HomeMy WebLinkAboutSDP201900079 Correspondence 2020-08-11 (2)ALBEMARLE
COUNTY I VIRGINIA
Is this a new submission or a re -submission?
r New Submission t= Re -submission
The Community Development Department (CDD) now accepts the digital submission of development applications
through anew web -based form.This feature is being implemented in an effort to provide a user-friendly method to submit
and resubmit multiple development applications. Please click the New Submission button above to seethe list of
available applications.
To guide you through the digital submission process, we have provided Submittal Instructions on howto use this
Submission Form and some General Submission Guidelines. Please review both of these documents before making your
submission.
Submittal Instructions
General Submission Guidelines
If you have questions about the correct submission method for your project, please email us at
oddsubrrittal@albemarle.org or call us at (434) 296-5832.
You have selected re -submission. If necessary, you will need to complete the appropriate PDF application form(s).
o For Road Plan re -submissions, an application and fee are required and can be found here.
• For Water Protection Ordinance re -submissions, an application and fee are required and can be found here.
o For Special Use Permit re -submissions, an application can be found here. A Fee will apply for all submittals after the
first free re -submittal.
• For Zoning Map Amendment re -submissions, an application can be found here. A Fee will apply for all submittals after
the first free re -submittal.
o For all other applications (SDP, SUB, CLE, etc.) there is no application or fee required to submit.
Once you have finished filling out any required application, save it to a location on your computer.
Please enter your project's application number in the field provided below, once completed, tab to the neM field. The
application number you entered will reference the project's application number in Albemarle County Community
Development Department's development tracking system. Once referenced, the Project Name and Project Type fields will
be auto -populated. Please confirm the information referenced in these fields is correct. After confirmation, please enter
your name and email address for contact purposes and attach any associated files for resubmittal through the File
Upload button.
Submission Fees are determined by application type and are listed within each application.
Full Name*
Ex : John [be
Riki van-Mekerk
Email *
Bc: johndoeagneil.ccm
Riki@roudabush.00m
Phone Number*
B(: 434973-9999
806-283-1802
Application Number*
Bc SOMD1800005
sdp201900079
(Refs(+4 dig[ yea+5 digit nunher
Is this an LOR7*
r Yes
Project Name
(%-try )
Belvedere Phase 3 (Part 1) - Initial
Project Type
(%-try )
SDP
File Upload
Only FLF and ITFfiletypes accepted
fJ No
Application—SDPBelvedere Phase 3 Block 10A_Initial Site Plan.pdf 419.96KB
Comment response letter_ Belvedere Phase 3 Block 10A_ISP.pdf 448.13KB
Transmittal —Belvedere Phase 3 Block 10A_ISP.pdf 293.08KB
Belvedere Phase 3 Block 10A_ISP_Sheet 1-10.pdf 17.77MB
M3xinums¢e per file: 70M3