Loading...
HomeMy WebLinkAboutSUB202000064 Review Comments Final Plat 2020-08-17 (2)� AI ?"h �IRGRTF County of Albemarle Department of Community Development Memorandum To: Tori Kanellopoulos From: Emily Cox Date: 05 June 2020 Rev. 1: 26 June 2020 Rev. 2: 05 Aug 2020 Subject: Spring Hill Village — Final Subdivision Plat (SUB202000064) The final subdivision plat for Spring Hill Village has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. SUB201900158 must be approved and either built or bonded before this plat can be approved. Rev. 1: Comment not addressed. Rev. 2: Comment not addressed. 2. Please designate public vs. private storm easements. Easement needs to be public if it collects any water from public right-of-way or if is part of the SWM facility. Rev. 1: All easements have been labeled as private. This is not correct. Please coordinate with the engineer. The SWM facility easement must be public as well as any drainage easements collecting water from the public right-of-way. The WPO Plan appears to show them correctly. Rev. 2: Comment addressed. 3. Please label SWM facility easement around all SWM facilities. The plat says there is a hatching, but it is not evident. Rev. 1: Comment addressed hatching is evident. 4. Two deeds are necessary: SWM facility easement deed and public drainage easement deed. They must be approved by the county attorney. Please provide them in word document form (with tracking changes on), or if requested, the county can draft the deeds. The templates are provided (attached to this comment letter). Please let us know how you would like to proceed. Rev. 1: Comment not addressed. The county will be drafting these deeds and will send you the 2 copies to sign once they are ready. Please note they cannot be completed yet since the names of easements are not correct (public ,private, etc). Rev. 2: Draft deeds have been sent to county attorney for review with the latest plat. 5. Based on ZMA20200006(not currently approved), there appears to be a need for a sidewalk/travelway easement along Route 20. As currently shown, the pedestrian path is not completely in the right-of-way. Rev. 1: Comment not addressed. The current ZMA shows an 8ft asphalt pedestrian pathway that will need to be in an easement with a maintenance agreement unless it is in the right-of-way. Rev. 2: Comment addressed. 6. If any retaining walls cross property lines, they must be in an easement and have a maintenance agreement. Rev. 1: Retaining wall easements are shown. Rev. 2: Retaining wall maintenance agreement must be executed. 7. Rev. 1: Please use the attached maintenance agreement template for the retaining walls that are within easements. Rev. 2: will be addressed with comment 6.