Loading...
HomeMy WebLinkAboutWPO202000033 Bond Estimates 2020-09-11Project Name: VSMP Plan for Malloy Ford, WP0202000033 WPO file #: WP02020-00033 TMP(s): 04500-00-00-068A0, 04500-00-00-112A0, 04500-00-00-112B1 Date Estimate Completed: 09/11/20, S.Paul, RGA [ checkby 1. Anderson, 9/11/2o Erosion and Sediment Control Bond Estimate Item Number 1 z 3 4 5 50 51 52 53 54 55 56 57 58 59 6o 61 62 63 64 65 Item stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DID, FD, RWD) temporary slope drain (TSD) silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP)-Trap#1 outlet protection (OP)-Trap#2 outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance rip -rap, placed No. Unit Unit Cost Cost installed 0.9 acres $5,000.00 $4,550.00 503.6 ft $5.00 $2,518.10 ft $5.00 $0.00 37.5 ft $13.00 $487.50 pipe length 0 ft pipe diameter 0 in $0.00 $0.00 $100.00 $0.00 $200.00 $800.00 length 0 ft width 0 ft $0.00 $0.00 length 0 ft width 0 ft $0.00 $0.00 length 0 ft width 0 ft $0.00 $0.00 length 0 ft width 0 ft 0 $0.00 depth in channel 0 ft channel width 0 ft $0.00 $0.00 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $3,500.00 $0.00 depth ■ft length _ft width (tons) 0 tons $60.00 $0.00 survey and layout (price per 0.1 mi.) acres 0.91 traps and basins mobilization Temporary Access road WP0202000033 VSMP Malloy Ford_ESC_bond_est_09_11_20_Paul_AlbCo_chk 091120 _ $455.00 $2,500.00 cost sum $15,810.60 contingency $1,581.06 Total $17,400 9/11/2020