HomeMy WebLinkAboutWPO201700037 Bond Inspection Request 2020-08-26Inhmal Use Only
r *-Poe Received: _
Fee Paid:
Received by:
Intake: Forward to Management Analyst
BOND INSPECTION REQUEST
APPROVED PLAN #: V 0 2017000 37
PROJECT NAME (including Phase ft Broo1 lt:11 �%dta�
(As listed on the approved plan)
This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please
check the appropriate box below for the requested inspection(s).
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
M/VSMPNESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance sections 17-207 & 17-208 $250
VReduction o Release
❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14-438 $269
❑ Reduction o Release
❑ Water & Sewer bond per Subdivision Ordinance section 14-435 $269
❑ Reduction o Release
❑ Site Development Performance bond (Incomplete Site Work & Landscaping) $301
o Reduction (site work only) o Release
TOTAL FEES. 2-50-se
Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville,
VA 22902, Attention: Management Analyst — Phone 434-296-5832; Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts,
certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures).
Bonds will not be reduced or released without record drawings and inspection documentation per the state
requirements and County's published procedures. A minimum 20% of the original posting is held until
acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is
part of the bonded site work, a request for reduction should only be made once all landscaping is complete.
If all required documentation is not received within 30 days of receipt of this request, this application shall be
deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will
be required. Applications may be withdrawn for a full refund within 30 days of receipt.
If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner.
Please provide contact information.
EMAIL: Tucker.Loyd@Riverbenddev.com
OR REGULAR MAIL ADDRESS: P.O. BOX 1467
Alan
Charlottesville VA 22902
of Owner/Developer
Print Name
Date
Reviud 7/152014, 7202015, 11/32015, 8/142017,1/282020
•
_
=1
D
N
g'
b9
o
M W
0
J
AtIaS ATLAS Construction Management
Cofl astioa 455 2°d St SE Suite 201
Management Charlottesville, VA 22902
Document Transmittal
FROM
Emily Cox Tucker Loyd
COMPANY: DATE:
tllbemade County 8/24/2020
Rf::
TOTAL NO. OF PAGES INCLUDING COVER:
RE: Brookhill WPO-2017-000-37 BIR
Emily,
Please find attached Bond Inspection Request and Fee for Brookhill WP0201700037
bond.
Sincerely,
.
Tucker Loyd
ATLAS Construction Management
Tuckeratlas@gmail.com
434-249-9885