Loading...
HomeMy WebLinkAboutARB202000047 Plat - Revision 2020-09-04BOHLERI Via Federal Express & Electronic Upload County of Albemarle Architectural Review Board 401 McIntire Road, North Wing Charlottesville, VA 22902 Attn: Khris Taggart Dear Mr. Taggart: 28 Blackwell Park Lane, Suite 201 Warrenton, VA 20186 o. 540.349.4500 September 4, 2020 Re: ARB-2019-151 ARB-2020-47 Major Site Plan - 2nd Review Response 29'h Place 1500 Seminole Trail Charlottesville, VA 22901 Albemarle County BE #V194600 Bohler Engineering is pleased to submit on behalf of Federal Realty Investment Trust, the 3rd Submission Major Site Plan for the Proposed Starbucks in Charlottesville, Virginia. The following is our comment response letter addressing comments received from your office dated August 18, 2020. Each comment is addressed and responded to as follows: Comment 1: Provide a physical sample of the color proposed for the vertical siding for review. Response 1: A physical sample of the vertical siding color will be provided with this submission package. Comment 2: Add the standard mechanical equipment note to the site plan. Response 2: The standard mechanical equipment note has been added as Note #4 to Sheet C-301. Comment 3: Revise the landscape plan to accurately show the existing tree canopy sizes for better coordination with new tree locations. Add trees along the frontage to achieve consistent spacing, approximately 35' on center, including north of the site entrance that is to be closed. Provide more than one species of tree to meet the requirements for shade and ornamentals. Provide a fully coordinated planting of trees and shrubs. Response 3: The Landscape Plan on Sheet C-601 has been updated to reflect the requests above. Comment 4: Revise the landscape plan to show additional shrubs in the planting area between the drive -through lane and the 7-space parking area. Response 4: Additional shrubs have been added between the drive -through lane and the 7-space parking area on Sheet C-601. w . BohlerEngineering.com BOHLERY Khris Taggart 291h Place ARB 2nd Review Comments September 4, 2020 Page 2 of 2 Comment 5: Provide information showing how visibility of new equipment will be eliminated. Response 5: Information regarding how visibility of the new equipment will be eliminated has been provided with the updated proposed elevations by JP2 Architects LLC, which will be included with this submission package. Should you have any questions regarding this project or require additional information, please do not hesitate to contact me at (540) 349-4500. Sincerely, Bohler Engineering 7K Nr Ryan Yauger, P.E. RY/jb \\bohlereng.net\shares\VA-PROJECTS\19\V194600\Administrative\Letters\200904 Major Site Plan 2nd Review ARB CRL.doc www. BohlerEngineering.com