Loading...
HomeMy WebLinkAboutSUB201700094 Bond Reduction 2020-08-26let ernal 1W Only Date Received: F. Paid: Received by: Intake: Forward to Management Analyst BOND INSPECTION REQUEST APPROVED PLAN #: SUB201700094 PROJECT NAME (including Phase #): Glenbrook at Foothills -Road Plans (As listed on the approved plan) This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please check the appropriate box below for the requested inspection(s). Inspections for the purposes of bond reduction or release will require a separate fee for each bond. ❑ VSMP/VESCP Erosion Control, Stormwater Management and/or Mitigation per Water Protection Ordinance sections 17-207 & 17-208 $250 ❑ Reduction m Release ® Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14-438 $269 id Reduction ❑ Release ❑ Water & Sewer bond per Subdivision Ordinance section 14-435 $269 ❑ Reduction ❑ Release ❑ Site Development Performance bond (Incomplete Site Work & Landscaping) $301 ❑ Reduction (site work only) ❑ Release TOTAL FEES $269.00 Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville, VA 22902, Attention: Management Analyst —Phone 434-296-5832; Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts, certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures). Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and County's published procedures. A minimum 20% of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded site work, a request for reduction should only be made once all landscaping is complete. If all required documentation is not received within 30 days of receipt of this request, this application shall be deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will be required. Applications may be withdrawn for a full refund within 30 days of receipt. If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner. Please provide contact information. EMAIL: sam@riverbenddev.com OR REGULAR MAIL ADDRESS: P.O. Box 1467 Charlottesville, VA 22902 Sif stare of Owner/Developer Alan Taylor Print Name 08.16.2020 Date Revised 71152014, 7202015, 11/3/2015, 8/142017, Ir82020 i N o dog 0) o O �O a V i C D m 3 m N w 4 /A y ro �P! j CD N c 0 D i MM n N W w 0 0 � I Report of changes to the highway system of. - County of Albemarle ReportPeriod. 061OL12019 through 0N30/1019 This document reports changes in the locality's VDOT maintained secondary system ofstate highwaysfor the reportperiod. Developer bonds held pending VDOT's acceptance of streers reported here may be released in accordance with the local ordinance. Route Street Name RW Width Mileage Local Gov. VDOT Effective (A) Resolution Date Pro)ea Foothills Crsslag ]//Park Rgtge Drive Extension Type Chanye: AdMon 1250 Park Ridge Dnve 0.10 8t52019 WBJ2010 Temdni: From: Leon Lane, 027 MI West Route 1715 To: 0,19 Mlles Weat to new ESM Total Net Change In County's Mileage 0.19 Fer Infomation regrading Ah report contact VDOT's Residency Adednirowor or Cmtrat Office (Martin Law(88I) 78"795) Page 1 of 61