Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO202000033 Plan - Revision 2020-08-19
VSMP PLAN LEGEND EXISTING NEW DESCRIPTION BOUNDARIES BENCHMARK SITE PROPERTY LINE ADJACENT PROPERTY LINE BUILDING SETBACK F- PARKING SETBACK SITE TEXT 10 10 PARKING COUNT TOPOGRAPHY INDEX CONTOUR - - - - - - - INTERVAL CONTOUR SPOT ELEVATION -r ,1 TOP OF CURB ELEVATION >Z1m� TOP OF WALL ELEVATION [ ,, 1� BOTTOM OF WALL ELEVATION STREAM STREAM BUFFER 100 YEAR FLOODPLAIN BUILDING BUILDING - RETAINING WALL STAIRS EDGE OF PAVEMENT ROAD CENTERLINE FRONT OF CURB BACK OF CURB i I CG-12 TRUNCATED DOME SIDEWALK BIKE PARKING HANDICAP ACCESSIBLE AISLE HANDICAP PARKING MATERIAL CONCRETE RIPRAP 3.. ASPHALT EC-2 MATTING EC-3 MATTING WETLAND TREELINE X X FENCE UTILITY UTILITY POLE m m GUY WIRE oHu OHU OVERHEAD UTILITY ucu UCU UNDERGROUND UTILITY STORM STORM MANHOLE q q DROP INLET STORM SEWER �. ROOF DRAIN SANITARY O SANITARY MANHOLE m� SANITARY SEWER MAIN S S - SANITARY SEWER LATERAL WATER W W WATER LINE O O WATER METER 0 o WATER METER VAULT Mt 1110 FIRE HYDRANT A A FIRE DEPARTMENT CONNECTION GAS GAS GAS LINE EASEMENTS CONSTRUCTION GRADING ACCESS SIGHT DISTANCE UTILITY STORMWATER FACILITY MAINTENANCE STORMWATER ACCESS DRAINAGE SANITARY WATERLINE GASLINE NOTE: 1. THE SIZE OF THE SYMBOLS MAY VARY FROM WHAT IS SHOWN. OWNER/DEVELOPER Malloy Properties III LLC C/O Malloy Companies LLC 2070 Seminole Trail Charlottesville, Virginia 22901 PLAN PREPARATION Shimp Engineering, P.C. 912 East High Street Charlottesville, VA 22903 (434)227-5140 ZONING EC - Entrance Corridor HC - Highway Commercial SP201900011 (awaiting approval) permitting vehicle storage and outdoor sales/storage/display use on the site MAGISTERIAL DISTRICT Rio SOURCE OF TITLE DB 4863 P 467-471 SOURCE OF BOUNDARY AND TOPOGRAPHY Boundary is based on field survey by: Roger W. Ray & Assoc., Inc. Provided on 03/29/2016 Topographic survey with two foot (2') contours provided by: Bell Land Surveys Field Verified by Shimp Engineering staff March 4, 2020. BENCHMARK Datum for topography is NAVD 88 FLOODZONE These parcels do not lie within a FEMA flood zone as defined on FIRM map 51003CO279D, dated February 4, 2005. RESERVOIR WATERSHED This site is not within a watershed of a public water supply. WATER & SANITARY SERVICES This project lies within the ACSA jursidictional area for both water and sewer. No connections to the remaining warehouse are proposed at this time. GENERAL NOTES 1. The information and data shown or indicated with respect to the existing underground utilities at or contiguous to the site are based on information and data furnished to the owner and engineer by the owners of such underground facilities or others. The owner or engineer shall not be responsible for the accuracy or completeness of such information or data. The contractor shall have full responsibility for confirming the accuracy of the data, for locating all underground utilities, for coordination of the work with owners of such underground utilities during construction, for the safety and protection thereof and repairing any damage thereto resulting from the work. All of these conditions shall be met at no additional cost to the owner. The contractor shall contact "Miss Utilities" of Virginia at 1-800-552-7001 prior to the start of work. 2. When working adjacent to existing structures, poles, etc., the contractor shall use whatever methods that are necessary to protect structures from damage. Replacement of damaged structures shall be at the contractor's expense. 3. The contractor shall be responsible for protecting all existing site structures from damage and coordinating work so that the owner can make necessary arrangements to modify/protect existing structures from damages. 4. The contractor shall be responsible for notifying all utility owners, adjacent land owners whose property may be impacted and the Virginia Department of Transportation prior to completing any off -site work. 5. Contractor shall notify and coordinate all work involving existing utilities with utility owners, at least 72 hours prior to the start of construction. 6. Contractor shall immediately report any discrepancies between existing conditions and contract documents to the owner and engineer. 7. Contractor shall submit for the approval of the owner submittals of all specified materials listed in the plans, to include shop PP P P P drawings, manufacturer's specifications and laboratory reports. the owner's approval of submittals will be general and will not relieve the the contractor from the responsibility of adherence to the contract and for any error that may exist. 8. All bare areas shall be scarified, limed, fertilized, seeded and mulched. 9. All trees, saplings, brush, etc. shall be removed from within the right of way and the drainage easements. 10. Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 11. Retaining walls require separate building permits. 12. All water service lines, sanitary laterals, and sprinkler lines must be visually inspected by the Albemarle County Building Department from the main to the structure. LAND USE SCHEDULE EXISTING Area % Building 39,216 SF 43.7% Pavement 36,111 SF 40.2% Sidewalk 0 SF 0% Open Space 14,407 SF 16.1% Total= 89,734 SF (2.06 ac.) PROPOSED Area % Building 9,120 SF 10.2% Pavement 41,363 SF 46.1% Sidewalk 0 SF 0% Open space 39,251 SF 43.7% Total= 89,734 SF (2.06 ac.) COUNTY OF ALBEMARLE Department of Community Development Construction Record Drawings (As -built) for VSMP The following is a list of information required on construction record drawings for stormwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the construction record drawing be prepared by someone other than the designer. Please dig not provide design drawings as construction record drawings. A. A signal and dated professional seal of the preparing engineer or surveyor. B. The name and address of the firm and individual preparing the drawings on the title sheet. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: I. Inspection Records and photographs for pipe trenches and bedding, including underdrains. 2. Video Pipe Inspection for any pipes which are not accessible or viewable. 3. Updated Location with geo-coordinates of all facilities. 4. Vertflc<Drainage1Area maps for the drainagearea treated, and fordratnage to the facilities. 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design_ Corrections may he requited for alterations from the design. 6. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the installed type of drainage structures, culven/pipe size, weirs, materials, inlets or end treatment(s), inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design, provide sealed computations verifying that the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted easements with dead book references labeled. Facilities and drainage must he within platted easements. Provide copies of recorded documents. 11. Guardrail. fences or other safety provisions - Display the constructed location of all safety provisions; fences, guardrail, including the type, length and applied end treatments, compared to design. 12. Material layers - biofilter media, stone layers, sand layers, keyways and cores must be verified as to material types and depths. Include inspection reports, boring or test pit reports and materials certifications. Biofilter media must be an approved state mix. 13. Access roads -show location of access roads, surface treatment, drainage, etc, as applicable. 14. Compaction reports are retiuired to verify fill Compaction in dams. 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. MALLOY FORD WP0202000033 TAX MAP 45, PARCEL 68A TAX MAP 45, PARCEL 112131 ALBEMARLE COUNTY, VIRGINIA VICINITY MAPSCALE : 1"=1000' Ll Um•n.Yy H114, P r� wwnen s•cercenn 0 " © Speedw•y� 3 SrI11w.lY Pn:l•u,�lnfa .j $a Price H,.n" Jim Pr,rs CM1evr•lelo O 9HWhWh9yn6 ROUTE 29 CAD I I'v,,I cnnnbesym•Q Q,ro c r.,e,,.m„„e Alllemxle SPCA ririr, J �` 4,aC' AMF Keyless Lmsv ` Ewc IIDnkrnQ ..h •e.. na lows• Ham•O Improvernenr Aynor Hurl Elnmcmmy S,K K,uym Q ,�racal Sn.nn,M1•r Caleo rli...nl r. V" SHEETINDEX C1 COVER C2 E&SC NARRATIVE C3 EXISTING CONDITIONS C4 E&SC PLAN PH 1 C5 E&SC PLAN PH 2 - SITE LAYOUT CIS E&SC DETAILS C7 SITE DETAILS & PROFILES C8 PRE DEVELOPMENT DRAINAGE MAP C9 POST DEVELOPMENT DRAINAGE MAP IMAGE PROVIDED BY GOOGLE MAPS SHIMP ENGINEERIN G12. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM U a L' . o.45183 w9 1t's+st � ONAL VSMP PLAN MALLOY FORD ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2020.06.08 REVISION: FILE NO. COVER 19.057 C1 PROJECT DESCRIPTION, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION PROJECT DESCRIPTION THIS PROJECT PROPOSES AN ADDITIONAL PARKING LOT AREA FOR STORAGE AND DISPLAY OF VEHICLES IN PLACE OF A DEMOLISHED BUILDING. THE TOTAL AREA OF DISTURBANCE IS 0.91 ACRES. THE PROJECT INVOLVES THE FOLLOWING WORK ACTIVITIES: 1. THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE EROSION AND SEDIMENT PERMITTING REQUIREMENTS AND MAINTAIN ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. 2. INSTALLATION OF PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE PLAN AND DETAILS. 3. GRADING AND PLACEMENT OF FILL SHALL BE IN GENERAL ACCORDANCE WITH THE PLAN. 4. ESTABLISHMENT OF PERMANENT STABILIZATION OF ALL DISTURBED AREAS. ADJACENT PROPERTIES THIS PROPERTY IS BORDERED TO THE NORTH BY BETTER LIVING BUILDING SUPPLY CO.; TO THE EAST BY MALLOY FORD AUTO DEALERSHIP; TO THE SOUTH BY U.S ROUTE 29 SEMINOLE TRAIL; AND TO THE WEST BY VACANT LAND OWNED BY MALLOY PROPERTIES III LLC. OFFSITE AREAS SOIL MAY NEED TO BE IMPORTED FROM THE SITE FROM SITES WHICH SHALL HAVE EROSION CONTROL PERMITS. SOILS THE SITE CONTAINS THE FOLLOWING SOIL TYPES: 27C - ELIOAK LOAM - 7 TO 15% SLOPES, HSG B 88 - UDORTHENTS, LOAMY - 2 TO 25% SLOPES, HSG D 93F - WATT CHANNERY SILT LOAM - 15 TO 25% SLOPES, HSG B CRITICAL AREAS THERE ARE NO CRITICAL AREAS ON SITE. EROSION & SEDIMENT CONTROLS 1. SAFETY FENCE: A PROTECTIVE BARRIER INSTALLED TO PROHIBIT UNDESIRABLE USE OF AN EROSION CONTROL MEASURE. STD. AND SPEC. 3.01. 2. CONSTRUCTION ENTRANCE: INSTALL AND MAINTAIN A CONSTRUCTION ENTRANCE, AS NECESSARY, THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.02 AND CONFORMS WITH THE REQUIREMENTS OF THE EROSION & SEDIMENT CONTROL PLAN. 3. SILT FENCE: INSTALL AND MAINTAIN SILT FENCE THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.05. THIS SILT FENCE SHALL BE INSTALLED AS SHOWN ON THE EROSION & SEDIMENT CONTROL PLAN AND ACCOMPANYING DETAILS FOR THE PURPOSE OF INTERCEPTING SILT -LADEN RUNOFF BEFORE IT IS DISCHARGED FROM THE SITE. THE SILT FENCE SHALL BE INSPECTED AND MAINTAINED TO ENSURE CONTINUED PERFORMANCE. 4. TEMPORARY SEDIMENT TRAP: A SMALL PONDING AREA, FORMED BY CONSTRUCTING AN EARTHEN EMBANKMENT WITH A STONE OUTLET ACROSS A DRAINAGE SWALE, TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS FOR ENOUGH TIME TO ALLOW MOST OF THE SUSPENDED SOLIDS TO SETTLE OUT. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS. STD. AND SPEC. 3.13. 5. TEMPORARY DIVERSION DIKE: A RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING DISTURBED AREA WHICH DIVERTS SEDIMENT -LADEN RUNOFF TO A SEDIMENT TRAPPING STRUCTURE. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS. STD. AND SPEC. 3.09. 6. TEMPORARY SEEDING: TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY OR MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT UNDISTURBED FOR LONGER THAN 30 DAYS. TEMPORARY SEEDING SHALL BE APPLIED IN CONFORMANCE WITH STD. AND SPEC. 3.31. 7. PERMANENT SEEDING: PERMANENT SEEDING SHALL BE APPLIED TO AREAS DELINEATED ON THESE PLANS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. PERMANENT SEEDING STABILIZES DISTURBED AREAS AND ENHANCES THE BEAUTY OF THE SITE. 8. MULCHING: APPLICATION OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO THE SOIL SURFACE TO PREVENT EROSION AND FOSTER THE GROWTH OF VEGETATION. ORGANIC MULCHES (STRAW) HAVE BEEN FOUND TO BE THE MOST EFFECTIVE. 9. DUST CONTROL: CONDUCT DUST CONTROL OPERATIONS NECESSARY TO MET THE REQUIREMENTS OF STD. & SPEC. 3.39 AS REQUIRED TO CONTROL SURFACE AND AIRBORNE MOVEMENT OF DUST. 10.INLET PROTECTION: INLET PROTECTION MEASURES AROUNF THE NEW INLETS SHALL BE PROVIDED IN ACCORDANCE WITH STD: AND SPEC. 3.07. SILT FENCE, STRAW BALES OR TEMPORARY STONE APPLICATIONS SHALL BE APPLIED AS APPROPRIATE FOR CURRENT GRADE CONDITIONS. 11.OUTLET PROTECTION: RIP -RAP SHALL BE PROVIDED AT THE OUTFALL OF CONVEYANCE CHANNELS, CULVERTS, AND STORM SEWERS IN CONFORMANCE WITH STD. AND SPEC. 3.18. OUTLET PROTECTION SHALL BE INSTALLED WITH ACCOMPANYING STORM SEWERS AND SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRED IF NECESSARY. ANT SEDIMENT BUILD UP SHALL BE REMOVED. PERMANENT STABILIZATION AND SEQUENCE OF CONSTRUCTION THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED SEQUENCE OF CONSTRUCTION: PHASE 1 1. INSTALL CONSTRUCTION ENTRANCE. 2. PLACE INLET PROTECTION ON EXISTING DROP INLETS. 3. INSTALL SILT FENCE IN LOCATIONS SHOWN. INSTALLATION OF SOME SILT FENCE REQUIRES REMOVAL OF EXISTING ASPHALT. REMOVE ASPHALT IN SILT FENCE AREAS ONLY AND INSTALL ALL SILT FENCE BEFORE CONTINUING CONSTRUCTION. PHASE 2 1. REMOVE EXISTING BUILDING PAD & ASPHALT WHERE THE PARKING AREA IS IN CUT. LEAVE BUILDING PAD WHERE PARKING AREA IS TO BE FILLED. DO NOT DISTURB THE BUILDING PAD IN THE CENTRAL AREA LABELED AS OUTSIDE THE LIMITS OF DISTURBANCE. 2. REMOVE EXISTING BUILDING PAD & ASPHALT WHERE LANDSCAPING ISLANDS ARE TO BE INSTALLED. ONCE ASPHALT IS REMOVED, PLACE SILT FENCE AS SHOWN ON EASTERN SIDE OF LOT. 3. INSTALL BLANKET MATTING IMMEDIATELY AFTER GRADING SOUTHERN SLOPE WITH BERM. PLACE TEMPORARY SEEDING & EVENTUALLY LOW MAINTENANCE GROUND COVER FOR PERMANENT SLOPE STABILITY. 4. INSTALL DIVERSION DIKE TO SILT FENCE ACROSS NEW ENTRANCE CLOSEST TO ROUTE 29. LEAVE IN PLACE UNTIL SITE IS STABILIZED TO ENSURE SEDIMENT DOES NOT LEAVE THE SITE. 5. UPON INSTALLATION OF NEW STORM PIPES PLACE INLET PROTECTION ON INLETS. 6. KEEP ALL EROSION & SEDIMENT CONTROLS IN PLACE UNTIL SITE IS STABILIZED. 7. CALL FOR FINAL INSPECTIONS. CONSTRUCTION MAINTENANCE THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED AT THE SITE. 1. ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAIN EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE INSPECTIONS SHALL BE CORRECTED AS SOON AS PRACTICABLE. Z THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING, DETERIORATION OR SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF THE HEIGHT OF THE CONTROL, 3. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE REQUIREMENTS SET FORTH IN THE CURRENT EDITION OF THE VIRGINIA SEDIMENT AND EROSION CONTROL MANUAL, OTHER APPLICABLE COMMONWEALTH OF VIRGINIA REGULATIONS AND THE PROJECT SPECIFICATIONS. 4. ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. 5. AREAS WITH RIP -RAP SHOULD BE REGULARLY INSPECTED TO DETERMINE IF HIGH FLOWS HAVE DAMAGED THESE CONTROLS OR CAUSED EXCESSIVE SEDIMENT DEPOSITION. ALL AREAS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS E&S CONTROL PLAN. ENVIRONMENTAL CONTROLS 1. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL MEASURES SO AS TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL LAWS AND REGULATIONS APPLICABLE TO WATER POLLUTION IN WATERS OF THE STATE AND IN INTERSTATE WATERS. 2. CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE USE OF EMISSION CONTROL EQUIPMENT ON CONTRACTOR OPERATED EQUIPMENT, SHUT -DOWN OF MOTORIZED EQUIPMENT WHEN NOT IN USE, AND ACTIVELY CONTROLLING DUST EMISSIONS THROUGHOUT THE PROJECT. EROSION & SEDIMENT CONTROL PERMITTING CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE EROSION AND SEDIMENT CONTROL PERMITS AND MAINTAINING ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. GENERAL NOTES 1. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE EXISTING UNDERGROUND UTILITIES AT OR CONTIGUOUS TO THE SITE ARE BASED ON INFORMATION AND DATA FURNISHED TO THE OWNER AND ENGINEER BY THE OWNERS OF SUCH UNDERGROUND FACILITIES OR OTHERS. THE OWNER OR ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR CONFIRMING THE ACCURACY OF THE DATA, FOR LOCATING ALL UNDERGROUND UTILITIES, FOR COORDINATION OF THE WORK WITH OWNERS OF SUCH UNDERGROUND UTILITIES DURING CONSTRUCTION, FOR THE SAFETY AND PROTECTION THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK. ALL OF THESE CONDITIONS SHALL BE MET AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL CONTACT "MISS UTILITIES" OF VIRGINIA AT 1-800-552-7001 PRIOR TO THE START OF WORK. 2. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, UTILITIES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. ANY DAMAGE CAUSED BY THE CONTRACTOR OR ITS SUBCONTRACTORS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO REPAIR OR REPLACE. THIS EXPENSE IS THE CONTRACTOR'S RESPONSIBILITY. 3. REPLACEMENT OR REPAIR OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SITE STRUCTURES FROM DAMAGE AND COORDINATING WORK SO THAT THE OWNER CAN MAKE NECESSARY ARRANGEMENTS TO MODIFY/PROTECT EXISTING STRUCTURES FROM DAMAGES. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY OWNERS, ADJACENT LAND OWNERS WHOSE PROPERTY MAY BE IMPACTED AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO COMPLETING ANY OFF -SITE WORK. 6. CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING EXISTING UTILITIES WITH UTILITY OWNERS, AT LEAST 72 HOURS PRIOR TO THE START OF CONSTRUCTION. 7. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). 8. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL BOUNDARIES, BUILDINGS, VEGETATION, AND OTHER PERTINENT SITE ELEMENTS. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE OWNER AND ENGINEER. 9. CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER SUBMITTALS OF ALL SPECIFIED MATERIALS LISTED IN THE PLANS, TO INCLUDE SHOP DRAWINGS, MANUFACTURER'S SPECIFICATIONS AND LABORATORY REPORTS, THE OWNER'S APPROVAL OF SUBMITTALS WILL BE GENERAL AND WILL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF ADHERENCE TO THE CONTRACT AND FOR ANY ERROR THAT MAY EXIST. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS, INSPECTIONS, BONDS, AND OTHER RELATED ITEMS IN ACCORDANCE WITH LOCAL AND STATE POLICY. STORMWATER MANAGEMENT NOTES: 1. STORMWATER ON SITE IS ANALYZED AT TWO DIFFERENT POINTS OF OUTLET. THE FIRST POINT OF ANALYSIS IS POA 1, WHERE WATER ON SITE IS COLLECTED IN AN EXISTING STORM STRUCTURE (LABELED Al) AND RELEASED AT A RATE WHICH COMPLIES WITH CHANNEL PROTECTION REQUIREMENTS OF 9VAC25-870-66-8(3) & FLOOD PROTECTION REQUIREMENTS. RUNOFF TO POA 2, ANALYZED AT THE SOUTHEASTERN CORNER OF THE SITE, MEETS CHANNEL & FLOOD PROTECTION REQUIREMENTS AS THE ENERGY BALANCE EQUATION WITH AN IMPROVEMENT FACTOR OF 0.9 IS SATISFIED AND THE POST DEVELOPMENT 10 YR, 24 HR STORM PEAK FLOW RATE IS LESS THAN IN PRE DEVELOPMENT CONDITIONS. NOTE THAT RUNOFF OUTSIDE OF THE LIMITS OF DISTURBANCE WAS INCLUDED IN EACH ANALYSIS, BUT NO IMPROVEMENT FACTOR WAS APPLIED. 2. WATER QUALITY WILL BE ADDRESSED BY PURCHASE OF 0.01 LBS NUTRIENT CREDITS TO MEET THE VRRM REDEVELOPMENT NUTRIENT REMOVAL REQUIREMENTS PER 9VAC25-870-63. MINIMUM STANDARDS (,MS) All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABLIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 14 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2.STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3.PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to survive to inhibit erosion. 4.TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5.STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6.SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfall device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7.CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. & CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. 9.WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. Y 9 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodble material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: a.No more than 500 linear feet of trench may be opened at one time. b.Excavated material shall be placed on the uphill side of trenches c.Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17. CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on t0 a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18.TEMPORARY E&S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19. ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24-hour duration. SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM U a L' ' . o. 45183 �o i�3 Zo w9 .o �`rst�TlAL � VSMP PLAN MALLOY FORD ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2020.06.08 REVISION: 1911111011110161 E&SC NARRATIVE 19.057 C2 i �1< —I o / yG _ y CA O c ' off / CHU _ CHUCHU / CHU— 0 r \ cb f^\ — i \ / T.M 45 -112A A - -4� \\ yG o�\ ALLOY P\PERTICS'all ;�\�' ,' _\ \__ A� s ue - - /'\ -- - --- \ 498 MALLO/Y'COMPA/N\S \ ---\ - // /-- �za 4863 \//4 ` /� /° ,.��\ - , v �--/ -s v � v \ \ _i/ ZONE: S� % j/ //i — / / �_— S S _S cul -/ --494 _ I vIv V�vvv \ � \ I �I I ' I I / vv_------_-l� 490 I \ / \ N_ w / T.M 45-68A \486, \ MALLOY PROPERTIES III C/O / MALLOY PROPERTIES III C/O / c MALLOY COMPANIES LLC \ MALLOY COMPANIES LLC DB 4863 PG 471 ��/ / m h DB 4863 PC 467 \ZONED: HC ZONED: HC " Qo co 3 I \ CURRENT USE: COMMERCIAL ' / CD / cn� �84CURRENT-4JSE- -V/X C-ANT ♦ I. � No o / \ THIS AREA NOT INCLUDED IN LIMITS OF ♦ ' I i 0 (D 0 0 J O !z l DISTURBANCE � / � � � � � � � T. M 45 6 8 C 1 ci/mQ AS NO CHANGE TO LANDUSE COVER & NO ,03 \ MANAGED SLOPES i i DISTURBANCE OF SOIL 8 \ �� I, MALLOY PROPERTIES III C/0 DISTURBANCE FOR ISLANDS ONLY I MALLOY COMPANIES LLC LEAVE EXISTING STONE ELSEWHERE & ♦ / DB 4863 PG 461 BUILD PARKING AREA ON TOP / XISTING 11 1 °; ZONED: HC PARKING AREA 1 I TO BE f I CURRENT USE: COMMERCIAL _ I ♦ REMOVED — ' — --\ 1 — 1 — i 20 0 Graphic Scale: I"— I 80 i 4 �� I -r 1 30,096 SF BUILDING Pon h� I —1 \ PORTION TO BE REMgWED, j PORTION TO REMAIN --& BE I \ N1� BUILT UP KJ / I \ 1 \ \747 mXISTING TREES TB ♦♦ I II \ Q� \ _ J _ fl — \ — — O _ z ♦--- — I O 1 S11 \\ _ — cn _ O v, z --- - A o I \ +� D c.) 468-------------- - - --zT 1 \ - - U cnZF - ---466----------\ -- o I \ - \ �7 s s —s —s —s s —s —s s s ems\ s —s z, cn CHU CHU— CHU CHU — CHU — CHU— CHU — OHU CHU — CHU OHU J — —464— _ EX. CONIC SIDEWALK TBR - - XI TING AVE PAWING REA TO B REM VE — — ' i — CHU — OH U\ _ HU CHU CHU U ( I I \ \ i �cnm \ \\ NG o u' \ N � \ z OHU — OHU DUI CHU CHU — CHU 9H I/ i � o z < 0 CHU CHU— � CHU CHU 0 d1 W 6-6 OH HII 0NU \ H `— OHU,— _ W OkU --0HU- - OHU �OFRl-� OHU._ I 20 40 60 SHIMP ENGINEERING2. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM a L' . o. 45183 -►l�lzD�w4 O��`sSIONAL �NG VSMP PLAN MALLOY FORD ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2020.06.08 REVISION: FILE NO. 19.057 EXISTING CONDITIONS SEQUENCE OF CONSTRUCTION - PHASE 1 � o � 1. INSTALL CONSTRUCTION ENTRANCE. o o m 2. PLACE INLET PROTECTION ON EXISTING DROP INLETS. z 3. INSTALL SILT FENCE IN LOCATIONS SHOWN. INSTALLATION OF SOME SILT FENCE REQUIRES _ REMOVAL OF EXISTING ASPHALT. REMOVE ASPHALT IN SILT FENCE AREAS ONLY AND INSTALL m w ALL SILT FENCE BEFORE CONTINUING CONSTRUCTION. 502-—U OHU c ' CH / CH _ / / CHU CHU— G � .S (04 iX-�� / \v oy Q70 ������� T.M 45 --112A ONO -. ALLOY PR.CPERTIES`�,11I Y�;���'/� -s i —� 98-- MALLO/Y'COMPA/NIS A4863,A/4 / ' F A \�� -- ' --s �s \\ \ �i� ZONEZ: / j� / / —__ S �S \ C v� _ - — —494 _ Co n C-14 \ / v I vj Q0 A PORTION OF BUILDING TO REMAIN UNDISTURBED �. I I] II I I 490 v 488 ♦ I IP � - _- \ / Lvv`i_ w TV. T5 v / MALLOY PROPERTIES III C/O / //C o� MALLOY COMPANIES LLC \�/ IJI ti°\•` 71'b ' I mDB 4863 PG 471 0D° h ZONED: HC co A' CURRENT- -VXCANT�84 co I N ♦ p p THIS AREA NOT INCLUDED IN LIMITS OF ♦ I i 0 0 J DISTURBANCE t �I� / CD T. M 45 6 8 C 1 qw�e I AS NO CHANGE TO LANDUSE COVER & NO , 00 ? \ MANAGED SLOPES II``�/�� I 1 1 DISTURBANCE OF SOIL 1, SF ��� I MALLOY PROPERTIES III C/O 8 I �a ' 1 DISTURBANCE FOR ISLANDS ONLY MALLOY COMPANIES LLC 1I LEAVE EXISTING STONE ELSEWHERE & ♦ DB 4863 PO 461 / I I BUILD PARKING AREA ON TOP j 1 PARKING AREA 1 �- I ° ZONED: HC I TO BE ' CURRENT USE: COMMERCIAL - - _ _ ` - _ I .1 REMOVED I \ - fk�� I 1 1 Li INSTALL SILT N I MEDIATELY AFTER-, 1 1 / ASPHALT S R M D IN THIS AREA i 480 ' / 30,096 SF BUILDING Pon I r — \ PORTION TO BE REMgWED, I _ j PORTION TO REMAIN --& BE BUILT UP KJ 0 FTI � lot XISTING TREES TB ♦� I III Q� 476 �o m �1 Ld o D >` z cs cn z r� - I L o I \ ` \ \ \ M -1 �' D -� -- s�=1-<------- 468------ --_ A- - � - INSTALL SILT FENCE IMMEDIATELY AFTE / \ --466- -- ---- ASPHALT IS REMOVED IN THIS AREA-\ SF --------- ZF '7 \ ��- lb XI TING PAVE PAR ING REA TO B REM VE - - v V \ — x — — —s —s s s —s — — - s s —s —s —s s —s —s s s s\ �z� GHU CHU— CHU CHU — CHU CHU— CHU — CHU CHU — CHU OHU HU CHU OH U� _ HU OHU CHU U r- — J - - -464- — — — — — — — — — — — — — — — — — — — --- 77 — OHtl-_BFNt� OHU— OHU U OHU OHU— OHU I �C-�m \ C o cn \ oK zz N \ \ i z < - -0 - - OHU OHU CHU— 0 — OHU OHU 0 SOIL EROSION & SEDIMENT CONTROL SYMBOLS SYMBOL NO. TITLE KEY 3.02 CONSTRUCTION ENTRANCE CE X X 3.05 SILT FENCE SF 3.07 INLET PROTECTION IP 3.09 TEMPORARY DIVERSION DIKE ®D �--►� 3.12 TEMPORARY DIVERSION 3.31 TEMPORARY SEEDING TS �--�—� 3.32 PERMANENT SEEDING 3.35 MULCH �-�--� 3.39 DUST CONTROL ®C - - LIMITS OF DISTURBANCE • • 20 40 •• Graphic• H ONU -- OkU -�1HU - - GHU OH IJ 0HU._ SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM U ? TLM'..45183 O��rSIONAL ECG VSMP PLAN MALLOY FORD ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2020.06.08 REVISION: I911:1►[•] E&SC PLAN PH 1 19.057 C41 cl� // SEQUENCE OF CONSTRUCTION -PHASE 2 1. REMOVE EXISTING BUILDING PAD & ASPHALT WHERE THE PARKING AREA IS IN CUT. LEAVE oy� i — — — — — n� BUILDING PAD WHERE PARKING AREA IS TO BE FILLED. // 2. REMOVE EXISTING BUILDING PAD & ASPHALT WHERE LANDSCAPING ISLANDS ARE TO BE oy ,' i I INSTALLED. ONCE ASPHALT IS REMOVED, PLACE SILT FENCE AS SHOWN ON EASTERN SIDE OF o� \ , . . , v� ✓ � LOT. 3. INSTALL BLANKET MATTING IMMEDIATELY AFTER GRADING SOUTHERN SLOPE WITH BERM. PLACE TEMPORARY SEEDING & EVENTUALLY LOW MAINTENANCE GROUND COVER FOR PERMANENT SLOPE STABILITY. ��ti 4. INSTALL DIVERSION DIKE TO SILT FENCE ACROSS NEW ENTRANCE CLOSEST TO ROUTE 29. 502- — , ° / �' ! I I LEAVE IN PLACE UNTIL SITE IS STABILIZED TO ENSURE SEDIMENT DOES NOT LEAVE THE SITE. 5. UPON INSTALLATION OF NEW STORM PIPES PLACE INLET PROTECTION ON INLETS. CHU_OHu / / / ��/ / V 6. KEEP ALL EROSION & SEDIMENT CONTROLS IN PLACE UNTIL SITE IS STABILIZED. °" OHU — OHU — ° / ' / ,'( \ 7. CALL FOR FINAL INSPECTIONS. � � Y /� � �\ y / SOIL EROSION & SEDIMENT CONTROL SYMBOLS SYMBOL NO. TITLE KEY i / i ✓ y \ — \ I I I CAI �� \ �r-I-il v /------- — II ! FFE 468,50 I J / I 490 ►' \ �z I ' / \'00, — 488 \ w I v 48 — / / C�. I I cn� �84--- ---- l �o CE �� c I w ♦ 8 V —� I � � I ♦ I I I I I W \ iw o r \ I 00 00 \\ MANAGED SLOPES/I� ` I 7 D 1 \----- ✓� — — X 1 I � - s I 1 ❑ — — — — — — — — --� ` S TS " I r I I 1 480 I I I 1 1 1 1 THIS AREA NOT INC L DIED It LIMIT OF DISTURE ANCE 60 I S NO CHANGE DISTL TO LA RBANC DUSE OF S OVER IL & NO ♦ ♦ I h 1 DISTUR ANCE FOR ISLANDS 3NLY LEAVE EXISTING STONE ELSE ERE & BUI PARKI 4G AREA ON OP 0 40 ♦ ♦ 686 y�DI-3 C�P ° 1 I X I U / SF I I I I / I J 3.02 CONSTRUCTION ENTRANCE CE X X 3.05 SILT FENCE SF ® 3.07 INLET PROTECTION IP 3.09 TEMPORARY DIVERSION DIKE ®D 3.12 TEMPORARY DIVERSION �--►� --� 3.31 TEMPORARY SEEDING TS �--�—� 3.32 PERMANENT SEEDING �S 3.35 MULCH �-�--� 3.39 DUST CONTROL ®C - - LIMITS OF DISTURBANCE 20 40 60 SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM � p a L' . o. 45183 o SlnArAT. �tyG z -_1 I a 69 68 6 �D1� INSTALL BLANKET MATTING & SEED IMMEDIATELY AFTER GRADING SLOPE 682 LOW MAINTENANCE GROUND COVER TO BE �♦ / �'� ° II \ �� 18INSTALLED ON ALL SLOPES 3:1 OR STEEPER i Q ° \ \ \ — — — _ VSMP PLAN 476 � \ \, \ — —�v_ Az v v y MALLOY FORD ------------� 6984 I / �P Tao 689z 1 — — _ r DI- p�s» ----472 e _—_ ' ALBEMARLE COUNTY, VIRGINIA r I — 30— — — 4 ° f \\\ \\\ \I \ \ SUBMISSION: -470 6 X X 66 P \\\ D 2020.06.08 SE EXTRA STRENGTH FABRIC AND STAKE I I \ \ — \ \ \ REVISION: — — — — — 69 1 00 1 POSTS MAXIMUM 3 FT APART FOR SILT 1 B > 1 sX MP, 'UN oN� A \ \ \ 00 — — —468- — — — — — — — — — — — ` — ` x 1 FENCE RECEIVING CONCENTRATED FLOW 8 (T RAVEL DIAPHRAGM 011 EX. MH FIE D FIED Y JUSSTINWAS — — — � —� — — X 6 � �qzs/2o \ \ 685 _ \ _---DD —466— -- — — — _ — _ — \ 685 6 6800 I mIt \\ \ \ _ � x v x >< — x — FILE N0. \ 5 — --_ _-------------------- J,2 °° ° \ \ 19.057 r �\ C CD \ I 7U \ �y° _ — E&SC PLAN PH 2 - \ \ Z n z < — \ �'_ SITE LAYOUT \ _ IH OHU OHU OHU OHU — OHU — OHU — OHU — OHU CHU — CHU OHU U OHL OHU� � HU OHU OHU U HIJ OHU— o _ — - — —464— _ — — _ _ _ _ _ n OHll— DHW DU OHU— OHUDHU DH ��. DHU OHU OHU OHU \ °�-0 QHI,L�-�IiltH`-0f�U0 qFN OHNI J _ u OH OHU \ \ w— U.—.onuorau -DHu. joriu \\ W oy L — C Do 5 _ a STONE 70' MIN. CONSTRUCTION ACCESS 3" SM-2A ASPHALT TOP COURSE 2% 2% MIN. 2'A AGGREGATc BASE PROFILE STONE • V" CONSTRUCTION ASPHALT PAVED ACCESS } rO �WASHRACK 2% 2% IIIIIIIIII2% 12' MIN.* t *MUST EXTEND FULL WIDTH LQ �POSITIVE DRAINAGE TO SEDIMENT OF INGRESS AND EGRESS OPERATION TRAPPING DEVICE PLAN 2' MIN, F EXISTING PAVEMENT SITIVE DRAINAGE SEDIMENT 4PPING DEVICE FILTER CLOTH) -�- SECTION A -A A nrilmuimt water tap of 1 inch must be installed with a mininituu 1 inch balleocic shutoff vahre supph ins a wash hose with a diameter of 1.5 inches for adequate constant pressure. Wash water must be carried away from the entrance to an approved settlfi g area to remove se(liulent. All sechunent shall be prevented from Clltet711P 5101111 (il'all1R, ditchesor ll Oel colu'ses. PAVED WASH RACK NO SCALE )PAVED CONSTRUCTION ENTRANCE & C6 JNot To Scale TABLE 3.31-C TEMPORARY SEEDING PLANT MATERIALS, SEEDING RATES, AND DATES SEEDIN e N G RATE NORTH° SOUTHb PLANT 3/1 5/I gll5 2/I5 5l1 9/1 SPECIES CHARACTERISTICS Acre IOW flr m m m m tom 4130 8I15 Illl 0/30 9/1 11/15 OATS 3 bu. (up m 100Ibs., 216a. X - - X - - Use sp,ivg vuieties (x. g.. Noble). (Avev sstiw) n«bm Wry 50lbe.) RYE° 2 6u. (up m I ILO Ibv., 2.5 Ibs. X - X % - X U. for hm fdl smdings, winar ( le cemalel v« less Ouv SO lbs.) cove. Tolerztw will zvd low moiema. GERMAN MILLEC 50Ibe. zpprox. I lb. - % - - % - Wzm.�eevzon zmoal. Dies ,u firt (Stladg iW iul 6ozc May be zdded io wormer miz®. ANNUAL RYEGRASS` fi01hs. 11A Ibs. X - % X % M.,be added ie mun. Will W( lium multi-Rrnum) mow aW of move eaode. WEEPING 15 IM. 5'4 on. - X - - X - Wzrm-re+no p"moisL M1LY LAVEGRASS buv h. Tolmtes b«, dry zlopm (Ezzemmiz cuzvWsl and acid, infmtile roils. Mzy be zdded io mix®. KOREAN ]5 lbs. qp,v. 14. X % - X X - Wzrm worn emud legwm. LESPEDEZA` Ibs. Tolman acid soils. Ma, be ( s[iwlaml tided to mix«. ° Northam Piedmont and Mountain region. See Plates 3.22-1 and 3.22-2. b Southern Piedmont and coastal Plain. ° May be used as a cover crop with spring seeding. d May be used as a rover crop with fall seeding. X May be planted betwcen these dates. - May ppI be planted between these dales. 2 VEMPORARY SEEDING ;6 Not To Scale 1.5 SILT FENCE DROP INLET PROTECTION 2 X 4' WOOD FRAME STAKE DROP INLET PERSPECTIVE VIEWS ELEVATION OF STAKE AND FABRIC ORIENTATION SPECIFIC APPLICATION I I' MIN. lllll DETAIL A THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA (SLOPE NO GREATER THAN 5%) WHERE THE INLET SHEET OR OVERLAND FLOWS (NOT EXCEEDING 1 C.F.S.) ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS, SUCH AS IN STREET OR HIGHWAY MEDIANS. s 11NLET PROTECTION (IP C6) Not To Scale GRAVEL CURB INLET SEDIMENT FIL TER GRAVEL FILTER * —� �512"" RUNOFF WATER SEDIMENT CONCRETE GUTTER SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. * GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE INLET PROTECTION (IP Not To Scale PERMANENT SEEDING SPECIFICATIONS February 16 through April 30: Kentucky 31 Fescue — 128 Ibs/acre; Red Top Grass — 2 Ibs/acre; Annual Rye — 20 Ib's/acre. May 1 through August 15: Kentucky 31 Fescue — 128 Ibs/acre; Red Top Grass — 2 Ibs/acre; Foxtail Millet — 20 Ibs/acre. August 16 through October 31: Kentucky 31 Fescue — 128 Ibs/acre; Red Top Grass — 2 Ibs/acre; Annual Rye — 20 Ibs/acre. November 1 through February 15: Kentucky 31 Fescue — 128 Ibs/acre; Red Top Grass — 2 Ibs/acre; Winter Rye — 20 Ibs/acre. MULCHING SPECIFICATIONS: Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with mulch blower or by hand. LIME AND FERTILIZER SPECIFICATIONS: Lime and fertilizer needs should be determined by soil tests. Soil tests may be preformed by the Cooperative Extension Service Soil Testing Laboratory at VPI&SU, or by a reputable commercial laboratory. Information concerning the State Soil Testing Laboratory is available from CITY Extension Agents. Under unusual conditions where it is not possible to obtain a soil test, the following soil amendments will be applied: For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 1,000 Ibs. per acre of 10-20-10 (10 Ibs. per 1,000 square feet) or equivalent. For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 600 lbs. per acre of 10-20-10 (10 Ids. per 1,000 square feet) or equivalent. LOW MAINTENANCE GROUND COVER: SOUTHEAST NATIVE GRASS SEED MIX (AMERICAN MEADOWS INC.) For slopes steeper than 3:1 grade, Mix the following seeds at 30 Ibs/acre each, along with EC-2 Matting: Virginia Wildrye (Elymus virginicus), Little Bluestein Grass (Schizachyrium scoparium), Purpletop (Tridens flavus), Broomsedge (Andropogon virginicus), and Indian Grass (Sorghostrum nutons). 5 )PERMANENT SEEDING (PS C6 Not To Scale pacted Soil 18" min. 4.5' min. 6 :) DIVERSION DIKE (DD C6 Not To Scale <—FIL o w TYPICAL INSTALLATION AT END OF PIPE r MAY BE WITH STANDARD STONE AT OUTLET 3' OVERLAP BETWEEN ROLLS *TRANSVERSE CLOSED CHECK SLOT TRANSVERSE CHECK SLOT TO BE CONSTRUCTED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATION FOR PREFERRED INSTALLATION. *TRANSVERSE OPEN CHECK SLOT STAKING DETAIL — Hr 3" OVERLAP EC-3 STAKES OR PINS 3' O.C. SLOT 25' O.C. s'-D" NOTES: t 2 1. STAKES SHALL BE WOOD OR METAL AS RECOMMENDED BY THE MANUFACTURER AND SHALL BE A MINIMUM OF 12" IN LENGTH. IN SANDY SOILS METAL STAKES A MINIMUM OF %" IN LENGTH SHALL BE USED. 2. SOIL STABILIZATION MAT TYPE A AND B ARE TO BE IN ACCORDANCE WITH THE APPROVED PRODUCTS LIST. 3. SOIL STABILIZATION MAT SHOULD BE INSTALLED TO THE SHOULDER BREAK P(XNT OR EXISTING GROUND THEN EMBEDDED 6". MATERIAL ON BOTH SIDES OF THE DITCH SHALL BE INSTALLED TO THE SAVE ELEVATIONS. 4. IF MORE THAN 3 LINES OF MATERIAL ARE REWIRED PARALLEL TO THE q OF THE DITCH, MATERIAL SHALL BE INSTALLED PERPENDICULAR TO THE CENTER LINE OF THE DITCH, STARTING AT THE LOWEST q ELEVATION OF THE DITCH. 5. FOR SOURCES OF APPROVED MATERIALS SEE VDOT'S APPROVED PRODUCTS LIST FOR ST'D. EC-3, UPSTREAM AND DOWNSTREAM TERMINAL TYPE A OR B. SPECIFICATION SOIL STABILIZATION MAT �VDOT REFERENCE ROAD AND BRIDGE STANDARDS DITCH INSTALLATION TYPE A ORB 244 REVISION DATE SHEET 1 OF 3 605 VIRGINIA DEPARTMENT OF TRANSPORTATION 113.03 SOIL STABILIZATION MAT DETAIL C6 J Not To Scale 1. SET THE STAKES. 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 2. EXCAVATE A 4°X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. NO 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. 1-00 FLOW SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) SILT FENCE (SF) Not to Scale SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM / L'"o. 45183 �SSIONAI+ �' VSMP PLAN MALLOY FORD ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2020.06.08 REVISION: E&SC DETAILS 19.057 C6 1 2016 ROAD & BRIDGE STANDARDS I PB 1 NO PROJECTION OF PIPE ABOVE GROUND LINE TOP OF FILL TOP OF FILL TOP OF FILL GROUND LINE i - GROUND LINE s -- GROUND LINE x - - rrrrir rr r q r r r rrrrr rrrr - „ r rr rrr - rrrrr rrrr - -lip rr ri EARTH rrr rr + -lip ROCK rr rr + - 0 EARTH + C N a w UNYIELDING saL o I. 0 o BEDDING - MATERIAL 3' y MN.1/10 D X D X BEDDING MIN. D X D X BEDDING MIN. 1/10 D _ MATERIAL MATERIAL X D X M2R. BERMAX. 26" FOUNDATION SOFT, YIELDING. OR NORMAL EARTH FOUNDATION ROCK FOUNDATION I OTHERWISE UNSUITABLE MATERIAL PIPE PROJECTION ABOVE GROUND LINE MIN. 1.5 x D MIN. 1.5 x D MIN. 1.5 x D MN. 1.5 x D MIN. 1.5 x 0 MIN. 1.5 x 0 TOP OF FILL TOP OF FILL TOP OF FILL x - rirrirrrriirr rrrrirrrrrrrrr = - {;•;};•r • rrrrrr rrrrrrr ; _ - rrrrrr, rrirrrr ;, •,; •::.. _ -_ rrrrr rrrrr . - 'rrr - {�;; rrrrr rrrr .; "�:• - rrrrrrrrrrrrr rrrrrrrrrrrrr - iY � rrrr ; - p = • rrrr rrr ';'r,'r'�ri � � ' - = riirrrrrrrr rrrrrrrrrir GROUND + •' rr rr • • r" ,; GROUND = rrrrrrrrrr rrrrrrrrrr LINE r y;�•���?;; p ?,{;; LINE + = r/r/rrrrr d .rrrirNr _GROUND -LINE H d. EARTH I xt ROCK OR MIN. 1/10 0 _ UNYIELDING / - MN. 1/13 D a BEDDING EARTH MN. 1/ID 0 X D X BEDDING MATERIAL Vx" PER - - SOIL I. OF H X D % MIN. 8", BEDDING MATERIAL MAX. 24" MATERIAL FOUNDATION SOFT, YIELDING, OR NORMAL EARTH FOUNDATION ROCK FOUNDATION OTHERWISE UNSUITABLE MATERIAL ®BEDDING IN ACCORDANCE WITH SECTION 302ERIAL OF THE ROAD D BRIDGE ® EMBANKMENT NOTES: SPECIFICATIONS. ��. ++7 REGULAR BACKFILL MATERIAL IN ACCORDANCE FOR GENERAL NOTES ON PIPE BEDDING. CLASS I BACKFILL MATERIAL IN ACCORDANCE I:::::1 SEE INSTALLATION OF PIPE CULVERTS WITH SECTION 302 OF THE ROAD D BRIDGE NOTES WITH SECTION 302 OF THE ROAD AND BRIDGE SPECIFICATIONS. AND STORM SEWERS GENERAL SPECIFICATIONS. ON SHEET 107.00. rrrrr FOR PLASTIC PIPE rrrrr FOR ALL OTHER PIPE REGULAR BACKFILL MATERIAL CRUSHED GLASS CONFORMING TO THE IN ACCORDANCE WITH SECTION 302 OF THE ROAD 6" MINIMM CLASS I BACKFILL MATERIAL PLACED DIRECTLY AND BRIDGE SPECIFICATIONSSIZE REQUIREMENTS FOR CRUSHER RUN . OVER PIPE AND 6" REGULAR BACKFILL MATERIAL, AGGREGATE SIZE 25 AND 26 MAY BE OR 12" OF CLASS I BACK FILL MATERIAL. USED IN PLACE OF CLASS I BACKFILL. IN ACCORDANCE WITH SECTION 302 OF THE ROAD AND BRIDGE SPECIFICATIONS. `VID= IL NTR L OFFICE INSTALL. OF PIPE CULVERTS AND STORM SEWERS SPECIFICATION REFERENCE ROAD MID BRIDGE STANDARDS CIRC. PIPE BEDDING AND BACKFILL - METHOD ''A'' 3D2 SHEET 1 OF 4 REVISION DATE 07119 VIRGINIA DEPARTMENT OF TRANSPORTATION 303 f07.07 I 2016 KOAU & BRIUGE SrANUAKUS I IS-1 SHAPE TO ELEVATION OF MID -POINT OF LARGEST PIPE. SHAPE TO G: CONTOUR I �G • .11 OF PIPE I`ulllll I I r i /r .� • 9 SLOPE DRAIN TO INVERT T PIPE OF OUTLET SECTION A -A PIPANSITION E DIAMETERS WHEN METHOD OF TREATMENT IN DROP INLETS DIFFERENT SIZES OF PIPES ARE ENCOUNTERED. /e /// /(✓/� NOTES: SHAPING OF MANHOLE AND INLET INVERTS IN ACCORDANCE WITH THIS DRAWING IS TO APPLY TO THOSE STRUCTURES SPECIFIED ON PLANS OR WERE INVERT OF PIPE IS ABOVE INVERT OF \ SLOPE TO DRAIN TO INVERT OF STRUCTURE. OUTLET PIPE MANHOLE OR DROP INLET IS TO BE FORMED AND CONSTRUCTED N ACCORDANCE WITH APPLICABLE STANDARD OR SPECIAL DRAWING. THE INVERT SHAPING AS DETAILED HEREON IS TO CONSIST OF A PORTLAND CEMENT CONCRETE MIX CONFORMING TO CLASS A3 OR CLASS C1, EXCEPT THAT 25X OF COARSE AGGREGATE MAY BE / .".'•,• '" '• UP TO 4" IN DIAMETER AND CONSIST OF STONE, BROKEN BRICK, • •�'+ , �,•; BROKEN CONCRETE OR BROKEN CONCRETE BLOCK. THE SURFACE �•:�:: �S.;i.;., .n.,,•. SHALL BE LEFT SMOOTH BY MEANS OF HAND TROWELLING. NONE . OF THE COARSE AGGREGATE SHALL REMAIN EXPOSED. 4 •. ' DETAILS OF INVERT SHAPING AS SHOWN HEREON ARE FOR EXAMPLE - 4 PURPOSES ONLY. EACH MANHOLE OR DROP INLET IS TO BE SHAPED INDIVIDUALLY TO TO BEST FIT THE PARTICULAR INLET AND OUTLET CONFIGURATION AND FLOW LINES. SECTION B-B PLAN METHOD OF TREATMENT IN MANHOLES STANDARD METHOD OF SHAPING SPECIFICATION NCE REFERE,] ROAD AND BRIDGE MANHOLE & INLET INVERTS SHEET 1 OF 1 REVISION DATE VIRGINIA DEPARTMENT OF TRANSPORTATION 302 106.08 DI-3A, 3B, 3C EXPANSION KEYED FOR DETAILS OF INLET EXPANSION JOINT 3'-10" FRAME & COVER JOINT BACK OF SIDEWALK x CONST. 3, BARS ,,, APPROACH JOINT GUTTER SEE STANDARD IC-2. I� ., Ep BAR G GUTTER BARS G 4„ „ 2" W Vdl mT BARS C 5 BARS B & r BAR C : I SUBBASE - 2 _ _ __ HARDWARE ARS F CLOTH I � 6 z + AIRS F I WEEP HOLE. - w o SEE NOTE 8 / 8" V . D n HT I I W •STEPS.ISE o II II BAR F BAR A NOTE 5 iv II II ARS D FACE OF CURB GUTTER 8 8 CR K CONTROL JOINT CRACK CONTROL JOINT 2'•0" PLAN 3'-0" SECTION A -A s,MIN. ' MI IAA 10 MAX' KEYED CONST. JOINT - L-VARIABLE MAX. 20' 8 2,•6•• 8•• 3•_O•• 10 1 2" CUTTER iv �B APPROACH BARS A GUTTER _ _ _ _ _ _ _ ' r as p'. -• B S G I BARS F BARS E LAB iv • m I 4k3" DIAMETER BARS E WEEP HOLE FRONT ELEVATION BARS B a" ,•-s•' a'• BARS F (GUTTER REMOVED) 11/4" 3'-0" s" 5X'/4" BENT PLATE = SECTION B-B ..: I/4" R ' •• TYPE A NOSE DETAIL SHALL BE USED WITH CG-3 & CG-7 •• STANDARDS. v L2V2"X2'/2/4"x'" TYPE B NOSE DETAIL SHALL BE USED WITH CG-2 & CG-6 GALVANIZED STANDARDS. TYPE A TYPE B Vi' X 4" STUD SHEAR CONNECTOR WELDED GALVANIZED PLATE FOR TYPE A TO BE BENT ON AN ANGLE OF 68.30' TO ANGLE IRON AT 2'C-C. CONNECTORS AND IS TO BE ANCHORED WITH V2" X 4" STUD SHEAR NOSE DETAILS WELDED TO BENT PLATE AT 2'C-C. 2„ APPR. PAVEMENT DI-3A L -, DI-313 L DI-3C L . WARPED PAVEMENT � � I FLOW FLOW I� I FLOW DETAIL WHEN USED FOR USE ON GRADES ADJACENT TO CURB FOR USE IN SAGS WITHOUT GUTTER BOTH SIDES TO BE SYMMETRICAL XV DOT STANDARD CURB DROP INLET SPECIFICATION REFERENCE ROAD AND BRIDGE STANDARDS 12" - 30" PIPE: MAXIMUM DEPTH (H) • 8' 233 SHEET 1 OF 2 REVISION DATE 08/10 VIRGINIA DEPARTMENT OF TRANSPORTATION 302 104.09 HALF PLAN VIEW SEE STANDARAD SL-1 FOR APPLICABILITY OF SAFETY SLABS. B STANDARD MH-1 NOTE* FRAME & COVER THE TOP OF MASONRY IS TO BE LEFT SUFFICIENTLY LOW TO PERMIT PROPER ADJUSTMENT OF COVER AND FRAME TO GRADE BY THE USE OF MORTAR OR BRICK AS DIRECTED BY THE ENGINEER. FLAT SLAB TOP AS DETAILED ON STANDARD T-MH-2 MAY BY SUBSTITUTED FOR TAPERED SECTION WHEN APPROVED BY THE ENGINEER. CONCRETE -- FOOTING DIAMETER = 4'-8"+ (2 x WALL THICKNESS) SECTION B-B BRICK CONCRETE OR CONCRETE BLOCK HALF SECTION A -A (WITH FRAME AND COVER REMOVED) BRICK CONCRETE 45' TABLE OF QUANTITIES DEPTH BRICK MANHOLE CONCRETE MANHOLE BRICK I CONCRETE CONCRETE FEET THOUSANDS CU. YARDS CU. YARDS 4 0.5 0.785 1.437 5 0.7 0.785 1.699 6 0.9 0.785 1.961 7 1.0 0.785 2.223 8 1.2 0.785 2.485 9 1.4 0.785 2.747 10 1.6 0.785 3.009 11 1.9 0.970 3.455 12 2.2 0.970 3.817 13 2.5 0.970 4.179 14 2.8 0.970 4.541 15 3.1 0.970 4.903 16 3.4 0.970 5.265 17 4.0 1.173 6.032 INCREMENT 0.45 - 0.582 SPECIFICATION REFERENCE MANHOLE FOR 12" - 48" PIPE CULVERTS 302 VIRGINIA DEPARTMENT OF TRANSPORTATION LD-204 Stormwater Inlet Computations Sag Inlets Only 9 E L rn C a o- C a°) a > N °- > 4) o. E O U E t 1 ° 0 m to X c N c ° ~ O U O C c75c l0 M O 2 x a) 2 a _ CL �2 2 U) U U it U C7 a a 2i (7 a- (D U 6 � 1 2 3 4 5 6 8 9 10 11 12 13 14 15 21 22 23 24 (ft) (ac) (in/hr) (cfs) (CIS) (CIS) ( ft/ ft) ( ft/ ft) (ft/ ft) (ft) (ft) (ft) A4 DI-3C 8 0.23 0.82 0.19 6.5 1.23 - 1.230 0.013 0.018 0.028 0.15 0.50 0.29 5.88 0.82 0.19 4.0 0.76 - 0.757 0.013 0.12 0.50 0.24 4.26 A2 DI-313 8 0.59 0.75 0.45 6.5 2.90 - 2.901 0.013 0.027 0.018 0.080 0.23 0.50 0.46 5.77 0.75 0.45 4.0 1.79 - 1.785 0.013 0.17 0.50 0.33 2.28 Al DI-7 0.58 0.87 0.50 6.5 3.28 3.278 0.013 0.024 0.014 1 0.15 0.50 0.31 11.00 0.87 1 0.50 1 4.0 1 2.02 1 2.017 1 0.013 1 1 0.13 0.50 0.26 9.20 LD-229 Storm Drain Design Computations Malloy Ford From Point To Point Catch A (ac) Runoff Coef Inc AC Accum AC Tot TC (min) Tot Int(10yr) (in/hr) Tot Flow(10yr)(cfs) Up Inv El Dn Inv El Pipe Len (ft) Inv S % Pipe Dim (in) Pipe Cap (cfs) Velocity (ft/S) Flow time Inc (min) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 A4 A3 0.23 0.23 0.05 0.05 5.00 7.10 0.38 463.65 462.68 42.25 2.3% 15 11 4.1 0.17 A3 A2 0.38 462.48 461.81 29.05 2.3% 15 11 4.1 0.12 A2 Al 0.59 0.59 0.35 0.41 5.00 7.10 2.88 461.61 460.60 44.81 2.3% 15 10 7.2 0.10 MH-Y B NOTES: 1. QUANTITIES SHOWN ARE FOR MANHOLE WITHOUT PIPES. THE AMOUNT DISPLACED BY PIPES MUST BE DEDUCTED TO OBTAIN TRUE QUANTITIES. 2. A BASE THICKNESS OF 9" WAS USED IN COMPUTING CONCRETE QUANTITIES. 3.INCREMENTS TO BE ADDED FOR EACH ADDITIONAL FOOT OF DEPTH. 4. MATERIALS MAY BE BRICK, CONCRETE OR APPROVED CONCRETE MANHOLE BLOCK. 5. IF BLOCKS ARE USED THE MINIMUM THICKNESS OF SAME IS TO BE 5". OTHER THICKNESSES ARE TO CONFORM TO WALL THICKNESS SHOWN FOR CONCRETE. 6. ALL CONCRETE TO BE CLASS A3. 7. WHEN SPECIFIED ON PLANS THE INVERT IS TO BE SHAPED IN ACCORDANCE WITH STANDARD II THE COST OF FURNISHING AND PLACING ALL MATERIALS INCIDENTAL TO THE SHAPING IS TO BE INCLUDED IN THE BID PRICE FOR THE STRUCTURE. XV DOT ROAD AND BRIDGE STANDARDS REVISION DATE SHEET 1 OF 3 04/20 106.01 47lW LL A2 A3 rn O ^moo + 2 m. '} + Cil-ao �4 R.OP-GRADE z a z z o N. - -- - - „.304 - 29.05LF - 15 ��.M. 42.25_F 15" HDPE. ,. - - � -INISTAI o 2.3 , m� S z o z o > z STEEL PLATE o m m . c hrn aaaa zzzz zzzz a z» ooaa SUS ro� M 1 STORM PIPE PROFILE Al-A4 C7 HORZ: 1 "=20' VERT: 1"=10' z 11+➢0 475 470 465 460 111415 ST-1 • NO. 6 GALVANIZED STEEL STEP #4, GRADE 60, REINFORCING ROD ENCASED IN MATERIALSION APPROEVED BY THE ENGI EER.THER A1I2 lAt�V7\O c�E (DIMENSION MAY VARY WITH MANUFACTURER'S DESIGN) CORROSION RESISTANT MATERIAL T7#4 REINFORCING ROD TYPICAL SECTION ti SreA4j4• N k�Th 4j I " ••:•.:• NOTES' STEPS WILL BE REQUIRED IN ALL STRUCTURES WITH A DEPTH OF 4'-0" OR GREATER UNLESS OTHERWISE NOTED ON THE PLANS. • Va„ R • �•'• ' 4/2 - `= ALL STEPS SHALL PROTRUDE 4V2" FROM INSIDE FACE OF STRUCTURE WALL. MAXIMUM STEP SPACING TO BE 16" C-C. STEPS SHAL} WITHSTAND A MINIMUM FORCE OF 300 POUNDS WHEN EXTENDED 4/2" FROM THE FACE OF THE SUPPORT. TYPICAL SECTION (DIMENSIONS MAN NUFFACTUREMAY VARY WITH MADESIGN) ' STEPS ARE TO BE VERTICALLY ALIGNED AND UNIFORMALY SPACED FOR THE ENTIRE DEPTH OF ANY STRUCTURE. IN PRECAST UNITS STEPS MAY BE CAST IN PLACE, MORTARED INTO HOLES PROVIDED BY THE FABRICATOR, OR DRIVEN. RIF MINIMUM OF 3" EMBEDMENT STEPS DIFFERING IN DIMENSIONS, CONFIGURATION OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PRDIIDED THEY MEET THE MINIMUM REQUIREMENTS SHOWN HEREON AND THE CONTRACTOR HAS FURNISHED THE ENGINEER WITH DETAILS AND CERTIFIED TEST REPORTS OF THE PROPOSED SUBSTITUTE AND HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE OF SUCH STEPS. q ALL STEPS INSTALLED SHALL BE PROVIDED WITH SLIP -RESISTANT SURFACES SUCH AS BUT NOT LIMITED TO, CORRUGATED KNURLED, OR DIMPLED SURFACES. 4i'• Miit, ��L `'��P CAE ALUMINUM STEPS SHALL BE FABRICATED IN ACCORDANCE WITH ASTM 8221, ALLOY 6005-T5. THAT UNIFORMLY OATEDON OF TWITH HE TAPBTUMMOUS, MASONRY ENCASED IN SOLVENT TYPE. ASBESTOS FILLED ALUMINUM SPECIFICATION TC CIGOMEENTEEDD COATING CONFORMING TO FEDERAL ALUMINUM STEP SPECIFICATION REFERENCE STANDARD STEP ROAD AND BRIDGE STANDARDS VIRGINIA DEPARTMENT OF TRANSPORTATION REVISION DATE SHEET 1 OF 1 106.09 SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM / Lj"o.45183 �0 7h w� �`rs'IOTfAL Btr' VSMP PLAN MALLOY FORD ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2020.06.08 REVISION: 19.057 SITE DETAILS & PROFILES C7 - - 502 LEGEND k �/� — k k AREA WITHIN T.M 45� 12A/ / /°8�.' ' --- --- --- / / �/ ------ Al LOD 498--� -MALLOY PR9PERTIES C /.0 /°���� �/ __------- --- __ --- -_///� - - - - k MALLO/Y COMPA/NIE/S LO / / �q,L _--�/ /� �\ `� TO OA 4863 G/4 1// / / ��0 /�x �/ AREA OUTSIDE LODI / — — \ AREA TO PDA 2 I l i I I I \\\\ \\ � J OUTSIDE LOD --494 -k \ ------ / \- \ AREA TO POA 1 - v A INSIDE LOD \ \ DRAINAGE DI E & LODv RAINAGE \QIVIDE AREA TO PDA 2 INSIDE LOD I I AREA TO POA 1 \ 490� �__ i I OUTSIDE LOD & ONLY DRAINAGE DIVIDE & LOD \ _ / INCLUDED IN INLET \ I / CALCULATION, LCULA E IO SOOD T — � k PROTECTION \� \ / \486, T._ M 45-�-1-2131 / MALLOY PROPERTIES III C/0 v MALLOY COMPANIES LLC v DB 4863 PG 471 SHIMP ���zoNED: He ! k Ik ENGINEERING / 84 C U R R E N � �-J SE , l X-OAN T I I I/ \ LAND PLANNING - PROJECT MANAGEMENT THIS AREA NOT INCLUDED I k \ .227.5140 SITS OF DISTURBAN E _\ I/ T.M 45 68C1 912ROTTE. HIGH ST. 434ING.COM CHARLOTTESVILLE VA, 22902 JUSTIN(rrlSHIMP-ENGINEERING.COM \ I� k S NO CHANGE T0� MALLOY PROPERTIES C/0 8 DISTURBANCEEORF& N0 k MALLOY COMPANIES LLC �` \ DE 4863 PG 461 k THIS A EA NOT' INCLUDED O ZONED: HC ti / C ANNEL ORLQQD I- CURRENT USE: COMMERCIAL PRO ECTION ANALYST \ k O k 4f IUSED FOR INLET 480 ARE 0 POA 2 \ k k CALCULATI NS-ONLY �- k. 476 A- - — — — — ——— — — — - — — — — — — — v A 472-------- -----0 O y Y k k \ \ \ O —470 ---468------------------_- i-ham I a ]�>• �-�->� III �, � �� ----- ---466 - - - -- - - k --Al z � 00 traphic Scale: 1°=20' a L'. o.A5 3 -►l�lzD�w4 O��`sSIONAL �NG VSMP PLAN MALLOY FORD ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2020.06.08 REVISION: 2020.07.30 1911=[67 PRE DEVELOPMENT DRAINAGE MAP 19.057 DRAINAGE AREA SUMMARY o / / / c / o _oH / oHu—OHu \ °ycc ,oirk 98 — / 494 ` DRAINAGE DI E & LODE vv _ RAINAGE DIVIDE FFE 468.50 � I — J / 490 DRAINAGE DIVIDE & LOD FZZ — \ � I , 488 _ I X k -_ I . r I 7V 95 486 AREA TO POA 1� 0� �B _ �; h NOT INCLU ob D Ibb v —_ I � j � 1S--AREA N\ � 815 � o I ITS OF DISTURBA - AS NO CHANGE TO \ A 8 I7o \ LANDUSE COVER & NO \ \ \ x DISTURBANCE OF SOIL THISOINCLUDED INDRAI.-E C EL O\ AN :Ej:) k k PRO EC ION ANALYSE - \ \ L _ / US D FOR .INLET 480 \ ( C L LATIONS ONLY J WITHIN LOD OUTSIDE LOD PREDEV POSTDEV PDA Area (ac) CN Area (ac) CN 1 0.663 91 0.669 88 2 0.2561 83 0.2441 81 PREDEV POSTDEV POA Area (ac) CN Area (ac) CN 1 0.3811 981 0.3811 98 2 01 1 0.0071 98 ICHANNEL & FLOOD PROTECTION SUMMARY POA Q1 ALLOWABLE (CFS) Q1 PROPOSED (CFS) Q10 PRE Q10 POST 11 4.031 3.791 7.91 7.71 21 0.691 0.611 1.621 1.53 I ` k \ 1 6 7036 ��41 69 U -�T$1� 4 V k or -4--r- Lj 60 \ - 7018 _`' ----- _ _ x sD _ x L Ll 67 k 6�9- 1 -----472---------------------__ goo 1�,0 \ k — —468- u \ ----68 LEGEND AREA WITHIN LOD TOTAL 0.91 AC AREA TO PDA 1 OUTSIDE LOD AREA TO POA 2 OUTSIDE LOD AREA TO POA 1 INSIDE LOD AREA TO PDA 2 INSIDE LOD AREA TO POA 1 OUTSIDE LOD & ONLY INCLUDED IN INLET CALCULATIONS, NOT CHANNEL/FLOOD PROTECTION TOTAL 0.39 AC *ALL TIME OF CONCENTRATIONS ASSUMED 5 MINUTES SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM � a L" . o. 45183 -►l�lzD�w4 O��`sSIONAL �NG VSMP PLAN MALLOY FORD ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2020.06.08 REVISION: 2020.07.30 58 5 6 y _----466------------` 1 AREA 0 P 'A 2 / �68 � — - - - - - _�- --_ FILE N0. b2 6 -Be° 68'0" 6 19.057 X - POST DEVELOPMENT A- ��� --- -_ DRAINAGE MAP -� 0 2 \F 60 z z — Graphic Scale: 1"=20' (/) — (nCIOOHU w �� OHUGHU OHU—OHU— �.n�. �. - --— -- y—--i— -C9 -