No preview available
HomeMy WebLinkAboutSDP200300102 Review Comments Architectural Review Board Approval 2020-09-04From: Margaret Maliszewski Sent: Friday, September 4, 2020 12:40 PM To: melody@issolutions.biz; Jeffrey Baker Subject: Entrance Corridor review comments on LOR for SDP2003-102: Lowe's lighting Melody, I've reviewed your submittal and have the following comments: 1. Confirm that no new pole fixtures or pole locations are proposed. Existing poles must not increase in height. New poles must not exceed 20' in height, including bases and fixtures. Clearly identify any new poles or fixtures. 2. Provide photometrics on a line drawing site plan so that locations are legible. Include a property line on the plan. 3. Fixtures emitting 3,000 lumens or more must be full cutoff fixtures. The FL3 wall and pole, 1G, LC4000K and EG fixtures appear to exceed 3,000 lumens and do not appear to be full cutoff fixtures. Replace the fixtures with full cutoff styles or provide additional information to clearly show that proposed fixtures meet the requirements. 4. Revise the photometrics using an LLF of 1.0. Maximum illumination at the ground must not exceed 20fc. 5. Include on the plan the footcandle values at the ground for the RC1 fixtures. 6. Lamps must have a color temperature between 2000 and 3000 Kelvin. Revise the luminaire schedule to show that this criterion is met. 7. Poles and fixtures must have a consistent color — dark brown, dark bronze, or black. Revise the luminaire schedule to show this criterion is met. 8. Add the standard lighting note to the plan: Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one- half footcandle. 9. Clarify the meaning of the note, "Red-ish pink building flood arms". 10. Provide the cut sheet for the EACL fixture. 11. Revise the luminaire schedule to clearly show the total lumens emitted by each LED fixture. 12. Note that lighting installed inside the building is not subject to Entrance Corridor review. Please submit a revised plan addressing each of these comments. Include a memo indicating how each item was addressed. Thanks. Margaret Margaret Maliszewski, Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3276 From: melody@issolutions.biz <melody@issolutions.biz> Sent: Tuesday, August 18, 2020 4:27 PM To: Jeffrey Baker <jbaker@albemarle.org> Cc: Margaret Maliszewski <MMaliszewski@albemarle.org>; Mariah Gleason <mgleason@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: LOR for SDP2003-102: Lowe's lighting C This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Jeff — I have attached the Photometric plan and cut sheets. I will forward the request letter once Mr. Petree corrects it and forwards it to me. Thank you! Melody Grimmett Project Compliance Manager Project Manager— Walmart ERF Integrated Service Solutions fS 9937 S Perdue Avenue Baton Rouge, LA 70814 �/ 0: 888.878.70611 C: 225.939.7285 I F: 678.805.4995