HomeMy WebLinkAboutSDP202000054 Review Comments Final Site Plan and Comps. 2020-08-05� AI
?"h
�IRGRTF
County of Albemarle
Department of Community Development
Memorandum
To: Chris Perez
From: Emily Cox
Date: 04 Aug 2020
Subject: Sleep Number Charlottesville — Final Site Plan (SDP202000054)
The final site plan for Sleep Number Charlottesville has been reviewed by Engineering. The following
comments will need to be addressed before approval:
1. WPO must be submitted and approved before final site plan approval.
2. VDOT approval will be necessary.
3. Please double check topography. It does not appear to match county GIS.
4. Work is shown offsite/outside of property lines. Permission or temporary easement will be
necessary for this work.
5. Retaining walls above 4 ft will require stamped, engineered plans with their building permit.
6. Please show SWM facility and drainage easements. These will need to be recorded with deeds
before final site plan approval. Please note that no trees shall be in these easements.
7. Please show all site features on the landscaping plan. For example, Basin B is not shown. It
appears there may be trees in the basin.
8. Please show sight distance lines at the entrance.