Loading...
HomeMy WebLinkAboutWPO202000038 Review Comments WPO VSMP 2020-09-08�A COUNTY OF ALBEMARLE Department of Community Development r„P 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Sleep Number - Charlottesville Project file number: WPO202000038 Plan preparer: Collins Engineering — Scott Collins [scott@collins-engineering.com] Owner or rep.: Albemarle Bank & Trust Co. Plan received date: 03 Aug 2020 Date of comments: 08 Sept. 2020 Reviewers: Emily Cox County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please enter a name and email on the registration statement. 2. Registration statement must be signed(page 4). 3. Please clarify the areas on page 2 of the registration statement (in section IV A) 4. Section 9, signed certification, must be signed. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. No comments. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Stormwater management agreement must be executed before plan approval. Please contact Ana Kilmer to begin this process (akilmergalbemarle.org). 2. Nutrient credits must be purchased before bond can be posted. Please contact Ana Kilmer before purchasing credits (akilmer@albemarle.org). 3. Topography appears to be about 30 ft different than county GIS. Please ensure it is correct. 4. Ensure bottom of SWM Basin B is lower than the E&S trap. 5. Plat must be recorded with SWM easement and deed before this plan can be approved. 6. SWM easement must be outside of VDOT right-of-way. 7. Sidewalk should be fully inside the VDOT right-of-way. Engineering Review Comments Page 2 of 3 D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Clearly show the limits of disturbance encompassing the 1.14 AC referenced in the narrative and registration statement. 2. Show the wash rack for the construction entrance on the plan view. 3. Remove the detail for a stone construction entrance. A paved construction entrance must be used at this location. 4. The construction entrance will need a right-of-way diversion to ensure water goes the trap and not out the entrance toward Rt. 29. 5. Show the mulch symbol anywhere there is temporary or permanent seeding. 6. E&S measures must be shown for the offsite work(entrance and sanitary sewer). 7. Provide documentation showing permission to complete work on adjacent, offsite property. 8. Show elevations for the proposed wall. 9. Check the anti -vortex box on the trash rack detail. 10. Sediment trap cannot outfall on the sidewalk. 11. Baffles appear to be necessary in the sediment trap as the length is not 2 times the width. 12. Construction entrance will need a right-of-way diversion to ensure dirty water does not get out to Route 29. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and Engineering Review Comments Page 3 of 3 the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, ajoint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; bft://www.albemarle.org/deptforms.asp?department=cdengMTo