Loading...
HomeMy WebLinkAboutARB202000076 Correspondence 2020-08-10R C H I T E C T S r � To Albemarle ARB Date 8.10.20 Project Flow Automotive - Porsche, Audi, VW and Mazda Subject Comments response - ARB-2020-76 (TMP - 07800-00-00-00700) memo The Flow team sincerely appreciates all of the Boards comments through this process thus far. This document will act as the main textual response to the most recent comments. Please refer to Architectural booklet and Site Plan submissions and noted recent revisions for illustrative response to ARB comments. The following are responses to County comments listed on ARB-2020-76 document (dtd 8.04.20): 1. Framework above Porsche Entrance -please note in new submission package that Building elevations have been revised so they now match the renderings. 2. Mazda interior walls -Note the Mazda 'Jewel box" interior east has been revised from white to a less visible black color so as not to be as visible from E.C. The South wall still remains the wood texture. 3. HVAC Screening - Please see the new rendering added to Architectural package; showing a perspective of the site from further east on Richmond Road. On this illustration as well as in the building Sections included, you'll note the architecture was designed with roof step down at the rear of the showrooms; providing a location to hide the mechanical equipment from the EC viewshed. 4. Light Dole height - new pole heights are revised to 15' height. 5. Revise Planting to show consistent row of shrubs along ECand the western Decimeter - see Civil updated Planting Plan. 6. Show how Landscaping and utilities are being coordinated - Note on Site Plan trees were shifted - one was under a utility line and another tree that was within an ACSA easement. Utilities and easements are shown on the landscaping plan. 7. Comprehensive Plan will be submitted. From Flow design team