HomeMy WebLinkAboutWPO201900042-Full Inspection Report (5)V
NOTICE TO COMPLY
Hand delivered
Project: WP0201900042
Spring Hill Village - VSMP
Operator/Contractor: Goodman Excavation
SPRING HILL LAND DEVELOPMENT LLC
Issued Date: 8/19/2020
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
Under section § 17-900 of the Albemarle County Code, this is your NOTICE TO COMPLY with
the requirements of the Land Disturbance Permit (or Agreement in Lieu of a Plan) for the
referenced project and to immediately take corrective measures to address erosion and sediment
control deficiencies on this property. This Notice to Comply is being issued because of the
following deficiencies:
Deficiency: Make sure RLD is updated. Should be G. Odonnell, not S. Carlson or J. Swink
Corrective Action: Update records as needed
Deficiency: Make required corrections as identified by the inspection report from the third party
Corrective Action: Follow up with identified non -conforming controls. Correct and record
completion
Deficiency: Large areas denuded and not stabilized.
Corrective Action: Seed and straw mulch any non active area dorment for longer than 7 days.
Use temporary seed and straw mulch as identified in the approved plan
Deficiency: Stockpiles observed to be dormant and not stabilized
Corrective Action: Seed and straw mulch as required by the VESCH manual and the approved
plan.
Deficiency: Bare structures are present at time of inspection
Corrective Action: Stabilize as required by the approved plan
Deficiency: Observed cut and fill bare.
Corrective Action: Stabilize as required by the approved plan to reduce the risk of erosion.
Deficiency: Channels to the basin and trap bare and eroding
Corrective Action: Stabilize as needed to prevent scour.
Deficiency: Observed large sediment deposits that are working their way to the downstream
properties
Corrective Action: Maintain proper care of all controls. Install missing controls and repair all
failing controls.
Deficiency: Observed basin and trap bearing wet/dry capacity, not stabilized completely and
allowing bypassing of storm water.
Corrective Action: Ensure proper treatment capacity and function with corrective maintenance.
Unless subsequently amended in writing by this office, it is expected all of these corrective
measures will be completed by.
Re -inspection of this notice to verify corrective measures will incur a $150 for land disturbing under
VESCP and single-family dwelling units (§ 17-207) or a $250 fee for land disturbing under VSMP (§ 17-
208). Failure to take effective corrective measures will result in a Stop Work Order upon re -inspection.
County Inspector Name: Geoff Elsie
County Inspector Phone Number: (434) 296-5832
OF Al.,& Inspection Result: Notice to Comply
r
L�eo��P
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name:
Spring Hill Village - VSMP
Project/WPO Number:
WP0201900042
TMP:
09000000002800
DEQ Permit Number (if
applicable):
VARlON324
Project Operator:
Goodman Excavation
Operator Telephone #:
(540) 872-5105
Project Contact:
LLC SPRING HILL LAND DEVELOPMENT
Contact Telephone #:
Contact E-Mail:
Qualified Personnel (QP):
Gregg Odonnell
Inspector:
Geoff Elsie
Weather (Wet/Dry/Rain):
Sun rain overnight and am
Disturbed Acreage:
Inspection Date & Time:
8/19/2020 10:00:00 AM
Single -Family:
Stage of Construction: Grading
Re -Inspection: No
COVERAGE & POSTING REQUIREMENTS
Compliant?
Reviewed during re -inspection? Yes
Comments/Description
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
Yes
1
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
Yes
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
Yes
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Compliant?
Reviewed during re -inspection? Yes
Comments/Description
4
The SWPPP is on -site or made available during the inspection? (CGP
Yes
Part II D.1 & 2)(9VAC25-870-54.G)
The SWPPP contains a signed copy of the registration statement?
Yes
5
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
Yes
letter and the CGP? (CGP Part II A.1.b & c)
The SWPPP includes a narrative description of the nature of the
Yes
7
construction activity, including the function of the project? (CGP Part II
A.1 A)
The SWPPP includes a legible site plan identifying all appropriate
Yes
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
Page 1 of 5
9
The SWPPP contains the name, phone number and qualifications of
Yes
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
Yes
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11
existing construction site has a stormwater management plan that
Yes
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ II.0 ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
Yes
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
Yes
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14
Delegation of Authority is provided and signed in accordance with Part III
Yes
K? (CGP Part 11 A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
Yes
11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Compliant?
Reviewed during inspection? No
Comments/Description
Is the SWPPP being amended whenever there is a change in the design,
16
construction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870-
54.G)
Has the SWPPP been amended if inspections or investigations by the
17
operator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
identified? (CGP Part 11 B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19
grading activities occur, construction activities temporarily or permanently
cease on a portion of the site or stabilization measures are initiated? (CGP
Part 11 B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part 11 B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22
legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
54.G)
Does the SWPPP identify the date of any prohibited discharges, the
23
volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part 11 B.4(e-f)) (9VAC25-870-54.G)
24
mendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS
Compliant?
Reviewed during inspection? Yes
Comments/Description
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
Yes
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Yes
Part 11 F (3-4)? (CGP Part 11 F (3-4))
Page 2 of 5
27
Corrective actions are taken consistent with the requirements of the
Yes
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? Yes
Comments/Description
28
Have stream buffers and steep slopes been protected as shown on the
N/A
plan?
Sequencing of the project is implemented in accordance with the
Yes
29
approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
Large areas denuded and not stabilized.
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
No
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25-
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
Stockpiles observed to be dormant and not stabilized
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
No
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
N/A
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
Yes
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
No
Bare structures are present at time of inspection.
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.6)
Are sediment traps and basins installed in accordance with MS-6 and the
Observed basin and trap bearing wet/dry capacity, not
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
No
stabilized completely and allowing bypassing of storm
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
water.
Are finished cut and fill slopes adequately stabilized to prevent or correct
No
Observed cut and fill bare.
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
Yes
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
Yes
38
(9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
N/A
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
No
Channels to the basin and trap bare and eroding
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
N/A
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are temporary stream crossings of non -erodible material installed where
N/A
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
43
Is necessary restabilization of in -stream construction complete? (9VAC
N/A
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
Yes
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are soil and mud kept off paved or public roads to minimize the transport
Yes
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Page 3 of 5
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
N/A
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are properties and waterways downstream from development adequately
Observed large sediment deposits that are working
47
protected from erosion, sediment and damage in accordance with the
No
heir way to the downstream properties
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48
Permanent control measures included in the SWPPP are in place?
N/A
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? No
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Page 4 of 5
Page 5 of 5
Construction General Permit Site Inspection Report
Request for Correction Action
Check
Regulatory
Occur.
Observation
Recommended Corrective
List #
Citation/Legal
Action
Requirement*
9
(CGP Part II A.6)
Make sure RLD is updated.
Update records as needed
Should be G. Odonnell, not
S. Carlson or J. Swink
27
(CGP Part II G(1-2))
Make required corrections as
Follow up with identified non -
identified by the inspection
conforming controls. Correct
report from the third party
and record completion
30
(9VAC 25-840-40.1)
Large areas denuded and
Seed and straw mulch any
(9VAC25-870-54.B)
not stabilized.
non active area dorment for
(9VAC25-880-60) (CGP
longer than 7 days. Use
Part I F.1(a)) (CGP Part
temporary seed and straw
11 A.5.b(1)) (CGP Part 11
mulch as identified in the
A.2.c (8)) (CGP 11 E(1-2))
approved plan
31
(9VAC 25-840-40.2)
Stockpiles observed to be
Seed and straw mulch as
(CGP Part II A.2(c))
dormant and not stabilized
required by the VESCH
(9VAC25-870-54.B)
manual and the approved
plan.
34
(9VAC 25-840-40.5)
Bare structures are present
Stabilize as required by the
(CGP Part II A.2(c))
at time of inspection
approved plan
(CGP II E(1-2))
(9VAC25-870-54. B)
36
(9VAC 25-840-40.7)
Observed cut and fill bare.
Stabilize as required by the
(CGP Part 11 A.2(c))
approved plan to reduce the
(CGP 11 E(1-2))
risk of erosion.
(9VAC25-870-54. B)
40
(9VAC 25-840-40.11)
Channels to the basin and
Stabilize as needed to
(CGP Part 11 A.2(c))
trap bare and eroding
prevent scour.
(CGP II E(1-2))
(9VAC25-870-54. B)
47
(9VAC 25-840-40.19(a-
Observed large sediment
Maintain proper care of all
n))
deposits that are working
controls. Install missing
their way to the downstream
controls and repair all failing
properties
controls.
35
(9VAC 25-840-40.6)
Observed basin and trap
Ensure proper treatment
(CGP Part II A.2.c (9))
bearing wet/dry capacity, not
capacity and function with
(CGP Part 11 A.2(c))
stabilized completely and
corrective maintenance.
(CGP 11 E(1-2))
allowing bypassing of storm
(9VAC25-870-54. B)
water.
Recommended 8/28/2020
Corrective Action
Deadline:
Targeted Re- 8/31/2020
Inspection Date:
Comments:
*Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1- 4.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormvater Management Program (VSMP) Regulations(9VAC25-870), or the General Permit for
Discharges of Stormvater from Constructi on Activities (9VAC25-880).
Construction General Permit Site Inspection Photo Log
Photos for Item 2
Photos for Item 4
Photo Dzscription:
Photos for Item 10
Photo Description:
Photos for Item 30
20200818_134824.jpg.jpg 412.55KB
3-
F-
Photo Description: Example of large area not stabilized
Photos for Item 35
20200818_135618.jpg.jpg 447.88KB
Photo Description: Photo shows bypass of sediment, treatment level at point of failure, and overflow
failure due to sediment buildup.
Photos for Item 47
20200818_135528.jpg.jpg 437.18KB
Photo Description: Sediment about to enter existing roadside ditch.
20200818_135534.jpg.jpg
Photo Description: Bypassing occurring
615.02KB
7. /e,
�CAe
County Inspector
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
Inspection Date: 8/19/2020