HomeMy WebLinkAboutWPO201900018 Other 2020-07-14VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES (VAR30)
NOTICE OF TERMINATION 2019
Permit Coverage Number (VARI04119t :
Section I. Operator/Permittee Information. The person or entity that has active permit coverage approval and operational control
over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must
sign the certification in Section VII (per Part III. K. of the VAR 10 Permit).
Construction Activity ��s
Operator Name: PEA%3a)D`1 ScAll
Contact Person: 61E44pao
Address: S74w-7 A*$6
City, State, Zip Code: LM4rt6.VK1 ktix LA 2Z9o2
Phone Number: y3 a!-L9(_6 f01
Primary Email: _ oKt.trrw N P �n7 sc�c .atG
CC Email:
Section Il. Construction Activity Location Information. Project site information. /�
Construction Activity Name: M0,92 S6h(aL
Address: /i S7oaaac7 Xmk�x A ,4#5
City and/or County and Zip Code: Z2ilioz
Latitude and Longitude J
(6-digit, decimal degrees format): 38. WZ BY t—ir7.<D/Z%3
Section Ill. Reason for Terminating Coverage under the General Permit. The operator shall submit a Notice of Termination within
s300 days after meeting one or more of the following conditions (select one OF more):
q A. Necessary permanent control measures Included in the SWPPP for the site are in place and functioning effectively Ind Mal
/ stabilization has been achieved on all portions of the site for which the operator is responsible. When applicable, long-term
responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records
prior to the submission of a Notice of Termination;
❑ R. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for
the ongoing discharge;
❑ C. Coverage under an alternative VPDES or state permit has been obtained; or
❑ D. For residential construction only, temporary soil stabilization has been completed, the operator has provided written
notification to the homeowner about the Importance of final stabilitalion and Incorporating a copy of the notification and
signed rertiRratinn statement into the SWPPP and the residence has been transferred to the homeowner.
Rev 04/2019 PAGE 1 j 6
CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019
Section IV. Participation in a Regional Stormwater Management Plan. If your site discharges to a regional stormwater
management facility, provide information related to the regional stormwater management plan. Attach a separate list if discharging
to multiple regional facilities.
Regional Stormwater Management
Facility Type:
Address:
City and/or County and Zip Code:
Latitude and Longitude
(6-di it, decimal degrees format):
Total Acres Treated by Regional Facility
(report to one -hundredth of an acre
Impervious Acres Treated by Regional Facility
(report to one -hundredth of an acre):
Section V. Perpetual Nutrient Credits. If your site Is utilizing nutrient credits, provide information related to the perpetual nutrient
credits that were acquired in accordance with § 62.144.15:35 of the Code of Virginia. Attach a separate list d needed,
Nonpoint Nutrient Credit Generating Entity
Perpetual Nutrient Credits Acquired
Include the affidavit of sale for all nutrient credits acquired. Is the affidavit of sale of nutrient credits attached? OYES ONO
Section VI. Permanent Control Meawres- If applicable, list the post -development stormwater management facilities or best
management practices (BMPs) that were constructed and installed as part of this activity to comply with the stormwater
management technical criteria (structural and nonstructural, on -site and off -site). Attach a separate list if needed.
If you have permanent control measures, the following items are required to be Included with this form in order to complete your
Notice of Termination submittal:
Engineer's Certification Statement
As -built plans (construction record drawings)— digital
As -built plans (construction record drawings) — full-sized, paper
Stormwater Management Plans — digital
E. BMP Maintenance Agreement— notarized original, for public and private projects under DEQ's VSMP Authority
Stormwater Management Facility Types (please choose from the followina bills; type )
Bioretention 1
Bioretention 2
Bioretention basin
Bioretention filter
Constructed Wetland 1
Constructed Wetland 2
Constructed wetlands
Dry Swale 1
Dry Swale 2
Extended detention (2 x WQ Vol)
Extended Detention Pond 1
Extended Detention Pond 2
Extended detention -enhanced
Filtering Practice 1
Filtering Practice 2
Grass Channel
Grassed Swale
Infiltration (1. WQ Vol)
Infiltration (2 x WQ Vol)
Infiltration 1
Infiltration 2
Other 118 (manufactured
treatment device, etc.)
I er IlC Imanufmtwe
treatment 2;
in etc.)
Permeable Pavement 1
Permeable Pavement 2
Rainwater Harvesting
Retention basin 1(3x WQ Voll
Retention basin II (4. WQ Vol)
Retention basin 111 a x WQ Vol
with aquatic bench)
Sand filter
Sheelflow to Vegetated Filter or
Conserved Open Space 2
Soil Amendments
Urban Boretention
Vegetated finer strip
Vegetated Roof 1
vegetated Roof 2
Wet Pond 1
We Pond 2
Wet Swale 1
Wet Swale 2
Rev 04/2019 PAGE 2 16
CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019
Stormwater Management Facility e1
BMP Tvoe- I V, dIWA Zoo— MCY (-- rate
Date BMP Became Functional:
sr
Address (if available):
%L iZ SJJW S
N/,7
City and/or County and Zip Code:
0j"i-xiow
a z4fa
Latitude and Longitude
(6Ei it, decimal de revsformat):
3F.Q'aZ
' 7,j S'012fJ
Receiving Waters)
outfall dischar e):
g
rJ.SC.tnI /�,✓
,�?Ll
Total Acres Treated
(report to one -hundredth of an acre):
Q_ 2L
Impervious Acres Treated
(rep2rt to one -hundredth of an acre):
Stormwoter Management Facility e2
BMP Type:
Date BMP Became Functional:
Address III available):
City and/or County and Zip Code:
Latitude and Longitude
6-di it, decimal degrees format):
Receiving Water(s)
(outfall discharge):
Total Acres Treated
(report to one -hundredth of an acre):
Impervious Acres Treated
(report to one -hundredth of an acre):
PAGE 3 16
CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019
Section VII. Certification. This Certification must be signed by a person representing the operator identified in Section I. and
meeting the requirements of 9VAC25-880-70 Part III K.
Certification: "I certify under penalty of law that I have read and understand this Notice of Termination and that this document and
all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and
evaluated the information submitted, Based on my inquiry of the person or persons who manage the system or those persons
directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true,
accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of
fine and imprisonment for knowing violations."
Printed Name:
Signature (signed in ink):
Date:
Section Vill. Submittal Instructions. Please submit this form to the Virginia Stormwater Management Program (VSMP) Authority
that has jurisdiction for your construction activity. If the locality is the VSMP Authority, please submit your form dIre" ly to the
locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authority please send to: If the locality is the VSMP Authority, please send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
Po Box 110S
Richmond VA 23218
co nst ru ct i ongp@ d ea. v ireinia.gov
Lic. 0. 035791
-7lyi2.
LVIE, YJMr
Permit terminations may be delayed if there are
outstanding annual permit maintenance fee balances due.
Rev 04/2019 PAGE 4 1 b