Loading...
HomeMy WebLinkAboutSUB202000094 Correspondence 2020-08-13Cameron Langille From: David Jordan <Dave@vacls.com> Sent: Thursday, August 13, 2020 11:44 AM To: Barry Wood; Keane Rucker; Justin Shimp; Nicole Scro Cc: Melody Beisner Subject: RE: SUB202000094 St. Francis Avenue Subdivision Plat - 2nd Review Comments Attachments: A-TMP 31-7-B 2-Subdivision-V3.pdf Please find attached a pdf and the responses to the following comments. 1. [14-302 (A)(3)] Please revise the label for the existing 50' private ROW easement on TMP 31-7 and 31- 76. It should state the recorded plat/instrument that created it. DB 1082 pages 640-645. It should also state that it is a private street easement per DB 1082 pages 640-645. Rev. 1: Comment addressed. • Acknowledged. 2. [14-302(A)(5)] Please see Engineering comments regarding the SWM forest & Open Space easement. Rev. 1: Comment stands, see Engineering Division review comments below. • The Deed of Dedication for the SWM facility Easements and the SWM Forest and Open Space Easements I believe has been taken care of. 3. [14-302 (A)(9)] Revise note 8 so that it states "Lots A and B each contain a building site that complies with section 4.2.1 of the Albemarle County Zoning Ordinance." Rev. 1: Comment addressed. • Acknowledged. 4. [14-302 (A)(10)] Revise note 9 so that it states "Lots A and B are each assigned two (2) development rights and when further divided these rights shall not comprise more than [number] acres." Rev. 1: Comment addressed. • Acknowledged. 5. [14-302(A)(3)] Remove the words "Sant Francis Avenue" from the new 30' private street easement. The new private street easement should simply be labeled "C/L New 30' private street easement." Rev. 1: Comment addressed. • Acknowledged. 6. [General Comment] Please change the labels for all adjacent properties so that "PID" is stated "TMP." Rev. 1: Comment addressed. • Acknowledged. 7. [14-302 (B)(1)] Please add a date of last revision to each sheet. Rev. 1: Comment stands. • The Revision Date has been updated. 1 8. [14-302 (B)(5)] State all Zoning Overlay Districts that apply to TMP 31-7 in a note. TMP 31-7 is within the AIA Airport Impact Area Overlay District. Rev. 1: Comment addressed. • Acknowledged. 9. [14-302 (B)(10)] Add a note stating 'The stream buffer(s) shown hereon shall be managed in accordance with the Albemarle County Water Protection Ordinance." Rev. 1: Comment addressed. • Acknowledged. 10. [14-303 (A)] Please change the owner signature box title to "Statement of Consent to Division." Rev. 1: Please re -title the signature box to "Statement of Consent to Division." 2 a. Revise the language in the Statement of Consent to Division so that it states 'The platting or dedication of the following described land [insert a correct description of the land subdivided] is with the free consent and in accordance with the desire of the undersigned owners, proprietors and trustees, if any." Rev. 1: Comment addressed. b. Revise the owner name in the owner signature box. It should state "Barry Wood." Rev. 1: Comment addressed. • Acknowledged. 11. [14-303 (0)] Revise the County signature box so that it is titled "County Approval." Remove all other text currently in the box. Under the signature line, change "Albemarle County Official" to "Agent for the Board of Supervisors." Rev. 1: Comment not fully addressed. The text under the signature line needs to be revised to "Agent for the Board of Supervisors." • The text for the signature line has been revised to read as AGENT FOR THE BOARD OF SUPERVISORS. 12. [14-308.1] A Tier 2 groundwater assessment is required since this subdivision proposes to create lots measuring less than 21 acres as stated in Chapter 17, Section 17-1003 (a) of the County Code. Submit payment for the applicable fee of $355.00 with the next plat submittal. Rev. 1: Groundwater assessment fee received and assessment is still in process. The test results will be forwarded to the applicant once completed by the system and this comment will then be addressed. • Acknowledged. 13. [14-309, 14-310, and 14-416] Please provide soils evaluations for subsurface drainfields on all lots in accordance with Section 14-309. This information must be included with the submittal of the final plat. Approval from the Health Director for onsite septic and wells is required prior to final plat approval, in accordance with Section 14-310 and 14-416. A copy of the plat has been submitted to the Virginia Department of Health (VDH) for review. Rev. 1: Soils report has been received and transmitted to VDH for review and/or approval. VDH review still underway. Comments or approvals will be forwarded to the applicant upon receipt. • Acknowledged. 14. [14-316] The plat has been transmitted to VDOT for review. Rev. 1: VDOT has requested changes, see attached comments below. 2 • Acknowledged. 15. [14-317] A maintenance agreement for the proposed private street must be provided by the applicant and reviewed/approved by the County Attorney prior to final plat approval. The maintenance agreement must comply with all requirements of Section 14-317. A template for the maintenance agreement is attached to these review comments. Please complete the applicable sections of the template and submit it with the revised plat for review by staff. Rev. 1: Per applicant comment response letter, the resubmission package included a draft maintenance agreement. However, this document was not contained in the package. Please submit a draft with the next submittal. • Acknowledged. David Jordan, LS Commonwealth Land Surveying, LLC 1484 Greenbrier Place Charlottesville, VA 22901 434-973-0513 - office 434-333-2280 - cell From: Barry Wood [mailto:barrywwood7l@gmail.com] Sent: Wednesday, August 12, 2020 11:11 AM To: Keane Rucker; Justin Shimp; David Jordan; Nicole Scro; Barry Wood Subject: Fwd: SUB202000094 St. Francis Avenue Subdivision Plat - 2nd Review Comments Keane and Justin, I am concerned by this review letter. 2. The Deed of Dedication for the SWM and open space easements have been executed and notarized by Nicole, we did this on July 7. Nicole has the documents. 7, 10 & 11. These were supposed to have been addressed when we resubmitted. Did anyone verify all the changes had been made to the plat before resubmitting? Dave, can you jump on these revisions and get something back to Shimp Engineering asap. Please also send me a pdf version of the revised documents. 12. We submitted the fee payment 6 weeks ago.Can you give me an idea on how long this process typically takes and what is involved with the "test results"? 13. Full Soil Studies were sent to you all on 6/24. Do we need to call VDH? 14. Are we still good here? We got a response from Adam on Thursday last week that he was satisfied. I assume he hasn't sent his approval to Cameron yet? I'm concerned with this since his original letter was dated June 17 and Cameron didn't get it to us until July 17. 15. Looks like we left out the Road Maintenance Agreement from the prior submission. Frustrating considering there was an effort by all of us to expedite the document for the resubmittal. Nicole now has the fully executed and notarized agreement, I dropped it off last Wednesday Aug 5. Guys, I need to get this wrapped up. Next month will mark 3 years since we have started this project. After the first 2 years of effort, we learned that our preliminary 4 lot application was allowed to expire and now nearly 8 months since we audibled to a 2 lot division because it was supposed to be the "quick resolution". I have been politely and patiently pushing this effort but can't afford to let more time slip. It's not cheap to carry the debt on this indefinitely and I have had a significant amount of cash tied up in a bond for 12 months now. What can I do to help push this to the finish line? What can we do to get the County to expedite the next review? Thanks, IC . ---------- Forwarded message --------- From: Cameron Langille <blangille(a)albemarle.org> Date: Tue, Aug 11, 2020 at 5:42 PM Subject: SUB202000094 St. Francis Avenue Subdivision Plat - 2nd Review Comments To: Barry Wood <barrywwood7l(aQmail.com>, Keane Rucker <keane(a)shimp-engineering.com> Good evening, The 2' review comment letter is attached. Please be aware that the soils evaluation report was sent to VDH for review on July 16, but VDH has not completed their review yet. Any comments or approvals from VDH will be forwarded to you upon receipt. Please let me know if you have any questions. Thanks, Cameron Cameron Langille Senior Planner II Community Development Department Albemarle County, Virginia blangillegalbemarle.org (434) 296-5832 ext. 3432