Loading...
HomeMy WebLinkAboutWPO201800092 Calculations 2020-09-01FOOTHILL CROSSING, PHASE V STORMWATER MANAGEMENT CALCULATIONS PACKET Date of Calculations DECEMBER 71 2018 Revised on APRIL 2, 2019 Revised on JANUARY 28, 2020 3WI? R. COLUM Uc. No. 035791 PREPARED BY: COLLINS ENGINEERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 PH 434.293.2813 FX APPROVED www.collins-engineering.com by the Albemarle County Commu4it DElelppmg�ntDepartment Date U 9/ U Z lJ 0 RIP WPO SCS TR-55 Calculations Soils Mapping (Source: NRCS Web Soil Survey Online Database) Soils Table (Source: NRCS Web Soil Survey Online Database) Albemarle County, Virginia (VA003) Albemarle County, Virginia (VA003) Map Unit Map Unit Name Per[ of Percent symbol 58 Belvoir loam, 2 4.5% to 7 percent slopes 7B Braddock loam, 42.4% 2 to 7 percent slopes 37C3 Hayesvllle clay 43.1% loam, 7 to 15 percent slopes, severely eroded 95 Wehadkee silt 10.0% loam Totals for Area of 100.00/b Interest Note: Soils' properties witin this property are predominantly composed of hydrologic type B soils. Precipitation Data (Source: NOAA's National Weather Service, Hydrometerorological Design Studies Center, Atlas 14 Point Precipitation Frequency Estimates) Map l� Terrain a 0 S a a 0 o a Claude s Croat Park V n c c N Cro,,, Pa,y 0 i� J!Git POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH 90% CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOAA Atlas 14, Volume 2, Version 3 PDS-based precipitabon frequency estimates with 90% confidence intervals in inches)' Average recurtence Irftwal (years) ourd6on Ol�l� 10 25 I� 100 200 ® 1000 2M (2.75142) (33i4.14) (L235.28) (4.98-6.21) (6.0559) (695A.77) (Z92-00.1) (8.95-5) (104137) (11745.5) U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 2: Runoff Curve Number and Runoff FL-ENG-21A 06/04 Project: Foothill Crossing -Phase V Designed By: FGM, PE Dale: 4/2/2019 Location: East of Indigo Road Checked By: SRC, PE Date: 4/2/2019 Check One: Present X Developed 1. Runoff curve Number (CN) Soil name and Cover description CN (weighted) = Drainage Area Area Product of CN [alcualued'S' hydrologic group (Cover type, treatment, and hydrologic condition; percent CN total product/ Description (Appendix A) impervious;unconnected/ connected impervious area ratio) (Acres) zArea totalarea Value Impervious Areas 98 0.00 0.0 DAA B Woods in Good Condition 55 3.33 183.2 55.0 8.18 (Pre -De,) Lawns in Good Condition 61 0.00 0.0 Impervious Areas 98 0.00 0.0 DAB (Pre-Dev.) B Woods in Good Condition 55 0.69 38.0 55.0 8.18 Lawns in Good Condition 61 0.00 0.0 Impervious Areas (Includes Offsite Ex. Imp. Areas) 98 2.52 247.0 DAA&B B Woods in Good Condition 55 0.00 0.0 84.2 1.88 (Post-Dev.) Lawns in Good Condition (75%+Groundcover) 61 1.50 91.5 Used onlyfor EmergencyAccess Energy BalanceCola.: Sheet Flow (Port-Dev.) B Impervious Areas 98 0.03 2.9 72.1 3.87 Lawns in Good Condition (75%+Groundermr) 61 0.07 4.3 Used onlyfor Emergency Access Energy Balance Calcs.: Sheet Flow B Access Road Impervious Areas 98 0.08 7.8 82.1 2.17 (Post- ev.) Lawns in Good Condition (75%+Groundoeor) 61 0.06 3.7 Used onlyfor Emergency Access Energy Balance Calla.: Sheet Flow (Port-Dev.) B Impervious Areas 98 0.08 7.8 79.5 2.58 Lawns in Good Condition (75%+Groundermr) 1 61 1 0.08 1 4.9 Used only for Emergency Access Energy Balance Cala.: Sheet FlowF (Port-Dev.) B Impervious Areas 98 0.03 2.9 73.1 4.0] Lawns in Good Condition (75%+Groundcover) 61 0.08 4.9 2. Runoff 1-year Storm I 2-year Storm 10-year Storm Drainage Area Description Frequencyyears1 2 10 n/a Rainfall, P(24 hour) -inches 3.06 3.70 5.57 n/a Runoff, Q-inches 0.21 0.42 1.28 DAA(Pre-Dev.) Runoff, Q- inches 0.21 0.42 1.28 DA B (Prc- e ) Runoff, Q-inches 1.58 2.13 3.82 DAA&B(Part -Dev.) Runoff, Q- inches 0.85 1.26 2.65 Sheet Flow C (Port -De,) Runoff, Q- inches 1.44 1.96 3.61 Sheet Flow D (PostUDev.) Runoff, Q- inches 1.26 1.76 3.35 Sheet Flow E past D ) Runoff, Q- inches 0.80 1.20 2.56 Sheet Flow F (Post-Dev.) U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 3: Time of Concentration (TJ or Travel Time (T,) Project: Foothill Crossing- Phase V Location: East of Indigo Road Check One: Present X Developed X Check One: T, X Tt Segment ID: Sheet Flow: (Applicable to Tc only) 1 Surface description (Table 3-1) 2 Manning's roughness coeff., n (Table 3-1 3 Flow length, L (total L < 100) (ft) 4 Two-year 24-hour rainfall, P,(in.) 5 Land slope, s (ft/ft) 6 Compute T, _ [0.007(n*L)a.e) / Pz .5 s.4 Shallow Concentrated Flow Designed By: FGM, PE Checked By: SRC, PE Through subarea n/a FL-ENG-21A 06/04 Date: 4/2/2019 Date: 4/2/2019 DAA DAB DAA&B (Pre-Dev.) (Pre-Dev.) (Post-Dev.) Woods- Light Woods- Light Underbrush Underbrush Dense Grass 0.4 0.4 0.24 100 100 67 3.70 3.70 3.70 0.05 0.04 0.02 0.23 0.25 0.15 7 Surface description (paved or unpaved) Unpaved Unpaved 8 Flow Length, L (ft) 150 125 9 Watercourse slope, s (ft/ft) 0.160 0.072 10 Average velocity, V (Figure 3-1) (ft/s) 6.7 3.3 11 T,= L / 3600*V 0.01 0.01 Channel Flow: 12 Cross sectional flow area, a (ft) 13 Wetted perimeter, Pw (ft) 14 Hydraulic radius, r= a/Pw (ft) 15 Channel Slope, s (ft/ft) 16 Manning's Roughness Coeff, n 17 V= [ 1.49r2/3s°.5 ) / n 18 Flow length, L (ft) 19 Ti= L/3600*V 20 Watershed or subarea T, or Tt (Add T, in steps 6, 11 and 19) 0.24 1 0.26 1 0.16 NOTE: Sheet flow subareas C, D, E & F are assumed to have the most conservative SCS Tc of 0.10 hrs. U.S. Department of Agriculture FL-ENG-21C Natural Resources Conservation Service 06/04 TR 55 Worksheet 4: Graphical Peak Discharge Method Project: Foothill Crossing -Phase V Designed By: KKW, PE Date: 1/28/2020 Location: East of Indigo Road Checked By: SRC, PE Date: 1/28/2020 Check One: Present X Developed X 1. Data Drainage Area Description Drainage Area Description Drainage Area Description Drainage Area Description DAA (Pre-Dev.) DAB (Pre-Dev.) DAAB,B (Post-Dev.) Drainage Area (Am) in miles' 0.0052 0.0011 0.0063 Runoff curve number CN= 55.0 55.0 84.2 Time of concentration(Tc)= 0.24 0.26 0.16 Rainfall distribution type- II II II Pond and swamp areas spread throughout the watershed- 0 0 0 2. Frequency -years 1 2 10 1 2 10 1 2 10 3. Rainfall, P(24 hour) -inches 3.06 3.70 5.57 3.06 3.70 5.57 3.06 3.70 5.57 4. Initial Abstraction, la -inches 1.64 LM 1.64 1.64 1.64 LM 0.38 0.38 0.38 5. Compute Ia/P 0.53 0." 0.29 0.53 0.44 0.29 0.12 0.10 0.07 6. Unit peak discharge, Qu-csm/m 325 475 650 325 475 650 950 950 950 ]. Runoff, Q from Worksheet 2-inches 0.21 0.42 1.28 0.21 0.42 1.28 1.58 2.13 3.82 B. Pond and Swamp adjustment factor, Fp 1 1 1 1 1 1 1 1 1 9. Peak Discharge, Qp- cfs where Qp=Qu Am QFp 0.36 1.03 4.32 0.07 0.21 0.90 Routed Through The SW M Facility WATERSHED SUMMARY Pre -Development 1-year Flow, 2-year Flow, 10-year Flow, CN Area, ac cts cts cfs DAA 55.0 3.33 0.36 1.03 4.32 DA 8 55.0 0.69 0.07 0.21 0.90 55.0 4.02 0.43 1.24 5.21 Stormwater Management Facility Routing Calculations Foothill- Phase V-rev 200128 BasinFlow printout INPUT: Basin: Foothill Crossing- Phase VI 6 Contour Areas Elevation(ft) Area(sf) Computed Vol.(cy) 646.00 983.00 0.0 648.00 1983.00 107.7 650.00 3265.00 300.1 652.00 4683.00 592.9 654.00 6159.00 993.2 656.00 7722.00 1506.2 Start—Elevation(ft) 646.00 Vol.(cy) 5 Outlet Structures Outlet structure 0 Orifice name: Barrel area (sf) 1.227 diameter or depth (in) 15.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 644.000 multiple 1 discharge out of riser Outlet structure 1 Orifice name: Low -Flow Orifice area (sf) 0.005 diameter or depth (in) 1.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 646.000 multiple 1 discharge into riser Outlet structure 2 Orifice name: Low -Flow Orifice area (sf) 0.136 diameter or depth (in) 5.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 652.580 Page 1 cVMM Foothill- Phase V-rev 200128 multiple 4 discharge into riser Outlet structure 3 Weir name: Riser diameter (in) 10.000 side angle 0.000 coefficient 3.300 invert (ft) 653.750 multiple 1 discharge into riser transition at (ft) 0.253 orifice coef. 0.500 orifice area (sf) 0.545 Outlet structure 4 Weir name: Emergency Spillway length (ft) 65.000 side angle 75.960 coefficient 3.300 invert (ft) 654.750 multiple 1 discharge through dam 4 Inflow Hydrographs Hydrograph 0 SCS name: 1-yr, 24-hr. SCS Design Storm Area (acres) 4.020 CN 84.200 Type 2 rainfall, P (in) 3.060 time of conc. (hrs) 0.1300 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 7.661 peak time (hrs) 11.930 volume (cy) 853.394 Hydrograph 1 SCS name: 2-yr, 24-hr. SCS Design Storm Area (acres) 4.020 CN 84.200 Page 2 Type rainfall, P (in) time of conc. (hrs) time increment (hrs) time limit (hrs) fudge factor routed peak flow (cfs) peak time (hrs) volume (cy) Hydrograph 2 SCS name: Area (acres) CN Type rainfall, P (in) time of conc. (hrs) time increment (hrs) time limit (hrs) fudge factor routed peak flow (cfs) peak time (hrs) volume (cy) Hydrograph 3 SCS name: Area (acres) CN Type rainfall, P (in) time of conc. (hrs) time increment (hrs) time limit (hrs) fudge factor routed peak flow (cfs) peak time (hrs) volume (cy) OUTPUT: `a Foothill- Phase V-rev 200128 3.700 0.1300 0.0200 30.000 1.00 true 10.303 11.930 1147.738 10-yr, 24-hr. SCS Design Storm 4.020 84.200 2 5.570 0.1300 0.0200 30.000 1.00 true 18.502 11.930 2060.926 100-yr, 24-hr. SCS 4.020 84.200 2 9.060 0.1300 0.0200 30.000 1.00 true 34.624 11.930 3856.908 Routing Method: storage -indication Hydrograph 0 Design Storm Page 3 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Hydrograph 1 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Hydrograph 2 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Hydrograph 3 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Foothill- Phase V-rev 200128 Peaks: 1-yr, 24-hr. SCS Design Storm 7.620 at 11.92 (hrs) 0.056 at 15.52 (hrs) 652.543 at 17.92 (hrs) 690.848 Peaks: 2-yr, 24-hr 10.249 at 0.813 at 652.892 at 757.982 Peaks: 10-yr, 24-hr 18.403 at 5.196 at 654.687 at 1156.399 SCS Design Storm 11.92 (hrs) 12.54 (hrs) 12.56 (hrs) . SCS Design Storm 11.92 (hrs) 12.10 (hrs) 12.10 (hrs) Peaks: 100-yr, 24-hr. SCS Design Storm 34.440 at 11.92 (hrs) 32.670 at 11.94 (hrs) 654.999 at 11.94 (hrs) 1234.893 Tue ]an 28 11:05:32 EST 2020 Page 4 Channel and Flood Protection Calculations 9 VAC 25-870-66 (Analysis corresponding to DA A & B's 1" Low -Flow Orifice) Section B: Channel Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria in subdivision 1, 2 or 3 of this subsection..." Section B.1: Manmade stormwater conveyance systems "When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land -disturbing activity, either..." a. or b. shall be met: Section B.1.b. "The peak discharge requirements for concentrated stormwater flow to natural stormwater conveyance systems in subdivision 3 of this subsection shall be met." Section B.3 "... the maximum peak flow rate from the one-year 24-hour storm following the land -disturbing activity shall be calculated either.." a. or b." Section B.3.a. "Under no condition shall Q Developed be greater than Q Pre -Developed nor shalIQ Developed be required to be less than that calculated in the equation (Q Forest * RV Forest ) I RV Developed Q Developed :S (Q Forest * RV Forest ) / RV Developed Where: Q Forest = 0.43 RV Forest = 0.21 RV Developed= 1.58 Q Developed < 0.06 cfs Section B.4 Limits of Analysis The analysis terminates at the proposed SWM facility's outfall since subsection B.3.a is met. 9 VAC 25-870-66 (Analysis corresponding to DA A & B's 1" Low -Flow Orifice) Section C: Flood Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet one of the following criteria as demonstrated by use of acceptable hydrologic and hydraulic methodologies:" Section C.2.b.: The point of discharge "releases a post development peak flow rate for the 10-year 24-hour storm event that is less than the predevelopment peak flow rate from the 10-year 24-hour storm event. Downstream stormwater conveyance systems do not require any additional analysis to show compliance with flood protection criteria if this option is utilized." Section C.3 Limits of Analysis The analysis terminates at the proposed SWIM facility's outfall since subsection C.2.b is met. QtATocT ?P(nc *xcbJ 17ts�6N Qvo,swti = y,04 cps ®�p,Esc IJ,S cK E— 'DE53GN llst j -45 BAsro EN 1-k%ofteR fLOV4 * pcA ?4ar;. 3 ,18 -% I c�ccm+ of Su,,�,G SSE Oz*4tTCAj bur WT WSS TMAN 6" st 11CA LA . lWa-M, a� �NYN.'A'ESSdN> —� JVJj-D,,SQA(LA) p,Nt cos at" Mat- 3.7s row, VOA cLAsS AZ STeNE HAS A LO- away gw%rCfhoN 14 Bf FLAT/AT 0% 6W,'C IWCVR GLASS r E3lTEk. t4U4C Kelgo 3j,", THE 151C35-timC 6Aeawp A MTNaMwK pF I" Rft TNt CjDS � A -c 9'Ne of 'Feat a FAXgr_ StAALL Ova'µ LPR A tilt-. M ra" 14 FINAL. Ussr.N wI Vt)PT c\. Ai iL%OPA CIS" -RAZC►CAISSSS) ;-- At"� CL� FSLlER F'AQ,0.'1t Channel and Flood Protection Calculations (Calculations associated with sheet flow from Subareas C, D, E &F) 9 VAC 25-870-66 Sheet Flow Subareas C, D, E & F Section B: Channel Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria in subdivision 1, 2 or 3 of this subsection..." Section B.1: Manmade stormwater conveyance systems "When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land -disturbing activity, either..." a. or b. shall be met: Section B.1.a. "The manmade stormwater conveyance system [sheet flow and culvert] shall convey the post development peak flow rate from the two-year 24-hour storm event without causing erosion of the system. Detention of stormwater or downstream improvements may be incorporated into the approved land -disturbing activity to meet this criterion..." Section B.4.a Limits of Analysis The sheet flow runoff for subareas C, D, E & F drain to the existing defined channel. The limits of analysis ends at the subareas C, D, E & F since "the site's contributing drainage area is less than or equal to 1.0% of the total watershed area." NOTE: Please see sheet 5A of the final site plan. Sheet 5A depicts the overall watershed to the proposed culvert, which is located at the confluence of subareas C, D, E & F. The overall watershed is 53.4 acres. Individual Overall Percent of Overall Subarea, ac. Watershed, ac. Watershed Subarea C 0.10 53.4 0.2% Subarea D 0.14 53.4 0.3% Subarea E 0.16 53.4 0.3% Subarea F 0.11 53.4 0.2% 9 VAC 25-870-66 Sheet Flow Subareas C, D, E & F Section C: Flood Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet one of the following criteria as demonstrated by use of acceptable hydrologic and hydraulic methodologies:" Section CA: "The point of discharge [sheet flow] releases stormwater into a stormwater conveyance system that, following the land -disturbing activity, confines the postdevelopment peak flow rate from the 10-year 24-hour storm event within the stormwater conveyance system [culvert]. Detention of stormwater or downstream improvements may be incorporated into the approved land -disturbing activity to meet this criterion, at the discretion of the VSMP authority" Section C.3.a Limits of Analysis "...stormwater conveyance systems shall be analyzed for compliance with flood protection criteria to a point where ... The site's contributing drainage area is less than or equal to 1.0% of the total watershed area draining to a point of analysis [culvert] in the downstream stormwater conveyance system." Virginia Runoff Reduction Method Water Quality Calculations D QViryiniu Runoff Reduction Method NewD .iopmentcompli .spreadsheet - Version 3.0 02011 BMP Standards and Specifications M2013 Draft BMP Standards and Specification Project Name: Foothill Crousing.PhaseV Data: 4/2/2019 BMP De9go Speclfirodons List 2013 Draft Stds & Specs Site Information Post -Development Project (Treatment Volume and Loads) Land cover facresl A Solis BSailz cSe is DSolls Totals forest/Open Spam(axs)- undisturbed foresto m or ref casein land 015 0.25rotected Managed Turf (aura) - disturbed, graded for yards or other turf to be mowM/maned 3.01 3'08 Impervious Cover (ac esl 295 2.95 'F cUpen Seem acres must be proteRedin ocmrdonce with the oinindo Aunoffireduction Method 6.28 Constants Annual rainfall(inchod 63 Target Rainfall Emnt(inrhea)1.00 Total Phosphorus (To FMC(mp/L) 0.26 Total trustee (MI EM[ (mg/LI 1.86 Target TP Load(m/acreNq 0.41 Pl unineu correction factor) 0.90 Runoff coefficients Rod ASmis I BSolis 1 [Sells 1 DSolls Foost/Open Space 1 0.02 i 0.03 i 0.04 i 0.05 Managed Turt 1 0.15 1 0.20 1 0.22 1 0.25 Impervious Ca r 1 0.95 1 0.95 1 0.95 1 0.95 Land Cover Summary Traatment Volume and Nutrient Loads TreM(aere-ft)ume 0.2855 Treatment Volume (cubic feet) 12,436 TP Load (lb/yr) 7.81 Tn Loa yr 55.90 Forect/Open Spare Cmer(acres) 0.25 Weighted or(forest) 0.03 %Forest <% Managed Tudf rner(acres) 3.08 Weighted or(turf( 0.20 %Managed Turf 99% Impervious Cover (acres) 2.95 or(imperviaus( 0.95 %Impervious 9]% Site Area (acres) 6.28 tlala InPutcells mnshn[valuez calnrladoncells u W Q p S S S S 00 O 00 O a o o O W OC Q Q 0 O 0 O 0 O 0 O O O O Y O Q 0' p O O O O O O O O c'888SS0 0000co chi a 00000x appo o S S a E m p p o p 0 O 0 p 0 p 0 0 m O p p o p 0 O o p O m 7 W 3M p O p O p O p O p O Y p 0 p 0 p 0 p O m ry p O m N m p O q Q p G G O G G O p a 0 p G G O G n vi G n vi yNj G N T.�' T Z. T \ T \ T \ N T \ T \ T \ T T H d T \ T \ T \ w U n O Q Q Q Q E z L W OWC. ay CQ Q 7 u> Q ?V_ 0 O O Ux O Cy JWO O C 0to Q Q W O C z u O z z Wz z z Y zoU m FF O nF¢F F> Z£ 0. F O O u L W N F a O g O d O W W O F p w = O W W 6 Q F C U >> Q C O C O O C 00 OC F OC M N W C O J Or Or Or Or �.a Or W £ W Q u F z W a Q a u F y f C z W W C O z F OO z O CD to O N z O C 1' f_ z_ Y F_ 6 O Z Q Z z z ' Q W o � W � C O C i