Loading...
HomeMy WebLinkAboutSDP201900062 Bond Estimates 2020-08-19Project Name: Georgetown Hydrualic Professional Office WPO file number: WPO_2019-00061 TMP(s): 60-F3 Date Estimate Completed: 06/10/2020 Erosion and Sediment Control Bond Estimate Item Item Number shabliaution(PS, TS) sill fence (SF) safety fence (SAF) diversion (DD, FD, RM) temporary slope tlrain (TSD) pipe length 0 ft pipe diameter 0 in eadhwark for trap/basin height of dam at fire 0 fit cut at high side 0 ft height of fill at face 0 fir cut at face 0 ft length of dam 0 fit length of ad 0 ft top width 0 ft width of" 0 ft - as aC' ,archon 0 sf (area below transitl, 0 at (total width of dam) 0 ft (total width of cut) 0 ft (height below transitic 0ft (depth below transit 0ft F,elowtransltion 0sf (area above tmnsiti Oat _me) 00cy (total fill volume) Goey length of spillway 0 fit (TOAL CY estimate 0 ey width of spillway 0 fit (spillway stone hoar 0 tons structures for basin Hear height 0 fir Hear diameter Din $000 barrel length 0 fit base plate or fdn 0 barrel diameter 0 in m 00 barrel collars 0 bare length 0 ft sill fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) length 5 fit width 6 ft channel (SCC, matted) length 0 fit width 0 ft check dam depth in channel 0 fit channel width 0 ft construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth 0 ft length 0.0 ft wiMh 0.0 (tons) 0 L-'s survey and layout (price per 0.1 mi.) acres 0.88 traps and basins 0 mobilization stream crossing (computed independently) No. Unit Unitost Cato. (installed 0.9 acres 55.000,00 $4.400.00 630.0 ft $5,00 $3.150.00 630.0 ft $5,00 $3.150.00 Oft $13,00 $0.00 $0,00 $0.00 $13.00 $0.00 $woo $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $100,00 $0.00 $200,00 $600.00 2 $135,00 $270.00 $0.00 0 $0,00 $0.00 1 $2,500,00 $2.500.00 1 $2,000,00 $2.000.00 0 $3,500,00 $0.00 $60,00 $0.00 $440.00 $2.500.00 $0.00 cast sum $19.010.00 contingency $1.901.00 Total $20,920 7r221i