Here you go.
Thanks
From: Alexander Morrison <amorrison@serviceauthority.org>
Sent: Monday, December 9, 2019 11:43 AM
To: Dustin Greene <DGreene@roudabush.com>
Cc: Jim Taggart <1Taggart@roudabush.com>; Frank Pohl <fpohl@albemarle.org>
Subject: RE: Whittington Phase A
Dustin,
It was a pleasure speaking with you.
Phase A has been dedicated and Phase B dedication is underway.
I have CC'ed Frank Pohl so he can see my response. I have reviewed the exhibit and take no exception. The ACSA has
previously allowed these items to be installed over our utilities to provide emergency access for the fire department. No
additional paperwork is required and you have the ACSA's approval. Once finalized, please send 1 full size copy of the
exhibit with a PE stamp and signature so I can add it to the as -built file for Phase A.
Thanks.
Alexander J. Morrison, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434-977-4511 Ext. 116
(C) 434-981-5577
(F)434-979-0698
�O
From: Dustin Greene <DGreene@roudabush.com>
Sent: Monday, December 09, 2019 10:51 AM
To: Alexander Morrison<amorrison@serviceauthoritv.org>
Cc: Jim Taggart <JTagsart@roudabush.com>
Subject: Whittington Phase A
Alex,
It's been awhile. I hope you are doing well. Finally broke that nasty 15 year streak! We are trying to get the
roads accepted by VDOT in Phase A and the cul-de-sac was not large enough to support the turning radius of a fire
truck. We can provide a VDOT hammerhead, turnaround if we can provide gravel, grass pavers on top of your sanitary
sewer easement. I know that the ACSA doesn't like anything on top of their easements but I have had success with
notes saying that the ACSA will not be responsible for the replacement of gravel or grass pavers if excavation within the
easement is required. We are trying to make this happen on the as-builts and not an amendment. I'll give you a call
later today to discuss as David Robinson is no longer with Roudabush and I am trying to see where we are with AC5A
utility as -built approvals for Phase A and B.
Best Regards,
Ix>tmu\nttvlcnit. Dustin Greene, EIT
Project Manager I Roudabush, Gale & Assoc. INC. Engineering
(office):(434) 977-0205 Ext 106
(mobile): (415) 420-8238
www.roudabush.com
dareene@roudabush.com
172 South Pantops Dr.
Charlottesville, VA 22911
IMPORTANT: The contents of this email and any attachments are confidential. It is strictly forbidden to share any part of this message with
any third party, without a written consent of the sender. If you received this message by mistake, please reply to this message and follow
with its deletion, so that we can ensure such a mistake does not occur in the future.