Loading...
HomeMy WebLinkAboutSDP202000025 Action Letter 2020-08-28� OF A� J 9� O y U ��BGtN�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 August 28, 2020 Daniel Hyer, PE Line + Grade 113 01 Street NE, Suite 100 Charlottesville, VA 22902 Airport Road Sheetz - Initial Site Plan Daniel Hyer: The Agent for the Board of Supervisors hereby grants administrative conditional approval to the above referenced site plan. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of the final site plan. In accordance with Chapter 18 Section 32.4.2.8 Early or Mass Grading may be permitted after the following approvals are received: 1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. 2. Approval of all easements for facilities for stormwater management and drainage control. 3. Submittal of a tree conservation checklist with areas for tree preservation identified. The final site plan will not be considered to have been officially submitted until the following items are received: 1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code. 2. A final site plan fee of $1,613 & a Fire Rescue fee of $100. Please submit 2 full size paper copy and a digital version of the final plans to the Community Development Department (follow the digital submission process). The assigned Lead Reviewer will then distribute the plans to all reviewing agencies. Once you receive the first set of comments on the final site plan, please work with each reviewer individually to satisfy their requirements. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the attached conditions from the following agencies/reviewers have been obtained: Albemarle County Planning Services (Planner) - 1 copies [Paty Satemye ext. 32501 Albemarle County Planning Services (ARB) - 1 copies [Kris Taggart ext. 3278] [Comments pending] Albemarle County Engineering Services (Engineer) - [John Anderson ext. 3069] Albemarle County Information Services (E911) - [Brian Becker ext. 3031] Albemarle County Building inspections — [Michael Dellinger ext. 3228] Albemarle County Department of Fire Rescue - [Shawn Maddox 434-326-2623] Albemarle County Service Authority (ACSA) - [Richard Nelson 434-977-4511] Rivanna Water and Sewer Authority [Dyon Vega 434-977-2970 ext. 170] Virginia Department of Transportation - [Adam Moore 434-422-9894] Virginia Department of Health [Alan Mazurowski 434-972-4306] Please note that ARB conditions of approval are still pending and will be forwarded to you when available. The final site plan submittal will be allowed prior to receiving the ARB conditions of approval with the requirement that the final site plan will not be approved until the ARB Certificate of Appropriateness is granted. If you have any questions about these conditions or the submittal requirements please feel free to contact me at Extension 3250, psatemye@albemarle.org. Sincerely, Paty Saternye Senior Planner CC: Airport Auto Investments, LLC 600 E. Water Street, Suite H Charlottesville, VA 22902 William Scott Marshall & Rachel K. Marshall Rev. Trust 1791 Airport Road Charlottesville, VA 22911 �� of ALB O `� �rRGIN�A County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Memorandum To: Daniel Hyer, PE From: Paty Saternye, Senior Planner Division: Planning Date: May 7, 2020 UPDATE: August 28, 2020 Subiect: SDP202000025 Airport Road Sheetz — Initial Site Plan Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Comments to be addressed prior to the Initial Site Plan approval: 1. Pay the required notices fee of $435.00. UPDATE: Comment addressed. Fee was paid on August 27, 2020. Comments to be addressed with the Final Site Plan submission: 2. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code. 3. [32.5.2(a)] General information. Revise the following: a) Include the name of all owners on the site plan cover sheet, under project summary. The owners of TMP 32-39 and TMP 32-39A are not listed as they appear in the County's GIS system. b) Revise the parcel information for TMP 32-39 to include the Steep Slopes — Managed overlay district information. Also, revise the site plan to show the managed slopes information. The area of managed slopes in this parcel appears to be very small and crossing the western property line. c) Revise the site plan to include the parcel information for TMP 32-39A in the plan views, any where the information for TMP 32-38 and TMP 32-39 is shown. d) Revise the scale on sheet X3.0. It does not appear to match the scale of the shared access agreement graphic. e) Revise the cover sheet to include the "Source of Survey" or revise "Source of Topography" to state both survey and topography if they are the same source. f) Revise the Sheet Check List Table and/or sheet C-500 to have consistent information for sheet number and name. g) Revise the owner and zoning district for TMP 32-40. GIS shows this parcel as being zoned Highway Commercial and the owner as Airport Auto Investments, LLC. h) Revise the zoning information to list the approved proffer for the veterinary office and hospital for TMP 32-38. i) This site plan is based upon a boundary line adjustment. Therefore, address the following: a. A boundary line adjustment plat must be submitted (separate application, fee and submission) and approved prior to the approval of the final site plan. b. The plat at the back of the site plan should be removed prior to final site plan submission. c. The final site plan must show all of the required information and not refer to a plat that is a separate document. d. The final site plan should show the existing parcels but also show the proposed BLA parcels. 4. 132.5.1(c), 32.5.2(a), & 4.201 Revise the setback in to address the following: Revise the setback description and linework to fully, consistently and correctly specify the setback requirements. Address the following: a) Include a label for all setback lines on all sheets. b) Revise the labels for the front setbacks to specify they are for both the building and the parking. c) Revise the front setback to include the wording about when the sidewalk is outside of the ROW. d) Add a label to the site plan that shows that the zoning district division line is the western parcel line for TW 32- 39. The adjoining property (TW 32-40) is zoned HC. 5. [32.5.2(h)] F000dplain and related information. Revise the plan to include a floodplain note. 6. 132.5.20), (k) & (1)]] Existing sewer and drainage facilities; Private & public easements; Existing and proposed utilities. Address the following: a) Offsite easements will be required, provide their location and dimension. This includes a stormwater easement for the outfall pipe in the northeast comer of the site, leading to the TW 32-39B pond. b) See engineering comments in reference to required storm drainage easements and modification that will be required. c) Revise the site plan to show any existing or proposed waterline easements. In the southwest comer, where the water meters are proposed, no easements are shown or labeled for water. d) On the western parcel boundary line there is an existing storm pipe that crosses the property boundary. Show all existing or proposed easements for this pipe and the associated grates the rights of all involved are not already covered by the VDOT drainage easement. e) An easement plat must be submitted (separate application, fee and submission) and approved prior to the approval of the final site plan. f) Include the abandonment of any easement in the proposed easement plat. g) A proposed gas line easement is shown. An easement plat will be required. Work with gas provider to establish this easement. 7. 132.5.2(m) & 32.5.2.(i)] Ingress and egress; Streets, easements and travehvays. Address the following: a) An offsite easement is required for ingress egress, a temporary construction easement and a permanent access easement. b) Revise the plan to show that the access easement, on sheet X3.0, is either new or existing. If it is existing include the deed book and page number for the easement plat and deed. c) Ensure that the deed for the access easement included maintenance agreement details. d) An easement plat must be submitted (separate application, fee and submission) and approved prior to the approval of the final site plan. e) Ensure that the deed for the access easement, submitted with the plat, includes maintenance agreement details that meet the Counties minimum requirements. 8. [32.5.2(n)] Existing and proposed improvements. Address the following: a) See engineering comments in reference to pedestrian access from the pumps to the store. b) Revise the plan to include a detail for the screening fence. c) Revise the plan to show the bottom of wall elevation for the retaining wall and label the maximum height of the retaining wall. d) Revise the plan to include a detail for the dumpster enclosure. e) Revise the plan to address the following in reference to parking: i. See engineering comments on parking conflicts and required dimensions. ii. Revise the legend for areas within the building. The different hatches can not be differentiated from each other, both in the legend and in the building layout. iii. The parking calculation (32.5.2(b)) does not incorporate 824 SF of the building and the inclusion of an "office" use does not appear appropriate for the facility. It appears that the office area is an integral portion of the other uses and not a separate use. Utilizing the "Restaurant" and the "Food Store" calculation, both of which are based on Gross Floor Area (GFA), encompasses all areas of the building and all uses that are proposed. If the bathrooms are incorporated into the "restaurant" part of the calculations it generates 1.531 SF or Restaurant use and 4,546 SF of Food Store use. This generates a total required parking of 43 spaces. This allows some flexibility to address some of engineering concerns. a. Restaurant-- 1,531 at 13 spaces/1,000 SF GFA (1,531/1,000=1.53xl3=19.9) b. Food Store= 4,546 at 1 space/200 SF GFA (4,546/200=22.73) f) See engineering comments on loading areas. g) Show all street/accessway signage on the plan, ensure it is shown on the layout and landscaping sheets, and ensure there are no conflicts with landscaping. h) Revise the plan to include the proposed paving material types for all walks, parking lots and driveways. This information should include sections for each of those items. i) There are what appear to be walls on either side of the pedestrian ramp to Airport Road that are shown on the Landscape Plan but not shown on the other sheets. If is it a wall, show it on all other sheets and ensure it is labeled with top -of -wall, bottom -of -wall, and maximum wall height on the grading sheets. If it is not a wall, clarify what is being shown in the Landscape Plan. A railing should also be shown on the other sheets, labeled, and a detail of the railing would need to be included in the site plan. UPDATE: Comment appears to no longer be required. The walls specified were not shown on the 3/17/2020 landscape plan. 9. 132.5.2.(e), 32.5.2.(p) & 32.6.2(j)] Landscape plan. A landscape plan is required in the final site plan that complies with section 32.7.9. A landscape plan was submitted but requires additional information for the final site plan. Such information should include, but is not limited to, the following: a) The calculation for the required tree canopy does not appear to be correct. The coversheet shows the site as 102,514 SF and the calculation lists the Gross Site Area as only 67,665 SF. The canopy is based on the whole parcel, not a portion of it. Revise the calculation and ensure sufficient tree canopy is provided to meet the requirement. UPDATE: Comment not vet fully addressed. Although the SF of "provided" canopy area was revised and increased to 14,772 the "required" calculation was not updated. The comment above is in reference to the "required" SF of canopy. Address the following: i. Revise the "required" canopy calculation. ii. Ensure "provided" percentage is still correct. It was not revised when the 'provide" area was increased. iii. Ensure that the "provided" canopy meets or exceeds the "required" canopy. b) Do not utilize trees provided for street trees in the count for the parking lot trees. Additional parking lot trees are required. c) Revise the landscape schedule to include the canopy of each tree, the total canopy for that type of tree (canopy x quantity) and then tally the quantity of canopy provided at the bottom of the schedule. Although the amount of canopy "provided" is in the Landscape Compliance Chart there is nothing in the landscape plan showing how the provided 9,242 SF of canopy was generated. UPDATE: Comment addressed. d) Provide the calculations for planting beds in the parking area being the equivalent area of 5% of paved and vehicular circulation area, 1 large or medium shade tree per 10 parking spaces and ensure that the minimum requirements are met. UPDATE: Comment addressed. Update these items if the SF of area or provided tree count changes. e) Provide the required shrubs between the parking spaces and Airport Road in the area of the HC ramp. Some shrubs could be provided at the lot side of the ramp and some could be provided at the roadside. f) Ensure area that utilized to meet the interior parking landscaping bed requirement is planted with landscaping, not just one tree in a much larger area, and is around the parking. The hatched island at the comer of the building could be changed to a planting bed and provide additional area. Do not claim areas not adjacent to parking, especially when it is above the required amount. g) Include in the site plan a filled out, signed and dated conservation checklist. h) Include in the existing conditions, grading and landscape sheets tree protection fencing around all existing trees that are to remain and include tree protection fencing details in the site plan. 10. 132.5.2(n) & 32.6.2(k)] Outdoor lighting. In reference to the photometric plan address the following: a) Revise the Photometric Plan so that for the full length of both right of ways the Footcandles do not exceed 0.5. There are at least four portions of the parcel line that show values above what is allowed. b) Revise the Luminaire Schedule to have LLF value for all fixtures and update the table accordingly. c) Revise the Luminaire Schedule to have values for the total lamp lumens. d) Ensure that the all product manufacturer cutsheets are provided in the site plan and include pictures or details that allow determination that they are "full cut off'. 11. [32.5.2(r)] Symbols and abbreviations. Revise the site plan to include a legend for the line types used in the plan. 12. [Comment] ARB comments are not available at this time. Because of COVIDI9's impact on public meetings the ARB comments will be provided when they become available. The final site plan approval will not be granted until ARB has approved the site plan. 13. [Comment] See the SRC comments from most of the reviewers attached. All SRC reviewer comments must be sufficiently address prior to final site plan approval. 14. UPDATE: [NEW COMMENTI The final site plan will not be approved until an APB Certificate of Appropriateness has been granted. Additional revisions have been made to the site layout, based upon ARB comments, that have not been shown on the version of the initial site plan (see note top of "UPDATE" comments) being reviewed. ARB review of the Initial Site Plan has not been finalized/completed, revisions to the site plan to meet ARB comments have been made since the site plan submission date, and additional revisions may be required. Additional discussion and review of the site plan is on the agenda for the 9/21/2020 ARB meeting. Any revisions to the site plan from the original submission date to meet ARB requirements will be reviewed by all reviewers during the final site plan review process. Please contact Paty Saternye in the Planning Division by using psaternve(rDalbemarle.org or 434-296-5832 ext. 3250 for further information. COUNTY OFALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 Phone (434) 296-5832 Fax (434) 972-4126 July 7, 2020 Valerie Long, Esquire Williams Mullen 321 E Main Street, Ste 400 Charlottesville, VA 22902 RE: ARB-2020-39 and ARB-2020-46: Sheetz Initial Site Plan and Architectural Review (TMP 03200-00-00-03800) Dear Ms. Long, The Albemarle County Architectural Review Board, at its meeting on Monday, July 6, 2020, held a work session on Sheetz Site Layout. The ARB had the following comments: 1. The general relative orientation of the canopy, building, car wash and dumpster are acceptable as shown in the "Revisions to Original" drawing updated 6/29/20. 2. The applicant should resubmit the Initial Site Plan for full ARB review with updated color renderings that show views from the Entrance Corridor streets and with the changes discussed during the work session, as follows: a. Consider reducing the canopy to 6 double -stacked dispensers or find another way to reduce the canopy length. b. Reverse the slope of the canopy or consider a flat canopy. c. Shift the store building to the south to align with the canopy and to make the store building more prominent than the car wash. The ARB anticipated being able to recommend approval of the Initial Site Plan with the changes discussed during the meeting. The ARB's recommendation on the revised submittal is needed for the lead planner to take further action on the Initial Site Plan. Please submit your revised drawings for continued ARB review at your earliest convenience. Note that this will be considered a resubmittal under ARB-2020-39. Include the attached "Revised Application Submittal" form to ensure proper tracking and distribution. Applications and checklists are available at www.albemarle.or ARB. On-line submittal instructions are available at the Community Development Department web page. If you have any questions concerning any of the above, please feel free to contact me. Sincerely, Khris Taggart, Planner 434-296-5832 x3278 ktaggart@albemarle.org COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 Phone (434) 296-5832 Fax (434) 9724126 June 2, 2020 Daniel Hyer Line -Grade 113 41s Street NE, Ste 100 Charlottesville, VA 22902 RE: ARB-2020-39 and ARB-2020-46: Sheetz Initial Site Plan and Architectural Review (TMP 03200-00-00-03800) Dear Mr. Hyer, At its meeting on Monday, June 1, 2020, the Albemarle County Architectural Review Board unanimously voted to accept the applicant's request for deferral of the above -noted applications to allow time for work sessions to resolve the initial site plan issues identified in the staff report. The ARB confirmed that the subject of the fast work session is site layout. The scheduling of your work session(s) depends on the date that submittals are received. The deadline for receiving submittals to be reviewed by the ARB in a work session is noon on the Tuesday prior to the Monday meeting. Staff's recommendations on the initial and final site plans, as provided in the June 1, 2020 staff report, are listed below for reference.: Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended conditions of initial plan approval: o The ARB does not recommend approval of the Initial Plan at this time. Prior to Initial Plan approval the following items shall be resolved to the satisfaction of the ARB: 1. Revise the overall site layout to locate the convenience store and its tower at the corner closest to the Rt. 29JAirport Rd. intersection. 2. Reduce the overall size of the fuel -pump canopy to be consistent with the size of the convenience store. Revise the canopy design to reduce its scale and visual impact on the ECs. Revise the canopy design to increase coordination on site and along the corridor. 3. Explore opportunities to combine bypass and drive-thm lanes and other travelways to reduce paved area. 4. Reorient the car wash building so that the "front" faces Airport Road and the building screens the biofilter. 5. Relocate the vent stacks away from the ECs and eliminate visibility with screening. 6. Relocate the dumpster enclosure to significantly reduce visibility from the EC. 7. Reduce the illumination so that the maximum footcandle value does not exceed 20 fc anywhere on site. Regarding recommendations on the plan as it relates to the guidelines: None. Regarding conditions to be satisfied prior to issuance of a grading permit: None. Regarding the final site plan submittal: o A Certificate of Appropriateness is required prior to final site plan approval. The following items and all items on the ARB Final Site Plan Checklist must be addressed: l . Revise the overall site layout to locate the convenience store and its tower at the comer closest to the Rt. 29/Airport Rd. intersection. 2. Reduce the overall size of the fuel -pump canopy to be consistent with the size of the convenience store. Revise the canopy design to reduce its scale and visual impact on the ECs. Revise the canopy design to increase coordination on site and along the corridor. 3. Explore opportunities to combine bypass and drive-thru lanes and other travelways to reduce paved area. 4. Reorient the car wash building so that the "front" faces Airport Road and the building screens the biofilter. 5. Relocate the vent stacks away from the ECs and eliminate visibility with screening. 6. Relocate the dumpster enclosure to significantly reduce visibility from the EC. 7. Reduce the illumination so that the maximum footcandle value does not exceed 20 fc anywhere on site. 8. Provide for review a sample of the brick proposed for the paving around the building and the red metal proposed for the awnings. 9. Revise the store tower (height, storefront design) to better reflect traditional architecture and to appear as an actual corner tower. 10. Revise the raised bay on the front elevation and the stone bay on the right elevation of the store for greater coordination with the overall building. 11. Revise the north and west elevations of the store to reduce the utilitarian appearance. 12. Revise the building design and/or the landscape plan to address the "blankness" along the west elevation of the car wash. 13. Revise the trademark design to better reflect local historic precedents. 14. Provide specifications on the proposed window glass. Provide samples, if tinted window glass is proposed. 15. Provide versions of the perspectives without proposed trees. 16. Provide a perspective view from Airport Road at the west end of the site. 17. Confirm that the equipment associated with the carwash is internal to the building. 18. Identify on the plans where the carwash signage and related items, and the store's drive- thru related elements, will be located. 19. Revise the color of drive -through (store and car wash) structure/support elements to bronze to reduce visual impacts. 20. Coordinate the dumpster enclosure notes on the site plan to coordinate with the brick - faced architectural design. Eliminate the fence at the top of the wall. 21. Provide elevations that show roof -mounted equipment and how the building will screen the equipment from view. 22. Relocate the store equipment to a location with less visibility from the EC. 23. Add the standard mechanical equipment note to the site and architectural plans: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 24. Revise the lighting plan to show that no footcandle values above 0.5 spill over into the public right-of-way. 25. Revise the site plan to include manufacturer's specifications for all proposed fixtures, including wall -mounted lights. 26. Provide information to confirm that illumination from the fuel pump canopy does not create glare and does not emit light above the horizontal plane. 27. Reduce the height of proposed lighting to 20' maximum, including the base. Adjust the note on the lighting plan accordingly. 28. Add the standard lighting note to the lighting plan: Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half foot-candle. 29. Revise the lighting plan (C9.0) to use LLFs of at least 1.0. 30. Revise the landscape plan to show interspersed ornamentals trees along the ECs. 31. Add trees 40' on center, 2%" caliper at planting, along the northern and western travelway perimeters. 32. Add large perimeter trees along the 15-space parking row close to Rt. 29, 40' on center, 2'/2" caliper at planting. 33. Provide 2 additional interior parking lot trees. 34. Increase shrub planting height to 24" minimum. 35. Provide additional landscaping to better integrate the carwash and related travelways into the overall site. 36. Add trees in the islands at the corners of the store building. 37. Add the standard landscaping note to the landscape plan: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 38. Revise the design of the bioretention ponds to establish them as fully integrated landscape features. 39. Revise the canopy design so that the lowest edge of the canopy does not exceed 14'6" and the top of the canopy does not exceed 17'6". 40. Provide manufacturer's specifications for all proposed fixtures. 41. Reduce the illumination so that the maximum footcandle value does not exceed 20 fc anywhere on site. 42. Submit a sample of the red canopy material for review. 43. Sign applications are required for all proposed signs. 44. Eliminate cabinet style signs or limit them to secondary signs. All cabinet type signs must have opaque backgrounds. 45. Reduce the number of colors used in the sign to a maximum of three (including white). 46. Provide a sample of the Cardinal Red color proposed for the signs. 47. Revise the monument sign to better integrate the Sheetz cabinet sign and base, and to eliminate the "floating" appearance of the Sheetz cabinet. Provide landscaping at the base of the sign to integrate it into the landscape. 48. If the monument sign location is shown on the site plan, include a note acknowledging that the sign location is shown only for information and will not be approved with the site plan. 49. Indicate if the landscaping associated with the Charlottesville -Albemarle Airport sign will remain. Show the condition consistently throughout the site plan. If you have any questions, please do not hesitate to contact me. Sincerely, a Khris Taggart, Planner ktaggart@albemarle.org cc: Airport Plaza LLC, 5029 Stoney Point Road, Barboursville, VA 22923 Marshall, William S., Ind & As Trs of Rachel K Marshall Rev Trust, 1791 Airport Rd., Charlottesville, VA 22911 File cc: Airport Plaza, LLC 5029 Stoney Point Road Barboursville, VA 22923 Daniel Flyer Line -Grade 113 VI Street NE, Ste 100 Charlottesville, VA 22902 File 0 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 229024596 Phone (434) 296-5832 Fax (434) 972-4126 Site Plan review Project: Airport Road Sheetz - ISP Project file number: SDP2020-00025 Plan preparer: Daniel Hyer, PE / Line and Grade, 113 0 St. NE, Suite 100 Charlottesville, VA 22902 dhverAline-arade.com Owner or rep.: Airport Plaza LLC / 5029 Stony Point Road, Barboursville, VA 22923 Applicant: Airport Auto Investments, LLC / 600 E. Water St., Suite H Charlottesville, VA 22902 Plan received date: 31 Mar 2020 Date of comments: 6 May 2020 Reviewer: John Anderson Project Coordinator: Paty Saternye Enaineering review comments / required for Final Site Plan approval: 1. Please restore sheets C6.1 and C6.2 to Final Site plan. Utility profiles and details should be included. 2. Restore sheets C4.1, C4.2, C4.3, needed for site plan review. 3. Restore sheet CO.1, General Construction Notes. 4. Once these sheets are restored, additional review comments are possible. 5. An approved VSMP /WPO plan is required prior to Final Site Plan approval. 6. A recorded SWM facility /public drainage easement plat is required prior to WPO plan approval. 7. C3.0 (Traffic Plan): a. Sheetz fuel tanker entering from Airport Rd, WBL: Driver will likely not know in advance that Sheetz fuel tanker must occupy 4'-5' of inside WBL of Airport Rd. to avoid curb on -site. Image, below, p. 3. Auto -turn fig. indicates fuel tanker entering the site from this direction will entirely occupy the site -to -Airport Rd exit lane. Fuel tanker's path may conflict with a vehicle exiting car wash, or site. Please examine option of shifting fuel loading and delivery zone to back of site, relative to Airport Road. Current Airport Rd. site entry -exit design and fuel loading and delivery zone locations present conflicts: i. 15 parking spaces east of fuel dispensing islands (spaces #33 — 47): 1. For vehicles exiting fueling area to site -exit on Airport Road, if fuel tanker occupies proposed fuel loading /delivery zone, there is a conflict. 2. For Sheetz fuel tanker that has entered the site from Airport Rd, there is possible conflict with car parked in space #33, or with vehicles exiting fueling area, or possibly with fueling space canopy structure, or protective bollard/s. b. Of major site elements (underground fuel tanks, fueling space, store, car wash, bioretention), Engineering encourages review of site objectives. Please examine alternative locations for major site elements to limit conflicts. This site presents a number of potential traffic -traffic, traffic - tanker, traffic -pedestrian conflicts. Initial site plan design reflects thought, effort, and expense, it may be too late for substantial redesign, but certain improvements may be possible. Given investment in design, certain alternatives are less -likely possibilities. Possibilities: i. UG fuel tanks should be at a lower elevation, if possible. This area may not be upslope ofbioretention with infiltration. Infiltration is not a suitable SWM practice for possible I Engineering Review Comments Page 2 of 4 petroleum -laden runoff, which is a possibility at a large-scale commercial re -fueling station. If UG fuel tanks occupy a lower elevation, it may be possible to isolate runoff from the surface of the UG fuel tank area, treat it to remove petroleum fraction (injurious to bioretention) prior to routing runoff to bioretention (or other) infiltration practice. As proposed, runoff from the UG fuel tank area (a site high point /higher elev.) is collected, routed to an underground SWM detention system, and then routed to bioretention filter B. ii. Please consider whether multiple C3.0 traffic /pedestrian patterns are a best alternative. ARB, Planning, Zoning (setback) requirements affect design, but on -site circulation appears problematic, given current location of major site elements (below): 1. Purple —store 2. Blud —car wash 3. Yellow—drive-thru 4. Green —bioretention 5.—Sheetz fuel tanker 6. --commercial fueling space iii. For example: would switching the fueling space and store offer any benefit, or work? iv. Would shifting proposed UG fuel tanks to back of site relative to Airport Road address tanker entry conflict points at entry /exit from Airport Road? v. Is space available between parking spaces 33-47 and Rt. 29 to relocate bioretention filter B from back of site to this location? vi. Please examine alternative site layouts in effort to minimize traffic -traffic conflicts, traffic -pedestrian conflicts, and to protect biofilters. Engineering Review Comments Page 3 of 4 II 6 -d YV r1.:,aj I 1 / �I I I I I r TRAFFIC AND TRUCK RDUDNG PLAN t-----* 1 ; i� On: go. 1 on: No LI }� `�IVYCV�I�AA�A�t I IAM41B1.1MPYOIY ------------- vii. Please provide AASHTO WB-67 auto -turn fig. between points A and B, which appears the only travel path available for a fuel tanker entering the site, either from Airport Road or U. S. Rt. 29. A tanker entering either entry must exit via the other site entry point, but cannot enter and leave via the same site entry point. C4.0 8. Revise proposed RT to RY Min. [Final Site Plan checklist for plan reviewers, p. 2, parking and circulation, item 6.] 9. Provide curbing or trench drains to capture runoff and an oil /water separator to remove petroleum fraction in storm runoff prior to routing runoff from surface above underground fuel tanks or from vehicle fuel islands if bioretention with infiltration persists as a S WM on -site practice. Ref. VA DEQ Stormwater Engineering Review Comments Page 4 of 4 Design Specifications 9 (bioretention), and 8 (Infiltration). Design Spec. 8 specifically prohibits infiltration practices at `hot spots.' Ref. Spec. 8, p. 20, Sec. 10.2 Designation of Stormwater Hotspots, link: httos://www.swbml).vwrrc.vt.edu/wo-content/unloads/2017/11/BW-Soec-No-8 INFILTRATION vl- 9 03012011.odf 10. Provide handrail at top of retaining wall at dumpster enclosure if dumpster remains at this location (or provide screening fence). Safety railing is required for walls > 4' high, and proposed wall ht. > 9'. If screening fence (C8.0 is to be installed, please provide screening fence detail. 11. Recommend label CG-6 fronting parking /UG fuel tanks facing Airport Road spill curb. 12. Provide typ. parking space length for parking spaces #7 — 18. 13. Recommend eliminate parking space #7 (since overlaps HC parking space 6) and shift spaces 8 and 9 south to allow pavement markings to delineate a pedestrian access from parking spaces #33 thru 47 to storefront. Loss of one parking space to delineate pedestrian access of nearly 125' length from parking spaces 33 — 47 (beneath the center of fuel canopy) to safety of sidewalk fronting store is likely a worthwhile trade-off. C6.0 14. Show /label SWM Facility easement for bioretention filters A, B. 15. Provide public drainage easements for any inlets receiving flow from public roads, and for any pipes downstream of proposed on -site bioretention practices, or underground detention systems. 16. Relocate 15" DIA RCP between bioretention filter A and B to earth slope to reduce potential future conflict should pipes in public easement require maintenance replacement. Avoid placing storm pipe between bioretention filters A and B beneath: car wash drive aisle, curb, store drive-thru, and any other paved surfaces (to extent practical). General 17. A VDOT Land Use permit is required for any work within VDOT right-of-way. 18. Site must be accessible for ACF&R apparatus. Engineering defers to ACF&R. Please feel free to call if any questions: 434.296-5832 -x3069 Thank you SDP2020-00025 Airport Road Sheetz ISP 050620 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street (804) 786-2701 Commissioner Richmond, Virginia 23219 Fax: (804) 786-2940 April 16, 2020 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Patricia Saternye Re: Airport Road Sheetz — Initial Site Plan SDP-2020-00025 Review #1 Dear Ms. Saternye: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Line+Grade Civil Engineering, dated 16 March 2020, and offers the following comments: 1. Provide right turn lane warrants for Route 649 into proposed site. This section of SR 649 is designated Minor Arterial. 2. Provide right turn lane warrants for Route 29 into proposed site. This section of SR 29 is designated Principal Arterial and entrance is proposed combined/joint entrance with adjacent parcel. 3. Entrance spacing does not appear to meet the minimum per RDM, Appendix F, pg. 26. This includes the shared entrance adjacent to Route 29. 4. Entrance radii do not appear to meet design vehicle and turning radius by land use. See table 4-3 on page F-94, RDM. Appears 50' radii is the minimum for Commercial/Retail without separate truck access. 5. Project appears to be within the Physical and Functional Areas of Intersection. Part A of the Waiver Form AM-E shall be completed and submitted for review by the District Location and Design Engineer for approval. See RDM appendix F-96 6. Add note stating "Landscaping plants and trees adjacent to the sight distance triangle will need to be maintained in area between 2 and 7 feet above ground as a clear zone to preserve sight lines and accommodate pedestrians." 7. Please show "mill and overlay" areas on plans in accordance with AT-2. Show limits of mill and overlay to adjacent travel lane. Also, please add the WP-2 detail to the plans. 8. MOT plan for this project should be for multi -lane roads, please review TTC -6.2, TTC- 16.2, and TTC-53.0. Please include the proposed mill and overlay. VirginiaDOT.org WE KEEP VIRGINIA MOVING 9. Note that the final plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. 10. Please provide a comment response letter with each submission after the initial. If further information is desired, please contact Max Greene at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency Review Comments for SDP202000025 Initial Site Plan Project Name: AIRPORT ROAD SHEETZ - INITIAL Date Completed: Monday, April 27, 2020 DepartrnentlDivision/Agency: Review Status: Reviewer: Shawn Maddox -E Fire Rescue . Requested Changes 1. A hydrant needs to be added at the entrance on Airport Road. The only hydrant visible on GIS shows a hose lay across multiple lanes of traffic well beyond the required spacing distance- 2- If the building is going to be sprinklered an FDC must be shown and a hydrant located within 100' of the FDC. 3. The ISO needed fire flow for the building is required. 4. Provide the currently available fire flow for the site from a recent ACSA fire flow test. 5. A knox box is required. Please indicate this requirement with a note on the plan. The location can be coordinated with the fire marshal's office. Page: Fl----] Countyof Albemarle Printed On: 05/07/ 0020 Review Comments for SDP202000025 Initial Site Plan Project Name AIRPORT ROAD SHEETZ - INITIAL Date Completed: Friday, May 01, 2020 Department/Division/Agency: Review Status: Reviewer: Richard Nelson ACSA Requested Changes 2020-05-01: I recommend SDP202000025 Airport Road Sheetz — Initial for approval with the following conditions: 1) RWSA will need to review and approve the final site plan. 2) RWSAwill need to approve new connections made on their water main. 3) The water meter for the shopping center to be abandoned is located on Airport Acres Rd. This meter and the one picked up on the survey are located on RWSA's water main. RWSA will need to be on site for the abandonment of these. 4) Provide fixture counts for meter sizing. 5) Provide water use projection for proposed car wash. 6) Contact Tim Brown at tbrown@serviceauthodty.org if interested in car wash program. 7) Existing sewer laterals will need to be abandoned at the sewer main. 8) Confirm with Fire/Rescue if a fire hydrant will be required. Page: Fl� County of Albemarle Printed On: 05/07/ 0020 Review Comments for SDP202000025 Initial Site Plan Project Name: AIRPORT ROAD SHEETZ - INITIAL Date Completed: I Sunday, April 05, 2020 Department/Division/Agency: Review Status: Reviewer: Michael Dellinger LJ CDD Inspections (Requested Changes Add the following note to the general notes page: ALL water lines, sewer lines, and fire lines from the main to the structure MUST have a visual inspection performed by the building department. Add the following to the general notes page: All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks. Add the following note to the general notes page: Buildings or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a demolition permit. Asbestos removal permits are required if positive for such from Albemade County and VDOLI. Contact VDOLI for their additional requirements and permits for demolition projects at 540-562-3580 x131. Add the following note to the general notes page: Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Walls require inspections as outlined in the USBC Page: 1� County of Albemarle Printed On: 05/07/2020 Review Comments for SDP202000025 Initial Site Plan Project Name I AIRPORT ROAD SHEETZ - INITIAL Date Completed: Tuesday, April 21, 2020 DepartmenUDivisionlAgency: Review Status: Reviewer: vdona Fort RWSA No Objection Page: 1� County of Albemarle Printed On: 05/07/ 0020 Review Comments for SDP202000025 Initial Site Plan Project Name AIRPORT ROAD SHEETZ - INITIAL Date Completed: Friday, April 03, 2020 DepartmenVDivision/Agency: Review Status: Reviewer: Bnan Becker CDD E911 No Objection Page: 1� County of Albemarle Printed On: 05/07/ 0020 COMMONWEALTH of VIRGINIA In Cooperation With the Thomas Jefferson Health Diviiic7 ALBEMARLE- CNANLOTTESVILLE State Department of HealthFLUVANNA COUNTY' (PALMYRA) 1138 Rose HIII Drive CWNTY ISTANANpSVILLE) 1.001S.A COUNTY(LWISA) Phone (434) 972-6219 P. O. BOX 7546 NELSON COUNTY (LOVINGSTON) Fax 1434)972-4310 Charlottesville, Virginia 22906 May 4, 2020 Patricia Satemye, Senior Planner Albemarle County Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Airport Road Sheetz Initial Site Plan SDP2020-25 Ms. Satemye: As requested, I have reviewed the Initial Site Plan, dated 3/16/20, for the proposed development, referenced above. It appears both water and sewer will be provided by public utilities, and it does not appear any existing wells or onsite septic systems will be impacted, I have no objection to the proposed development. If there are any questions or concerns, please give me a call, 434-972-4306. Sincerely, Alan Mazurowski Environmental Health Supervisor Thomas Jefferson Health District alan.mazruowski(a),vdh.vir ie nia. og_v