HomeMy WebLinkAboutSDP202000036 Correspondence 2020-09-03ALBEMARLE
COUNTY I VIRGINIA
Is this a new submission or a re -submission?
r New Submission t= Re -submission
The Community Development Department (COD) now accepts the digital submission of development applications
through anew web -based form. This feature is being implemented in an effort to provide a user-friendly method to
submit and resubmit multiple development applications. Please click the New Submission button above to seethe list of
available applications.
To guide you through the digital submission process, we have provided Submittal Instructions on howto use this
Submission Form and some General Submission Guidelines. Please review both of these documents before making your
submission.
Submittal Instructions
General Submission Guidelines
If you have questions about the correct submission method for your project, please email us at
cddsubmittal@albemarle.org or call us at (434) 296-5832.
You have selected re -submission. If necessary, you Will need to complete the appropriate PDF application form(s).
o For Road Plan re -submissions, an application and fee are required and can be found here.
• For Water Protection Ordinance re -submissions, an application and fee are required and can be found here.
o For Special Use Permit re -submissions, an application can be found here. A Fee will apply for all submittals after the
first free re -submittal.
• For Zoning Map Amendment re -submissions, an application can be found here. A Fee will apply for all submittals after
the first free re -submittal.
o For all other applications (SDP, SUB, CLE, etc.) there is no application or fee required to submit.
Once you have finished filling out any required application, save it to a location on your computer.
Please enter your project's application number in the field provided below, once completed, tab to the neM field. The
application number you entered will reference the project's application number in Albemarle County Community
Development Department's development tracking system. Once referenced, the Project Name and Project Type fields Will
be auto -populated. Please confirm the information referenced in these fields is correct. After confirmation, please enter
your name and email address for contact purposes and attach any associated files for resubmittal through the File
Upload button.
Submission Fees are determined by application type and are listed within each application.
Full Name*
Bc: John [be
Riki van Niekerk
Email *
Bc: jalydce@grmil.ccm
riki@roudabush.com
Phone Number*
Bc: 434-973-9999
806-283-1802
Application Number*
Ec: SOM1800005
sdp202000036
(Re(cc +4 digit yea+5 dgitnunher
Is this an LOR?*
r Yes jJ No
Project Name
(%entry needed - mst have correct AppIrAm PLnher ahove to sutxrit)
Belvedere Phase 5A - Final - Digital
Project Type
(%entry needed)
SDP
File Upload
Chly FCF and TIFFfilelypes accepted
Application_SDP202000036_Beivedere Ph 5A Final Site Plan.pdf
80.66KB
Checklist_Final_Sfte_Plan_Belvedere Ph SA.pdf
93.18KB
Comment Response letter —Belvedere Phase 5A—Final site plan.pdf
349.3KB
Tree Save Area Documentation.pdf
11.33MB
Belvedere -Phase 5—retaining wall plans.pdf
10.2MB
DRAFT_20-02 Supplemental Declaration for 5A dr2.pdf
127.75KB
DRAFT —Deed from BLH to NBI (002).pdf
43.04KB
Transmittal Belvedere Phase 5A_FSP.pdf
293.2KB
Belvedere Phase 5A_FSP_sheets 1-24.pdf
36.92MB
Mttirums¢e per file: 70M3