Loading...
HomeMy WebLinkAboutSDP201900062 Other 2020-08-19 (3)Internal Use Only Date Received: Received by: Intake: Forward to Management Analyst SCHEDULE OF COMPLETION FOR BONDED IMPROVEMENTS PROJECT NAME: Georgetown Hydraulic Professional Offices (as on bond estimate request form and approved plan) This form is intended to facilitate the completion of bonded improvements in a timely manner by assuring the developer has a schedule in place, and by providing this Department a means to assess the developer's ability to meet the completion date stated in the bond agreement. The developer must provide a completion date for each milestone listed below. Date Milestone Public Roads Oct. 1, 2020 Start of construction. June 19, 2020 Submit all paperwork in accordance with the County's "Public Road Acceptance Procedure" (certificate of completion, as -built plans, recorded plats, professional engineer certification for completed improvements, etc.). VDOT documentation of acceptance (request to Board of Supervisors to adopt resolution to accept road(s) into secondary road system). Private Roads Oct. 1, 2020 Start of construction. June 19, 2020 Submit all paperwork in accordance with County's "Private Road Acceptance Procedure" (compiled report of CBR tests, stone depth inspections, and fill compaction tests, certified by a professional engineer, certificate of completion, as -built plans, recorded plats, professional engineer certification for completed improvements, etc.). Request 45-day inspection from County. Request final inspection from County. Water & Sewer Improvements Sept. 1, 2020 Improvements dedicated and "acceptance" letter issued by the Albemarle County Service Authority. Additional Bonded Subdivision Improvements (landscaping, pedestrian paths, sidewalks, etc.) March 1, 2021 Submit signed and sealed letter from a professional engineer listing and certifying that completed improvements are built according to approved plans and request inspection from County. Revised 11/10/2010 Page 1 of 2 SCHEDULE OF COMPLETION FOR BONDED IMPROVEMENTS By signing below, the owner/developer agrees to complete the bonded improvements in accordance with the above schedule. If, during the course of construction, the owner/developer finds they will be unable to meet the schedule, they must provide written justification to the County Engineer of the reasons preventilncompletion along with a revised completion schedule. Signature ner/Developer Robert Noll, on behalf of Hydraulic Georgetown LLC June 15, 2020 Print Name Date SCHEDULE OF COMPLETION ACCEPTED: County Engineer Date Subdivision/Road Performance Bond Completion Date Revised 11/10/2010 2 of 2