitled "C'ville Power
Equipment", hereto attached. Conformity with the proposed building elevations will be
reviewed and approved by the Director of Planning in consultation with the County's Design
Planner. If any conflicts arise between the Director of Planning's interpretation and the
County's Architectural Review Board requirements, then the Architectural Review Board's
requirements shall take precedence.
Signatures of All Owners Printed Names of All Owners Date
Signatures of All Owners Printed Names of All Owners Date