Loading...
HomeMy WebLinkAboutSDP201800003 Correspondence 2020-08-18ALBEMARLE COUNTY I VIRGINIA Is this a new submission or a re -submission? r New Submission t= Re -submission The Community Development Department (COD) now accepts the digital submission of development applications through anew web -based form. This feature is being implemented in an effort to provide a user-friendly method to submit and resubmit multiple development applications. Please click the New Submission button above to seethe list of available applications. To guide you through the digital submission process, we have provided Submittal Instructions on howto use this Submission Form and some General Submission Guidelines. Please review both of these documents before making your submission. Submittal Instructions General Submission Guidelines If you have questions about the correct submission method for your project, please email us at cddsubmittal@albemarle.org or call us at (434) 296-5832. You have selected re -submission. If necessary, you Will need to complete the appropriate PDF application form(s). o For Road Plan re -submissions, an application and fee are required and can be found here. • For Water Protection Ordinance re -submissions, an application and fee are required and can be found here. o For Special Use Permit re -submissions, an application can be found here. A Fee will apply for all submittals after the first free re -submittal. • For Zoning Map Amendment re -submissions, an application can be found here. A Fee will apply for all submittals after the first free re -submittal. o For all other applications (SDP, SUB, CLE, etc.) there is no application or fee required to submit. Once you have finished filling out any required application, save it to a location on your computer. Please enter your project's application number in the field provided below, once completed, tab to the neM field. The application number you entered will reference the project's application number in Albemarle County Community Development Department's development tracking system. Once referenced, the Project Name and Project Type fields Will be auto -populated. Please confirm the information referenced in these fields is correct. After confirmation, please enter your name and email address for contact purposes and attach any associated files for resubmittal through the File Upload button. Submission Fees are determined by application type and are listed within each application. Full Name* Ex : John [be Kendra Patrick Email * Bc: johrdce@gnail.ccm kendra@shimp-engineering.com Phone Number* Bc: 434-973-9999 434-227-5140 Application Number* Bc SOF201800005 SDP201800003 (Refs +4 dgd yea+5 digit nunber Is this an LOR?* Pr Yes r No Project Name (tom entry needed) HANSEN ROAD CHURCH- FINAL Project Type (tom entry needed) SDP File Upload Only RFand 11FFf letypes accepted LOR2_FbnsenRd(200817).pdf 8.2MB Narrative_LOR2_HansenRd(200817).pdf 166.17KB Response _LOR2_FbnsenRd(200817).pdf 195.75KB RetainingWallDesign_FfansenRd(200817).pdf 337.8KB Mwrrums¢e per file: 70M3