Loading...
HomeMy WebLinkAboutSDP202000054 Review Comments Final Site Plan and Comps. 2020-08-13COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Memorandum To: Scott Collins From: Christopher Perez Division: Community Development — Planning Date: August 13, 2020 Subject: SDP202000054 Sleep Number Charlottesville - Final Site Plan The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Zoning Ordinances unless otherwise specified.] 118-32.5.21 Requirements ofan initial site plan. a. Ensure the final site plan submittal also meets all requirements for final site plans (18-32.6). Rev 1. Comment addressed. b. For the Zoning overlay districts, only reference to `managed steep slopes' is needed — there are no preserved or critical slopes. Rev 1. Comment addressed. c. Remove reference to `open space' on sheet 1. There is no open space required with this development. Recommend label as `undeveloped area' or similar. Rev 1. Comment addressed. d. Include the zoning districts and uses of adjacent parcels. Rev 1. Comment addressed. e. Include and label the DB/PG of any existing easements. Rev 1. Comment addressed. 2. 118-4.11.41 Easements and structures. Per comments from reviewers on required easements (including ACSA and Engineering), ensure there is sufficient space for easements around required utilities that do not conflict with structures/buildings. Rev 1. Comment addressed. 3. 118-4.12.13 and 4.12.181 Loading spaces. Provide one (1) loading space per 18-4.12.13 meeting the design standards of 18- 4.12.18: Loading spaces shall be provided in addition to and exclusive of any parking requirement on the basis of: (1) one space for the first 8,000 square feet of retail gross leasable area. Rev 1. Comment addressed. 4. 118-4.171 Lighting plan. Provide a lighting plan meeting the requirements of 18-4.17 with the final site plan submittal. Rev 1. Comment addressed. 5. 118-32.7.91 Landscapingplan. A landscaping plan is required with the final site plan. The following are preliminary comments: a. 18-32.7.9.4: Show the requirements of the contents of a landscape plan, including existing landscaping/natural features and proposed landscaping. Rev 1. Comment not addressed. Please provide information about the existing landscaping onsite. b. 18-32.7.9.5: Ensure street trees meet all of the relevant requirements, including minimum caliper and spacing. Rev 1. Comment addressed. a 18-32.7.9.6: 5 percent of the parking area will need to be landscaped. Ensure that parking spaces with the 2-foot overhang do not result in damage to landscaping. One large shade tree per 10 parking spaces is required. Rev 1. Comment addressed. d. 18-32.7.9.7 Ensure all required screening meets the requirements of this section and of the ZMA application plan. Rev 1. Comment addressed. e. 18-32.7.9.8 Ensure that there is at least 10 percent tree canopy for the site and that trees are 5+ feet after 10 years. Rev 1. Comment addressed. f 18-32.7.9 Ensure all plantings are on the County's approved list. Rev 1. Comment addressed. 6. IZMA2019000141 Application Plan: The following are comments regarding the application plan: a. Label the area for future Phase II on the site plan. Rev 1. Remove any reference to the 20,800 SF future phase lI dev area. Instead only reference that area as "Phase II area". b. Include the full building height note from the application plan, including the additional setback requirements for buildings over 35 feet in height. Rev 1. Comment addressed. c. The front setback must be revised as currently shown on the plan. The ZMA application plan requires a 30' maximum setback from Route 29, which appears to be the Route 29 ROW. The proposal appears to be setback from the multiuse path by 30', but more than 30' from the ROW. Rev 1. Comment addressed. 7. Additional applications: The following applications and approvals are required prior to final site plan approval: a. 18-32.7.4.2 and 18-32.7.5.3: Easement Plats: All new and adjusted easements must be shown on an easement plat, which must be approved prior to final site plan approval, and must match the final site plan. Rev 1. Comment not addressed. The platting of offsite grading easements over TMP 61-134 shall be required prior to final site plan approval. Prior to final site plan approval the items required on plats shall be approved and recorded in the Clerk's Office. Provide recordation information on the site plan for these actions. i. Offsite construction easements will be needed for the improvements/work shown on adjacent TMP 61-134. Rev 1. Comment not addressed. The Platting of an offsite access easement over TMP 61-134 shall be required prior to final site Plan approval. The Platting of landscape easements over TMP 61-134 shall be required Prior to final site Plan approval. Prior to final site plan approval the items required on Plats shall be approved and recorded in the Clerk's Office. Provide recordation information on the site Plan for these actions. ii. Offsite ACSA easements will be needed. Offsite easements must be approved prior to final site plan approval. Rev 1. Comment not addressed. The platting of offsite water and sewer easements over TMP 61-134 shall be required prior to final site plan approval. Prior to final site plan approval the items required on plats shall be approved and recorded in the Clerk's Office. Provide recordation information on the site plan for these actions. b. 18-32.7.4.1: Approval of a VSMP Plan is required prior to final site plan approval. See Engineering comments. Rev 1. Comment not addressed. c. 18-30.6: A certificate of appropriateness (COA) from the ARB is required prior to final site plan approval. Rev 1. Comment not addressed. Additional Comments on the Final Site Plan 8. [32.7.2.3] Continue the proposed sidewalk through the front setback to connect with the sidewalk on the west side of the building. 9. [32.7.1, 32.5.1(c)] A right-of-way dedication plat is required. Prior to final site plan approval the items required on plats shall be approved and recorded in the Clerk's Office. Provide recordation information on the site plan for these actions. 10. [32.5.1(c)] As depicted the residue parcel will require an approved subdivision application prior to final site plan approval. Meeting the required frontage for the proposed parcel will be a major issue to overcome with the proposed division. Prior to final site plan approval the items required on plats shall be approved and recorded in the Clerk's Office. Provide recordation information on the site plan for these actions. 11. [Comment] On the cover please reference SDP2020-54 in the title. 12. IZMA2019-141 The 14' shared use path must be provided per the ZMA. 13. 132.5.2(p), 32.7.2.11 The proposed entrances shall be designed and constructed as required by the standards of the Virginia Department of Transportation. VDOT approval of the proposed entrances to the site shall be required prior to final site plan approval. 14. 132.4.3.6, 32.4.3.21 The site plan shall not be approved until all SRC reviewers have approved the plan. Their comments are referenced below and attached. Other Reviewers Albemarle County Building Inspections Michael Dellinger, mdellinger&albemarle.org 1. No objection. Albemarle County Department of Fire Rescue Shawn Maddox, smaddox@albemarle.org 1. A knox box is required. Please add a note indicating this requirement and that the location can be coordinated with the fire marshal's office. 2. Please provide the ISO needed fire flow for the structure Albemarle County Engineering Services (Engineer) Emily Cox, ecox2&albemarle.org — review comments attached. Albemarle County Information Services (E911) Brian Becker, Bbecker@albemarle.org 1. No objection. Architectural Review Board (ARB) Margaret Maliszewski, MMaliszewski@albemarle.org — review comments attached. Albemarle County Service Authority (ACSA) Richard Nelson, melson@serviceauthority.org 1. The plan is currently under review. Virginia Department of Transportation (VDOT) Adam Moore, adam.moore@vdot.vir ig nia. gov — review comments attached. Please contact Christopher Perez in the Planning Division by using cperezkalbemarle.org or 434-296-5832 ext. 3443 for further information. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street (804) 7862701 Commissioner Richmond, Virginia 23219 Fax: (804) 786.2940 July 29, 2020 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Chris Perez Re: Sleep Number — Final Site Plan SUB-2020-00054 Review # 1 Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 10 July 2020 and offer the following comments: 1. Proposed entrance does not meet the minimum spacing distance required. Please see VDOT's Road Design Manual appendix F., pg., F-23, minimum spacing distance standards for commercial entrances and intersections and median crossovers. As proposed an AM-E will be required. 2. Right of Way Dedication will need to be conveyed and deeded to the commonwealth of Virginia prior to final site plan approval. 3. The concrete path shown does not meet VDOT standards for a shared use path, nor does it connect to a VDOT shared use path on either end. VDOT will only maintain pedestrian facilities that meet our design standards. We recommend installation of a standard 5 ft. wide sidewalk here. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Willis Bedsaul at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING � AI ?-n �/RC;IN�P County of Albemarle Department of Community Development Memorandum To: Chris Perez From: Emily Cox Date: 04 Aug 2020 Subject: Sleep Number Charlottesville — Final Site Plan (SDP202000054) The final site plan for Sleep Number Charlottesville has been reviewed by Engineering. The following comments will need to be addressed before approval: I. WPO must be submitted and approved before final site plan approval. 2. VDOT approval will be necessary. 3. Please double check topography. It does not appear to match county GIS. 4. Work is shown offsite/outside of property lines. Permission or temporary easement will be necessary for this work. 5. Retaining walls above 4 ft will require stamped, engineered plans with their building permit. 6. Please show SWM facility and drainage easements. These will need to be recorded with deeds before final site plan approval. Please note that no trees shall be in these easements. 7. Please show all site features on the landscaping plan. For example, Basin B is not shown. It appears there may be trees in the basin. 8. Please show sight distance lines at the entrance. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 Phone (434) 296-5832 Fax (434) 972-4126 August 4, 2020 Scott Collins Collins Engineering 200 Garrett Street, Ste K Charlottesville, VA 22902 RE: ARB-2020-69: Sleep Number Final (TMP: 06100-00-00-134A0) Dear Mr. Collins, The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, August 3, 2020. The Board unanimously approved the request, pending staff administrative approval of the following conditions: 1. Provide window glass information. 2. Provide physical samples of proposed building materials. 3. Clarify the proposed color for the metal wall panels. 4. Revise the plans to show the locations of all mechanical equipment. Show how visibility of the equipment will be eliminated from the EC. 5. Revise the photometric plan to provide illumination values using the point -by -point method and indicate the maximum fc value. 6. Revise the lighting plan to indicate the color temperature of the pole light. The color temperature must be 3000K or less. 7. Revise note 4 under the Luminaire Schedule to indicate that light fixtures will have lamps emitting warm white light. 8. Coordinate note 5 under the Luminaire Schedule with the color identified in the cut sheet for the wall fixtures. Ensure a consistent color for all fixtures. 9. Without reducing the overall quantity of plants, limit the number of proposed plants for any one species to 25% of the total proposed for that plant type (tree, shrub). 10. Revise the landscape plan to show new trees throughout the area of tree removal on the adjacent parcel to the south. 11. Include a note on the plan stating that the new end of the retaining wall on the bank parcel will be given a clean finish with materials matching the existing wall materials. 12. Indicate on the site plan the proposed retaining wall color. A sample may be required for review. 13. Show a "tree line to remain" and tree protection fencing on the adjacent parcel to the south. 14. Reduce the blue outline on the sign letters for a more streamlined appearance. A separate sign application is required. Please provide: 1. One set of revised drawings addressing each of these conditions. Include updated revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached 'Revised Application Submittal' form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, -!/\�� Margaret Maliszewski Chief of Planning/Resource Management 434-296-5832 x3276 mmaliszewski@albemarle.org cc: Albemarle Bank & Trust Co. C/O BB&T Property Tax P.O. Box 167 Winston-Salem, NC 27102-0167 File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information, please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: PROJECT NAME: DATE: Submittal Type Requiring Revisions () indicates Submittal Code County Project Number # Copies Erosion & Sediment Control Plan E&S Mitigation Plan MP Waiver Request WR Stormwater Management Plan SWMP Road Plan RP Private Road Request, with private/public comparison PRR Private Road Request — Development Area PRR-DA Preliminary Site Plan PSP Final Site Plan or amendment FSP Final Plat FP Preliminary Plat PP Easement Plat EP Boundary Adjustment Plat BAP Rezoning Plan (REZ) Special Use Permit Concept Plan SP-CP Reduced Concept Plan (R-CP) Proffers P Bond Estimate Request (BER) Draft Groundwater Management Plan D-GWMP Final Groundwater Management Plan F-GWMP Aquifer Testing Work Plan ATWP Groundwater Assessment Report GWAR Architectural Review Board ARB Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 1 Margaret Maliszewski Christopher Perez From: Richard Nelson <rnelson@serviceauthority.org> Sent: Wednesday, July 29, 2020 2:13 PM To: Christopher Perez Subject: RE: SDP202000054 Sleep Number Charlottesville - Final site Plan CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Chris, SDP202000054 Sleep Number Charlottesville is currently under review Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 From: Christopher Perez <cperez@albemarle.org> Sent: Friday, July 17, 2020 4:23 PM To: Khristopher Taggart <ktaggart@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Frank Pohl <fpohl@albemarle.org>; John Anderson <janderson2@albemarle.org>; David James <djames2@albemarle.org>; Emily Cox <ecox2@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; Adam Moore <Adam.Moore@vdot.virginia.gov>; Brian Becker <bbecker@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; Shawn Maddox <smaddox@a I bema rle.org> Subject: SDP202000054 Sleep Number Charlottesville - Final site Plan All, SDP202000054 Sleep Number Charlottesville - Final site Plan We just received a digital submittal of the above ref plan. Please provide comments to me by August Th. Here is a LINK to CV. Christopher Perez I Senior Planner Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3443