Loading...
HomeMy WebLinkAboutSDP202000036 Correspondence 2020-09-03ALBEMARLE COUNTY I VIRGINIA Is this a new submission or a re -submission? r New Submission t= Re -submission The Community Development Department (COD) now accepts the digital submission of development applications through anew web -based form. This feature is being implemented in an effort to provide a user-friendly method to submit and resubmit multiple development applications. Please click the New Submission button above to seethe list of available applications. To guide you through the digital submission process, we have provided Submittal Instructions on howto use this Submission Form and some General Submission Guidelines. Please review both of these documents before making your submission. Submittal Instructions General Submission Guidelines If you have questions about the correct submission method for your project, please email us at cddsubmittal@albemarle.org or call us at (434) 296-5832. You have selected re -submission. If necessary, you Will need to complete the appropriate PDF application form(s). o For Road Plan re -submissions, an application and fee are required and can be found here. • For Water Protection Ordinance re -submissions, an application and fee are required and can be found here. o For Special Use Permit re -submissions, an application can be found here. A Fee will apply for all submittals after the first free re -submittal. • For Zoning Map Amendment re -submissions, an application can be found here. A Fee will apply for all submittals after the first free re -submittal. o For all other applications (SDP, SUB, CLE, etc.) there is no application or fee required to submit. Once you have finished filling out any required application, save it to a location on your computer. Please enter your project's application number in the field provided below, once completed, tab to the neM field. The application number you entered will reference the project's application number in Albemarle County Community Development Department's development tracking system. Once referenced, the Project Name and Project Type fields Will be auto -populated. Please confirm the information referenced in these fields is correct. After confirmation, please enter your name and email address for contact purposes and attach any associated files for resubmittal through the File Upload button. Submission Fees are determined by application type and are listed within each application. Full Name* Bc: John [be Riki van Niekerk Email * Bc: jalydce@grmil.ccm riki@roudabush.com Phone Number* Bc: 434-973-9999 806-283-1802 Application Number* Ec: SOM1800005 sdp202000036 (Re(cc +4 digit yea+5 dgitnunher Is this an LOR?* r Yes jJ No Project Name (%entry needed - mst have correct AppIrAm PLnher ahove to sutxrit) Belvedere Phase 5A - Final - Digital Project Type (%entry needed) SDP File Upload Chly FCF and TIFFfilelypes accepted Application_SDP202000036_Beivedere Ph 5A Final Site Plan.pdf 80.66KB Checklist_Final_Sfte_Plan_Belvedere Ph SA.pdf 93.18KB Comment Response letter —Belvedere Phase 5A—Final site plan.pdf 349.3KB Tree Save Area Documentation.pdf 11.33MB Belvedere -Phase 5—retaining wall plans.pdf 10.2MB DRAFT_20-02 Supplemental Declaration for 5A dr2.pdf 127.75KB DRAFT —Deed from BLH to NBI (002).pdf 43.04KB Transmittal Belvedere Phase 5A_FSP.pdf 293.2KB Belvedere Phase 5A_FSP_sheets 1-24.pdf 36.92MB Mttirums¢e per file: 70M3