Andrew Allison, PE, Timmons Group — 608 Preston Ave, Suite 200,
Charlottesville, VA 22903 [ Andrew.allison(a(�timmons.coml
Owner or rep.:
Historic Hotels of Albemarle, LLC, 701 Club Drive, Keswick, VA 22947
Plan received date:
14 Jan 2020
(Rev. 1)
3 Apr 2020
(Rev. 2)
20 Aug 2020
Date of comments:
11 Feb 2020
(Rev. 1)
7 May 2020
(Rev. 2)
25 Aug 2020
Reviewer:
John Anderson
Project Coordinator: Tori Kanellopoulos
SDP2020-00002
1.
L3.10, Tree Planting Plan: Please show C5.1 (Grading Spot Shots Plan) storm lines as light linework (no
need to show elevations, or grade) on L3.10 to evaluate for landscape conflicts. Trees should not occupy
private drainage corridors, or be shown within 5' of private storm drain centerline (CL). For pipes within
public drainage easements (i.e., downstream of SWM facilities), trees may not be located within public
drainage easements. Understory plants should be located > 5' from CL of public drainage easements.
Locating plants within a public drainage easement carries risk (plant removal /loss). Please ref. deed of
dedication of public drainage easement for proscriptive language. Review areas circled in blue, below.
(Rev. 1) Addressed. As ollaw-W: See Planning comment, d. 4/28/20: `2. [18-4.11] Structures and
easements: REV 2: Proposed tree near end of parking area appears to be conflicting with proposed
waterline.' Image illustrates comment #2: Please resolve WL-landscape conflict for plant circled in
orange, image below. (Rev. 2) Addressed.
Avoid waterline - landscaping conflict.
Engineering Review Comments
Page 2 of 4
L3.10 - storm pipe /landscaping conflicts addressed. [ Images removed with Rev. 2 review comments.]
C5.0 - storm pipe /landscaping conflicts addressed. [ Images removed with Rev. 2 review comments. ]
2. Please consider and respond to VSMP /WPO Amendment review comments, d. 15 Jan 2020. Note: A
closer reading of 17-603.C., and definition of water-dependentfacility (17-205) indicates that storm sewer
is authorized in a stream buffer, meaning: 1) mitigation of stream buffer impact associated with storm pipe
is not required, and 2) storm pipe may be located within the 50-streamward feet of a stream buffer. Please
Engineering Review Comments
Page 3 of 4
disregard 15 Jan 2020 Engineering plan review comment 7 which does not accurately state requirements.
(Rev. 1) Addressed. Applicant response: `Outfall has been revised to ensure that pipe and riprap are
contained within the first 50' of the buffer.'
Water -dependent facility. The term "water -dependent facility" means a development that cannot exist
outside of the stream buffer and must be located on the shoreline because of the intrinsic nature of its
operation and which include, but are not limited to: (i) the intake and outfall structures of power plants,
sewage treatment plants, water treatment plants, and storm sewers; (ii) public water -oriented recreation
areas; and (iii) boat docks and ramps.
3. C6.2, LD-347: Please review inlets 118, 120, 122, 126. Check pipe dia. v. outlet water surface elevation,
and revise to ensure non -pressurized flow within capacity of pipe. (Increase pipe diameter, as needed.)
(Rev. 1) Addressed. As follow-up: Please review C6.2 content since virtually no information displays.
Engineering checked initial comment against WPO201800078 to confirm addressed, but C6.2 Minor Site
Plan Amendment should include data shown on C6.2 included with WPO201800078 Plan, Amendment 1.
(LD-229, LD-347 tables (include tables on Site Plan Amendment), pre- /post -developed CN reduction data
(option: may include or remove all VRRM.xls data /text).) (Rev. 2) Addressed.
4. C6.6: Show existing public drainage and SWM facility easements. Provide label ref to deed bk.-pg., Ex.
easements: 5198/669-670). Note: Submit easement plat consistent with SDP2020-00002, W0O201800078
Amendment, and plat at deed bk.-pg 5198/669-670. Note: storm lines below SWM facilities require a
public drainage easement. (Rev. 1) Partially addressed. Applicant response: `Existing public drainage
easements have been added.' As follow-up: Please submit easement plat with application consistent with
WPO Amendment 1. Note: storm lines below SWM facilities require a public drainage easement.
Applicant response to WPO201800078 Amendment 1, item # 12: `Timmons Group is currently working to
amend the previously recorded easement plat. Plat submission to follow soon.' Asfollow-up: See Planning
comment, 4/28/20: `1. [18-32.7.4.2 and 18-32.7.5.3] Easement Plats: An easement plat is required for the
proposed SWM facilities management easement. An easement plat was previously approved for this
easement, however the dimensions and design have changed. Comment persists.' As follow-up to Planning
comment 41: Provide bk.-pg. reference label to recorded new easement plat on C6.6 (similar to label for
Ex, easements, see b€igw) [ Image removed with Rev. 2 review comments. ] to ensure easement is
recorded. Approved WPO 201800078 Amendment 1 permits grading consistent with the Approved
amended WPO Plan —recording new public drainage and (revised) SWM Facility easements (plat)
corresponding with WPO201800078 Amendment 1 is essential. Easement plat application:
httl)://www.albemarle.org/ul)load/images/forms center/departments/Community Development/forms/application
s/Easement Plat & Checklist. Vdf (Rev. 2) Partially addressed. As ollow-up: Easement plat recorded Aug 14,
2020. Please provide deed bk.-pg. reference to recorded easements on C6.6. Drainage deed recorded at bk.-pg.
5368/613; SWM facility deed + plat at bk.-pg. 5368/603.
5. Provide defined storm conveyance and typ. detail for ditch /swale on east side of downslope access to Spa.
Proposed grading creates runoff conveyance at blue -circled location, image, below. (Rev. 1) Addressed.
[ Image removed with Rev. 2 review comments.]
6. Recommend bypass for SWM3 should infrequent event overwhelm the underground facility, or obstruction
at weir plate prevent SWM3 design discharge via storm pipe 109. A possible option: locate a relief pipe
that connects SWM3 with Str. 108, image, below. [ Image removed with Rev. 2 review comments.] (Rev.
1) Withdrawn, not accepted. Applicant response: `Acknowledged on proposed solution. The installation
of a bypass impacts routing numbers and overall water quantity measures. It is our preference to leave the
system as proposed to keep the overall system as efficient as possible':
7. C4.0: Revise 3' sidewalk to 5' width, Min. (Rev. 1) Comment persists. Applicant response: `Sidewalks
have been revised to 5' minimum. Sidewalk from the eastern parking facility to the building has been
shown as 4' to match VSMP comment #6.' VSMP request for 4' Min, width was in error. Although VSMP
/WPO 201800078 Amendment 1 is approved (5/6/20) without request to revise walk width to 5', the initial
review comment on Minor Site Plan Amendment is consistent with ordinance and review guidelines.
Please revise 4' sidewalk to 5' width (no need to revise VSMP /WPO) and send .PDF of C4.0 and C6.2 for
preview against Engineering items 3, 7 / Planning #2. Engineering will recommend Minor Amendment
approval once .PDFs reviewed, pending easement plat recordation (Planning # 1, Engineering item 4).
Engineering Review Comments
Page 4 of 4
(Engineering anticipates Minor Amendment will be combined with VSMP /WPO plan sheets as a
construction plan set, that this set will indicate all walks > 5' wide. ESC inspectors do not evaluate walk
width. There should be no issue if WPO201800078 shows 4' sidewalk. We received a digital WPO plan,
have requested 2 print copies of the WPO plan, have uploaded approved WPO Amendment 1 to CV, and
anticipate no issues during construction if construction plans show 5' walk width. I regret review error.)
(Rev. 2) Addressed.
C0.0: Recommend title sheet include ref. to SDP2020-00002. (Rev. 1) Addressed.
Please feel free to call if any questions: 434.296-5832—x3069\
Thank you