Loading...
HomeMy WebLinkAboutSDP202000024 Correspondence Final Site Plan and Comps. 2020-08-14ENGINEERS SURVEYORS PLANNERS ASSOCIATES August 14, 2020 Ms. Tori Kanellopoulos County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, VA 22902-4596 Re: Stonefield Block DI FSP W WA Project No. 219040.04 Dear Ms. Kanellopoulos: We have received the County comments dated August 10, 2020 for the Stonefield Block D1 Final Site plan. Our response is as follows: Plannin¢ 2. 18-4.11.4 Easement conflicts. It appears there may be easement conflicts with the existing gas easement and existing power easement. Contact Charlottesville Gas and Dominion Power directly to ensure building is not conflicting with easements. Attached is additional guidance for Dominion Power easements. c. Comment: REV 1: Provide a letter from the gas line easement holder (signed) indicating their approval of the improvements shown within the easement. i. REV 2: Comment remains. Response: The easement plat will be submitted to the County under separate cover. 8. 18-32.5.2 Contents of an initial site plan and 18-32.6.2 Contents of a final site plan: e. Include the signed/approved resolution for the Special Exception approved by the Board of Supervisors on February 5, 2020. Ensure the conditions are being met. The resolution is attached for reference. a. Comment: REV 1: Partially addressed. Show how Condition 3(b) is being met. This should show elevations/stories of each side of the building, to ensure this requirement is being met. b. Comment: REV 2: Partially addressed. The Hydraulic Road section does not exactly match the section shown on Sheet 7 of the special exception. Recommend to also include Sheet 8 of the special exception with the final site plan, to be clear the maximum building height, including all roof appurtenance/mechanical equipment is 90 feet. This is also indicated on Sheet V of the special exception. Response: The requested building elevations have been included with this submittal. 968 Olympia Drive, Suite 1 • Charlottesville, VA 22911 Telephone (434) 984-2700 • Fax (434) 978-1444 Charlottesville • Lynchburg 9. 18-32.6.2/18-32.7.4.2/18-32.7.5.3 Easements: ii. Comment: There appear to be other discrepancies between the site plan and plat as well. For example, the plan shows the access easement of District Avenue being adjusted, while the plat shows the access easements of Inglewood and Bond being adjusted. Ensure both submittals match. a. Comment: REV 2: Partially addressed. The demo plan also needs to be updated. For example, Sheet 7 of the final site plan shows the sidewalk easement on the other side of District Ave as being relocated, which is not shown on the easement plat or site plan layout. Also ensure all new easements are shown and labeled on the landscaping plan — the SWM easement does not appear to be shownllabeled there. Response: The noted easements are shown on the plat, site plan and landscape plan. The sidewalk easement has been revised to match the plat submission. 15. Additional applications: The following applications and approvals are required prior tofinal site plan approval: e. 18-32.7.4.2 and 18-32.7.5.3: Easement Plats: All new and adjusted easements must be shown on an easement plat, which must be approved prior to final site plan approval, and must match the final site plan. See Engineering comments on required SWM easements. One easement plat may be submitted for all non ACSA easements, however Engineering has separate deed requirements for SWM easements. a. Comment: REV 1: Review of SUB201900150 (now an easement and subdivision plat) is in progress and review comments will be sent separately. b. Comment: REV 2: Comment remains. Response: Noted. f. Architectural Review Board: A Certificate of Appropriateness from the ARB is required prior to final site plan approval. Coordinate directly with Margaret Maliszewski (mmaliszewskigalbemarle. org). a. Comment: REV 1: ARB review is in progress. See ARB comments below. b. Comment: REV 2: Comment remains. Response: Noted. The ARB comments have been addressed. The applicable sheets are provided with the site plan. g. 18-32.7.4.1: Approval of a VSMP Plan is required prior to final site plan approval. See Engineering comments. Coordinate directly with John Anderson (janderson2(2albemarle. orgy. a. Comment: REV 1: VSWIWPO review is in progress. b. Comment: REV 2: Comment remains. Response: Noted. Zoning/Parking Reduction Request 1. Comment: REV 2: See attached letter dated August 6, 2020. They need to fix the parking requirements box on Sheet I to reflect my previous comments and determinations. The parking provided is correct, they just need to fix that box for 'parking required. " 968 Olympia Drive, Suite 1 • Charlottesville, VA 22911 Telephone (434) 984-2700 • Fax (434) 978-1444 Charlottesville • Lynchburg Page 2 of 3 Response: The cover sheet has been revised accordingly. Engineering 1. Comment: REV 2: See attached letter dated July 24, 2020. No design revisions per se, but reminders listed at item 5. Item 5 is last remaining Engineering review comment. Response: Noted. The easement plat has been submitted and is under review. We trust that these revisions adequately address your concerns. Please do no hesitate to contact us if you have any questions. Sincerely, WW Associates, Inc. John D. Beime, Jr., P.E. Senior Project Engineer 968 Olympia Drive, Suite 1 • Charlottesville, VA 22911 Telephone (434) 984-2700 • Fax (434) 978-1444 Charlottesville • Lynchburg Page 3 of 3