Loading...
HomeMy WebLinkAboutARB201900146 Staff Report 2020-01-06 (2)Project #/Name ARB-2019-146: Beaver Creek — Medical Office Building Final Site Plan Review Type Final Site Development Plan Parcel Identification 06000000003800 Location 2248 & 2246 Ivy Road, at the intersection with Twin Sycamores Lane (Figures 1-5) Zoned Highway Commercial (HC)/Entrance Corridor (EC)/Airport Impact Area (AIA) Owner/Applicant West End Shops -West LLC/Tumer Enterprises (John Thier) Magisterial District Jack Jouett Proposal To construct a two-story 26,600 sf medical office building, underground parking and associated site improvements on approximately 1.42 acres. Context This portion of Ivy Road is primarily commercial in nature, with strip shopping centers and stand-alone businesses nearby (Figures 6-8). University Heights apartment complex is directly behind (to the south) the subject parcel. Many of the commercial buildings in the vicinity are two stories tall. A significant portion of the adjacent development along Ivy Road predates the establishment of the EC and, consequently, does not meet the requirements of the EC guidelines. Visibility Three sides of the building and site will be clearly visible from the EC (Ivy Road). The proposed building is 18' from the right-of-way and approximately 32' from the curb face along Ivy Road. ARB Meeting Date January 6, 2020 Staff Contact Paty Satemye PROJECT HISTORY The existing buildings were built prior to the creation of the Entrance Corridor (EC) overlay district. Oral history holds that the structure at 2248 Ivy Road was constructed in 1780, though there has been no substantive proof of this. The Albemarle County Historic Preservation Committee will request permission to document the structure prior to demolition. That documentation may help pinpoint the date of construction. The ARB has reviewed a number of sign applications for this property since 1990. A preapplication conference was held in 2017 to discuss potential development of this site (according to a different plan). The ARB reviewed the initial site plan on October 7, 2019. DATE APPLICATION/REVIEW TYPE RESULT 10/7/2019 ARB-2019-101: Beaver Creek Medical Office Building, Initial Site Development Plan review ARB meeting & review comments (see attachment A for action letter). 1/6/2020 ARB-2019-146: Beaver Creek Medical Office Building, Final Site Development Plan review The ARB will review this final site development plan. ANALYSIS REF GUIDELINE COMMENTS 10/7/2019 CURRENT ISSUE RECOMMENDATION Structure design 1 The goal of the regulation of the design of development None at this time. The applicant proposes to construct a Provide a perspective view showing the within the designated Entrance Corridors is to insure that building with a 13,300 sf footprint and two northeast comer of the building and the new development within the corridors reflects the stories of office space over parking. The entrance to the underground parking as traditional architecture of the area. Therefore, it is the building is located approximately 18' from viewed from the EC. purpose of ARB review and of these Guidelines, that the right-of-way and 32' from the EC face of proposed development within the designated Entrance curb. Provide information on the VLT and Corridors reflect elements of design characteristic of the VLR ratings for the window glass. significant historical landmarks, buildings, and structures The mass of the building is broken down Ensure that the glass meets the required of the Charlottesville and Albemarle area, and to promote into bays by varying materials, colors, limits. orderly and attractive development within these corridors. textures and design elements. What at first Applicants should note that replication of historic structures glance in the color renderings appears to be Add the standard window glass note to is neither required nor desired. brick, is a redwood Nichiha fiber cement rainscreen panel with a wood texture. Its the drawings with the next submission: Visible light transmittance (VLT) shall 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience these sites color and texture, as shown in the not drop below 40916. Visible light as ensembles of buildings, land, and vegetation. In order to renderings, appear coordinated with the re. lectance (VLR) shall not exceed 30%a accomplish the integration of buildings, land, and brick buildings in the vicinity (southeast vegetation characteristic of these sites, the Guidelines perspective and Figure 9). Other proposed Provide a material sample for the require attention to four primary factors: compatibility materials include stone veneer, precast aluminum panel mechanical roof screen. with significant historic sites in the area, the character of concrete, aluminum composite panels, and the Entrance Corridor; site development and layout; and fiber cement rainscreen panels in "Ash" with Revise the east building elevation labels landscaping. wood texture and to match the precast concrete with a smooth texture. to clearly state the materials and colors of all components of the building, 3 New structures and substantial additions to existing structures should respect the traditions of the architecture including spandrel glass, if proposed. of historically significant buildings in the Charlottesville Stone veneer is provided along the full and Albemarle area. Photographs of historic buildings in length of the base of the building, and a Revise the materials information on the the area, as well as drawings of architectural features, cornice is provided at the top, creating a east building elevation to specify that all which provide important examples of this tradition are base -middle -top historic pattern. Although window glass is not tinted or provide contained in Appendix A. the building is 160' long, the color changes window glass samples for review. 4 The examples contained in Appendix A should be used as break up the wall mass, and the stone veneer a guide for building design: the standard of compatibility and fiber cement rainscreen panels add with the area's historic structures is not intended to impose texture. Also, the use of stone veneer for the a rigid design solution for new development. Replication full height of the projecting entrance bay, of the design of the important historic sites in the area is window variations and awnings break the neither intended nor desired. The Guideline's standard of building into smaller human scale sections. compatibility can be met through building scale, materials, and forms which may be embodied in architecture which The mass of the side elevations is broken is contemporary as well as traditional. The Guidelines down by projecting columns of stone veneer, allow individuality in design to accommodate varying which are slightly taller than the rest of the tastes as well as special functional requirements. side facades. The width of the building is also broken up into bays that are 9 Building forms and features, including roofs, windows, doors, materials, colors and textures should be compatible distinguished by varying materials, colors, with the forms and features of the significant historic textures and design elements. buildings in the area, exemplified by (but not limited to) the buildings described in Appendix A [of the design Two perspectives have been provided. They guidelines]. The standard of compatibility can be met help clarify the mass and form of the through scale, materials, and forms which may be building. However, the one showing the east embodied in architecture which is contemporary as well as elevation is taken from the southeast. A view traditional. The replication of important historic sites in from the northeast would further clarify the Albemarle County is not the objective of these guidelines. appearance of the underground parking entrance as seen from the EC. 1 I The overall design of buildings should have human scale. Scale should be integral to the building and site design. Material samples have been provided for the 13 Any appearance of "blankness" resulting from building design should be relieved using design detail or majority of the materials, but the applicant is vegetation, or both. working on finalizing some of the materials. No sample has been provided for the metal 14 Arcades, colonnades, or other architectural connecting devices should be used to unify groups of buildings within screen for the mechanical equipment on the a development. roof, but the applicant has stated that the finish will match the grey fiber cement 15 Trademark buildings and related features should be modified to meet the requirements of the Guidelines. rainscreen. The labels specifying the materials and colors on the east building 16 Window glass in the Entrance Corridors should not be highly tinted or highly reflective. Window glass in the elevation are not complete and clear. Entrance Corridors should meet the following criteria: Visible light transmittance (VLT) shall not drop below No information has been provided on the 40%. Visible light reflectance (VLR) shall not exceed 30016. window glass tint, reflectivity or type. Specifications on the proposed window glass should be Ground level window openings on the EC submitted with the applicationforfinal review. elevation are openings into the underground parking. The openings are not filled with glass. They are an integrated part of the design of the base of the building and are expected to have an appropriate appearance. 5 It is also an important objective of the Guidelines to None at this time. Many of the buildings in the area predate the It is requested that the applicant establish a pattern of compatible architectural establishment of the EC and, consequently, communicate with the Albemarle characteristics throughout the Entrance Corridor in order do not meet the requirements of the EC Historic Preservation Committee in to achieve unity and coherence. Building designs should guidelines (Figures 7 & 8). reference to allowing them to document demonstrate sensitivity to other nearby structures within the stone cottage prior to its demolition. the Entrance Corridor. Where a designated corridor is The color palette and scale of the building is substantially developed, these Guidelines require striking a consistent with those of the buildings across careful balance between harmonizing new development the street, along Old Ivy Road (Figure 9). with the existing character of the corridor and achieving compatibility with the significant historic sites in the area. Note that the existing stone cottage (Figure 3) has historic significance. Consequently, 10 Buildings should relate to their site and the surrounding context of buildings. the property should be thoroughly documented prior to demolition. The 12 Architecture proposed within the Entrance Corridor should use forms, shapes, scale, and materials to create a cohesive Albemarle County Historic Preservation whole. Committee will request permission to do so. The applicant is also welcome to submit documentation. Accessory structures and equipment 17 Accessory structures and equipment should be integrated Include the type, manufacturer and A dumpster enclosure, and a detail for the Include the type, manufacturer and color into the overall plan of development and shall, to the color of the masonry material utilized enclosure, are shown on the site plan. of the material utilized in the dumpster extent possible, be compatible with the building designs in the dumpster enclosure in the However, the type, manufacturer and color enclosure in the dumpster detail. used on the site. dumpster detail. of the material of the screening wall are not specified in the detail and are not included in Provide a roof plan showing the location 18 The following should be located to eliminate visibility from the Entrance Corridor street. If, after appropriate siting, these Show how visibility of all mechanical the architectural plans or exhibits. and height of the rooftop mechanical features will still have a negative visual impact on the equipment will be eliminated from equipment. Revise the elevation views Entrance Corridor street, screening should be provided to the EC. No mechanical equipment is shown on the to include dashed lines for the rooftop eliminate visibility. site plan but a "Mechanical Roof Screen" is mechanical equipment. Confirm the a. Loading areas, b. Service areas, c. Refuse areas, d. shown on the elevations. This screen is not reason for not showing the roof screen Storage areas, e. Mechanical equipment, f. Above -ground shown in the perspective views, suggesting in the perspective views. utilities, and g. Chain link fence, barbed wire, razor wire, that it won't be visible from the street due to and similar security fencing devices. the height of the building, setback of the screen, and vantage point from the street. A 19 Screening devices should be compatible with the design of the buildings and surrounding natural vegetation and may roof plan has not been provided, but would consist of a. Walls b. Plantings, and c. Fencing. be useful for showing the mechanical 21 The following note should be added to the site plan and the equipment locations and heights relative to architectural plan: "Visibility of all mechanical equipment the screen. from the Entrance Corridor shall be eliminated." Although adding a metal screen around mechanical equipment is not the preferred method for eliminating visibility (particularly at the length that is proposed), the material, color, and proportion of the proposed screen are coordinated with the building design and, minimize impacts. Breaking the screened area on the roof into smaller sections could draw more attention to the screening wall. The mechanical equipment visibility note is provided on the plan. 20 Surface runoff structures and detention ponds should be None. The proposed layout impacts the full parcel None. designed to fit into the natural topography to avoid the need and no natural drainage patterns will be for screening. When visible from the Entrance Corridor preserved. The majority of the stormwater street, these features must be fully integrated into the runoff will be stored in underground storage landscape. They should not have the appearance of facilities. No detention ponds are proposed. engineered features. 44 Natural drainage patterns (or to the extent required, new drainage patterns) should be incorporated into the finished site to the extent possible. Lighting General Guidelines 22 Light should be contained on the site and not spill over None at this time. The maximum footcandles for the site is 8. Revise the plan to include all budding onto adjacent properties or streets; The height of the pole -mounted light fixtures mounted lighting and extend the lighting calculation grid to the EC. 23 Light should be shielded, recessed or flush -mounted to eliminate glare. All fixtures with lamps emitting is specified at 20' AEG (above finished 3000 lumens or more must be full cutoff fixtures. grade). Ensure that the photometric plan was 24 Light levels exceeding 30 footcandles are not appropriate for display lots in the Entrance Corridors. No building mounted lights have been calculated using a Light Loss Factor specified. (LLF) of 1.0 and note this on the plan. Lower light levels will apply to most other uses in the Entrance Corridors. 25 Light should have the appearance of white light with The free-standing pole -mounted light Revise the lighting plan to include the a warm soft glow; however, a consistent appearance fixtures appear to be full cutoff. color of the light poles. throughout a site or development is required. Consequently, if existing lamps that emit non -white The color of the light fixtures is bronze, but Revise the lighting plan to include the light are to remain, new lamps may be required to the color of the Light pole is not specified. standard lighting note. match them. The light fixture table does not include the maintenance factor. 26 Dark brown, dark bronze, or black are appropriate colors for free-standing pole mounted light fixtures in the Entrance Corridors. The standard lighting note is not provided on the Calculated Lighting Level Plan. 27 The height and scale of freestanding, pole -mounted light fixtures should be compatible with the height and scale of the buildings and the sites they are illuminating, and with the use of the site. Typically, the height of freestanding pole -mounted light fixtures in the Entrance Corridors should not exceed 20 feet, including the base. Fixtures that exceed 20 feet in height will typically require additional screening to achieve an appropriate appearance from the Entrance Corridor. 28 In determining the appropriateness of lighting fixtures for the Entrance Corridors, the individual context of the site will be taken into consideration on a case by case basis. 29 The following note should be included on the lighting plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 30- light used for decorative effect shall: No decorative lighting has been proposed. None. 32 Landscaping 7 The requirements of the Guidelines regarding landscaping Consider replacing the Ginkgo with a The building has been shifted further back Revise the plan to provide 3% inch are intended to reflect the landscaping characteristic of large shade tree with a broader from the EC and sufficient planting area caliper large shade trees along the EC. many of the area's significant historic sites which is canopy. outside of the existing permanent easements characterized by large shade trees and lawns. Landscaping has been provided. Revise the label for the "temporary should promote visual order within the Entrance Corridor It is recommended that the sf of easement for entrance" in the site plan and help to integrate buildings into the existing canopy specified for the Ginkgo be Conflicts between permanent utilities and to indicate when the easement is to be environment of the corridor. revised in the plant schedule. proposed landscaping along the EC frontage have been eliminated. A "temporary vacated. Show how the easement will not conflict with the proposed building 8 Continuity within the Entrance Corridor should be obtained by planting different types of plant materials that Revise the plan to provide additional easement for entrance" is shown along the or landscaping. share similar characteristics. Such common elements allow on -site planting area outside of EC. Its location conflicts with the EC for more flexibility in the design of structures because easements to accommodate required landscaping. See issue 35 below in See recommendation 35 below. common landscape features will help to harmonize the frontage planting. reference to conflicts elsewhere on the site appearance of development as seen from the street upon plan. which the Corridor is centered. Ensure that there are no conflicts between the utilities and the proposed Large shade trees of 2'/z inch caliper are 32 Landscaping along the frontage of Entrance Corridor streets should include the following: landscaping. proposed along the EC at 35' on center but a. Large shade trees should be planted parallel to the 3% inch caliper trees are required along the Entrance Corridor Street. Such trees should be at least 3% EC. inches caliper (measured 6 inches above the ground) and should be of a plant species common to the area. Such Flowering ornamental trees are interspersed trees should be located at least every 35 feet on center. between the large shade trees along the EC. b. Flowering ornamental trees of a species common to the area should be interspersed among the trees required by the preceding paragraph The ornamental trees need not alternate one for one with the large shade trees. They may be planted among the large shade trees in a less regular spacing pattern c. In situations where appropriate, a three or four board fence or low stone wall, typical of the area, should align the frontage of the Entrance Corridor street. d. An area of sufficient width to accommodate the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street, and exclusive of road right-of-way and utility easements. 33 Landscaping along interior roads: Provide large shade trees, at least 2%:" Seven large shade trees of 2%" caliper have Revise the plan to provide a minimum of a. Large trees should be planted parallel to all interior caliper in size at planting and a been provided along Twin Sycamore Lane 5' between proposed trees and the gas roads. Such trees should be at least 2% inches caliper spacing of 40 feet on center, along at a spacing of 40' on center. Three of these line. Shifting the sidewalk closer to the (measured six inches above the ground) and should be of a Twin Sycamores Lane. trees are within 3 to 4' of an existing gas building and locating the trees closer to plant species common to the area. Such trees should be line and 4' of the proposed building. There the curb may be an option. located at least every 40 feet on center. is an additional shade tree 2' from the gas line adjacent to the parking area. 34 Landscaping along interior pedestrian ways: Depending on the architectural Because of the proximity of the building to None. a. Medium trees should be planted parallel to all interior design, additional landscaping may the EC right-of-way, street trees are shown pedestrian ways. Such trees should be at least 2'/2 inches be required along the length of the close to the front of the budding. No shrubs caliper (measured six inches above the ground) and should building. are proposed along the front of the building, be of a species common to the area. Such trees should be which is over 160' in length. However, on located at least every 25 feet on center. the right end of the north elevation there is sufficient variety in materials and patterns to 36 Landscaping of buildings and other structures: a. Trees or other vegetation should be planted along the soften the appearance of the exterior walls. front of long buildings as necessary to soften the Also, although there is a long expanse of appearance of exterior walls. The spacing, size, and type low openings into the underground parking of such trees or vegetation should be determined by the on the left end of the north elevation, the length, height, and blankness of such walls. large shade trees and ornamental trees that b. Shrubs should be used to integrate the site, buildings, are proposed along the EC will soften the and other structures; dumpsters, accessory buildings and appearance of that portion of the building. structures, "drive thru" windows; service areas; and signs. Shrubs should measure at least 24 inches in height. 35 Landscaping of parking areas: Provide large trees along the There are sufficient trees on the west Revise the site plan to increase the a. Large trees should align the perimeter of parking areas, perimeter parking area at a spacing of perimeter of the parking lot and within its clearance between the large shade tree located 40 feet on center. Trees should be planted in the 40' on center and 2%" caliper. interior. that is adjacent to the parking lot, and interior of parking areas at the rate of one tree for every 10 within 2' of the gas line, and the gas parking spaces provided and should be evenly distributed See recommendations 32 above. An additional large tree is required on the line. throughout the interior of the parking area. east perimeter of the parking lot. However, b. Trees required by the preceding paragraph should existing and proposed easements limit where Revise the site plan to add one small tree measure 2%, inches caliper (measured six inches above the trees can be planted in this area. There is along the east perimeter of the parking ground); should be evenly spaced; and should be of a insufficient space to plant another large area. species common to the area. Such trees should be planted shade tree without causing damage to other in planters or medians sufficiently large to maintain the trees in the immediate vicinity. Move the two large trees away from the health of the tree and shall be protected by curbing. dumpster to other interior islands within c. Shrubs should be provided as necessary to minimize the The existing parking lot extends to within 5' the southern parking row to avoid parking area's impact on Entrance Corridor streets. Shrubs of the southern property line with no damage. should measure 24 inches in height. screening to the adjacent residential use. The layout of the parking lot has been revised since the initial site plan (Figure 10 & 11). The curb is now proposed 2' from the southern parcel boundary, and a screening fence is proposed between the curb and the property line, leaving no planting area for parking lot perimeter trees. This area is subject to an undisturbed buffer requirement. The applicant is requesting a special exception to disturb the area. The Planning Division considers the screening fence and interior parking lot trees to be an improvement over the existing condition. Given that finding, and the location of the parking behind the building, shifting the perimeter parking trees to interior islands along the southern edge of the parcel is acceptable in this instance. However, two parking lot trees are directly adjacent to the dumpster area and should be relocated to avoid damage. 37 Plant species: None. The proposed plant species are appropriate. None. a. Plant species required should be as approved by the Staff based upon but not limited to the Generic Landscape Plan Recommended Species List and Native Plants for Virginia Landscapes (Appendix D . 38 Plant health: None. The note is provided on the site plan. None. The following note should be added to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant.,, Development pattern and site grading 6 Site development should be sensitive to the existing Ensure that the proposed sidewalk The existing site has very little of its See recommendation 32 above. natural landscape and should contribute to the creation of connects to proposed County "natural setting" remaining. There is a slope an organized development plan. This may be streetscape improvements. from the EC up to a parking area and the accomplished, to the extent practical, by preservingthe existing old stone cottage (Figure 2). trees and rolling terrain typical of the area; planting new trees along streets and pedestrian ways and choosing species that reflect native forest elements; insuring that any grading will blend into the surrounding topography thereby creating a continuous landscape; preserving, to the extent practical, existing significant river and stream valleys which may be located on the site and integrating these features into the design of surrounding development; and limiting the building mass and height to a scale that does not overpower the natural settings of the site, or the Entrance Corridor. Ensure that the building does not conflict with easements. See recommendations 18 and 19 above. Conflicts between permanent utilities and proposed landscaping along the EC frontage have been eliminated. A "temporary easement for entrance" is shown along the EC. It conflicts with the building. Adjacent to the stone cottage are two large shade trees and an open lawn area. The rest of the parcel includes a large commercial structure, a private street, parking areas and parking accessways (Figures 4 & 5). 39 The relationship of buildings and other structures to the Entrance Corridor street and to other development within The proposed layout of the site plan is the corridor should be as follows: organized, with the proposed building a. An organized pattern of roads, service lanes, bike paths, parallel to Ivy Road and the parking located and pedestrian walks should guide the layout of the site. under and behind the proposed structure. In. In general, buildings fronting the Entrance Corridor street should be parallel to the street. Building groupings The proximity of the building to the EC is should be arranged to parallel the Entrance Corridor street. much closer than any of the other c. Provisions should be made for connections to adjacent developments in the immediate area. pedestrian and vehicular circulation systems. However, it meets the setbacks specified by d. Open spaces should be tied into surrounding areas to County's current zoning ordinance and, provide continuity within the Entrance Corridor. therefore, future buildings along Ivy Road e. If significant natural features exist on the site (including should have a similar proximity. creek valleys, steep slopes, significant trees or rock outcroppings), to the extent practical, then such natural No sidewalks or bike lanes currently exist on features should be reflected in the site layout. If the this portion of Ivy Road. However, bike provisions of Section 32.5.6.n of the Albemarle County lane and sidewalk improvements are planned Zoning Ordinance apply, then improvements required by by the County in this section of Ivy Road, that section should be located so as to maximize the use of and the plan shows a sidewalk along the existing features in screening such improvements from frontage. Entrance Corridor streets. f The placement of structures on the site should respect No retaining walls are proposed for the site. existing views and vistas on and around the site. No significant natural features exist on the 40 Site grading should maintain the basic relationship of the site to surrounding conditions by limiting the use of site. retaining walls and by shaping the terrain through the use of smooth, rounded land forms that blend with the existing 10 terrain. Steep cut or fill sections are generally unacceptable. Proposed contours on the grading plan shall be rounded with a ten foot minimum radius where they meet the adjacent condition. Final grading should achieve a natural, rather than engineered, appearance. Retaining walls 6 feet in height and taller, when necessary, shall be terraced and planted to blend with the landscape. 41 No grading, trenching, or tunneling should occur within the None. No existing trees are shown to be preserved. None. drip line of any trees or other existing features designated No existing trees are within the `undisturbed for preservation in the final Certificate of Appropriateness. buffer" area that is required at the rear of the Adequate tree protection fencing should be shown on, and parcel. coordinated throughout, the grading, landscaping and erosion and sediment control plans. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. Signs Signage is reviewed and approved by Sign applications are required for all separate submission. However, the proposed signs. following preliminary comments are provided. If this will be a multi -tenant building, submit a comprehensive sign plan for A comprehensive sign plan is required for review. Note that ARB approval of a multi -tenant buildings. Approval of a comprehensive sign plan is required for comprehensive sign plan is required prior to multi -tenant buildings prior to ARB final ARB approval. approval of the final site plan. CYMh0%\:7YI]01RX0 r)uMyMILIT—WIRM Staff recommends the following as the primary points of discussion: 1. Trees within parking islands, on the southern edge of the parcel, counting towards the parking lot perimeter tree requirement. 2. Trees along the east perimeter of the parking area. Allowing a small tree to be utilized, in place of a large tree, because of the limited planting area. 3. Roof screen 4. Entrance to underground parking Regarding the Final Site Plan: Staff recommends approval with the following required conditions: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4(2), (3) and (5): A Certificate of Appropriateness is required prior to final site plan approval. 1. Provide a perspective view showing the northeast comer of the building and the entrance to the underground parking as viewed from the EC. 2. Provide information on the VLT and VLR ratings for the window glass. Ensure that the glass meets the required limits. 3. Add the standard window glass note to the drawings with the next submission: Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30% 4. Provide a material sample for the aluminum panel mechanical roof screen. 5. Revise the east building elevation labels to clearly state the materials and colors of all components of the building, including spandrel glass, if proposed. 6. Revise the materials information on the east building elevation to specify that all window glass is not tinted or provide window glass samples for review. 7. Include the type, manufacturer and color of the material utilized in the dumpster enclosure in the dumpster detail. 8. Provide a roof plan showing the location and height of the rooftop mechanical equipment. Revise the elevation views to include dashed lines for the rooftop mechanical equipment. Confirm the reason for not showing the roof screen in the perspective views. 9. Revise the plan to include all building mounted lighting and extend the lighting calculation grid to the EC. 10. Ensure that the photometric plan was calculated using a Light Loss Factor (LLF) of 1.0 and note this on the plan. 11. Revise the lighting plan to include the color of the light poles. 12. Revise the lighting plan to include the standard lighting note. "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a frill cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 13. Revise the plan to provide 3 %: inch caliper large shade trees along the EC. 14. Revise the label for the "temporary easement for entrance" in the site plan to indicate when the easement is to be vacated. Show how the easement will not conflict with the proposed building or landscaping. 15. Revise the plan to provide a minimum of 5' between proposed trees and the gas line. Shifting the sidewalk closer to the building and locating the trees closer to the curb may be an option. 16. Revise the site plan to increase the clearance between the large shade tree that is adjacent to the parking lot, and within 2' of the gas line, and the gas line. 17. Revise the site plan to add one small tree along the east perimeter of the parking area. 18. Move the two large trees away from the dumpster to other interior islands within the southern parking row to avoid damage. 19. Sign applications are required for all proposed signs. 20. If this will be a multi -tenant building, submit a comprehensive sign plan for review. Note that ARB approval of a comprehensive sign plan is required for multi -tenant buildings prior to ARB approval of the final site plan. 12 • Regarding recommendations on the plan as it relates to the guidelines: 1. It is requested that the applicant communicate with the Albemarle Historic Preservation Committee in reference to allowing them to document the stone cottage prior to its demolition. TABLE A This report is based on the following submittal items: Sheet # Drawing Name Drawing Date/Revision Date CO.0 Cover Sheet 11/25/2019 CLO Notes and Details 1 11/25/2019 CLI Notes and Details 2 11/25/2019 C1.2 Notes and Details 3 11/25/2019 C1.3 Notes and Details 4 11/25/2019 C2.0 Existing Conditions 11/25/2019 C2.1 Demolition Plan 11/25/2019 C4.0 Site Plan 11/25/2019 C5.0 Grading and Drainage Plan 11/25/2019 C5.1 Grading Sot Shot Plan 11/25/2019 C5.2 Sight Distance Profiles 11/25/2019 C7.0 Storm and Utilities Profiles 11/25/2019 C8.0 Easement Plan 11/25/2019 LLO Landscape Plan 11/25/2019 L2.0 Landscape Notes and Details 11/25/2019 SELO Calculated Lighting Level Plan 11/25/2019 Parking Level — basement architectural plan 11/25/2019 First Floor — first floor architectural plan 11/25/2019 Second Floor — second floor architectural plan 11/25/2019 Dimension Plan — second floor architectural plan 11/25/2019 East Building Elevation — Building Height 11/25/2019 East Building Elevation — Building Materials 11/25/2019 East Building Elevation 11/25/2019 North Building Elevation 11/25/2019 West Building Elevation 11/25/2019 13 South Building Elevation 11/25/2019 Concept Image Photo Rendering from Northwest 11/25/2019 Concept Image Photo Rendering from Southeast 11/25/2019 Existing Conditions Photo from Northeast 11/25/2019 Existing Conditions Photo from Northwest 11/25/2019 Material Samples: Cultured Stone Veneer - Aspen Country Ledgestone; Fiber Cement Rainscreen System - Vintage Wood - Redwood EPC765F; Fiber Cement Rainscreen System (lap siding)- Vintage Wood - Ash EPC764F, Fiber Cement Rainscreen System - color to match precast concrete; Precast Concrete; Aluminum Storefront System - Sunshades and Coping - BGY Grey - 4mm4BGY3.5; Aluminum Composite Panel - color to match precast concrete. 14 ARB2019-101 Online GIS Vicinity 9-13-2019 l`i ' $ so 60B1,159 speV ' 7—, 60814115d 76A-A - Legend ^"bg ire++��on+mmxeemwuwm� ¢y T-Q�J 6081�155 60-0SA / rve ?n rva 6082-1 80 4^,r60B1-153 ! �- - a. —I mm 60,01-1'51 r ❑aarmis 60-49C 608'.11235 0 r i 60 45A 1 608 4 1i80 0 ti J m l 60,.45 A2 LL old -IVY -Rd tlb 60-48A 76A-J2 e N IY /7tl-.60-4_860 VA" UV A n.r.L. PMiae :nt 60-47 i -JOC 6046 60-47B I J 60 46B f 60-46A -/ 76A-J3 Ls -6 60-31 60-37 j - ,60-46C d 60-39 v 60 36 � 60-40C1 N AN � - -'-� �3 1� � 60 -400 60-40B1 60-30B 60H-A �s.�5�) 60.4005 �� 60-34A '��L� '- -� 60-40E 60-40C2 60 40C3 60-30 so bolo yJ� o 60-40A � o 0 b"b ,60-4007 5t Anne; O� 60-4006 �W1s y te1,A4� i .f - -e ' I csmree 60-9008 nrvrmrern a:wnpr rcp... yya mpeM Mcrceea pn yaervmnr v.-e +.nr .ten-..:,i sacrtrrH is mra wuyar,m my>nertip uu ,. msueo .envy anymo ueum trrvnneu yege Jvnmuep ynm �z-u xr�rugme maBawm Ne.:+� u++ary spme)I�'s'+.,s1/1 Figure]: Vicinity map. 15 Figure 4: The existing commercial building. Figure 5: Existing parking to the rear of the commercial building. 17 wz- -11: Ill, Earth met— Ulm"% in ---jwgL-0 Figure 8: Existing funeral home to the west. Figure 9: Existing commercial buildings to the north. on Old Ivy Road 19 Figure 10: Initial Site Plan Layout. 20 Figure 11: Initial Site Plan Landscape Plan. 21 a a a- COUNTY OF ALBEMARLE A: Department of Community Development 401 McIntire Road, North Wing y Charlottesville, Virginia 229024596 b Phone (434) 296-5832 Fax (434)972-4126 October 8, 2019 Mr. John Thier Turner Enterprises 230 West Main St, Ste 201 o` Charlottesville, VA 22902 RE: ARB-2019-101: Beaver Creek Medical Office (06000000003800) Dear Applicant, t` At its meeting on Monday, October 7, 2019, the Albemarle County Architectural Review Board e unanimously voted to forward the following recommendations on the above -noted Initial Site Development Plan to the agent for the Site Review Committee garding requirements to satisfy the design guidelines as per § 18-30.6.4(2), (3) and (5) A Certificate of ADDrooriateness is reouired Drior to final site Dlan aoorovai. 1. Include the type, manufacturer and color of the masonry material utilized in the dumpster enclosure in the dumpster detail. 2. Show how visibility of all mechanical equipment will be eliminated from the EC. 3. Revise the plan to provide additional on -site planting area outside of easements to accommodate required frontage planting. 4. Ensure that there are no conflicts between the utilities and the proposed landscaping. 5. Provide large shade trees, at least 2 W caliper in size at planting and a spacing of 40 feet on center, along Twin Sycamores Lane. 6. Depending on the architectural design, additional landscaping may be required along the length of the building. 7. Provide large trees along the perimeter parking area at a spacing of 40' on center and 2 Yz caliper. 8. Ensure that the proposed sidewalk connects to proposed County streetscape improvements. 9. Ensure that the building does not conflict with easements. Regarding recommendations on the plan as it relates to the guidelines: 10. Consider replacing the Ginkgo with a large shade tree with a broader canopy. 11. It is recommended that the sf of canopy specified for the Ginkgo be revised in the plant schedule. Regarding recommended conditions of initial plan approval Prior to Initial Plan approval None Regarding conditions to be satisfied prior to issuance of a grading permit: None You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at www.albemade.orq/ARB. Please be certain that your ARB submittal addresses the above -noted issues. If you have any questions concerning any of the above, please feel free to contact me. Sincerely, Paty Satemye Senior Planner 434-296-5832 x3250 psatemye@albemade.org cc: West End Shops — West LLC 2246 Ivy Road, Ste 5 Charlottesville, VA 22903 ARB-2019-101 N N