HomeMy WebLinkAboutWPO201900039 Calculations 2020-09-09Stormwater
Calculations
Hillcrest Vineyards
WPO 2019-00039
8585 Dick Woods Rd
Afton, VA 22952
Augusta Professional Park, LLC
c/o Michael McGinnis
Lyndhurst, VA 22952
APPROVED
by the Albemarle County
Community Development Department
Date 09/16/2020
File WP0201900039, Amendment #1
SWM Plan
Amendment #1;
includes ESC/PPP
Phase 2-B, C-3.0213
for detention basin #2
4offt�U���e
Engineering 8 Design Studio
250 E. Elizabeth St, Suite 114 • Harrisonburg, VA 22802
540.228.0202 1 www.monteverdedesigns.com
l0 r.\
Table of Contents
O /
t� SETH R DERICK 9
Lic. o. 041454 W
Sept 9, 2020 �W
SIGNAL �ls
Stormwater Calculations Table of Contents
Compliance Strategy Summary and Narrative................................................................................... i
Section 1- Drainage Area Hydrographs
Hydrograph Summary Report lyr-24hr Storm.....................................................................
1.1
Pre Dev Project Area lyr-24hr Storm...................................................................................
1.2
Pre Dev B Remainder lyr-24hr Storm..................................................................................
1.3
Pre Dev Total lyr-24hr Storm...............................................................................................
1.4
Post Dev Project Area lyr-24hr Storm.................................................................................
1.5
Post Dev B Remainder lyr-24hr Storm................................................................................
1.6
Total Drainage to B lyr-24hr Storm.....................................................................................
1.7
Post Dev POA B Routed lyr-24hr Storm..............................................................................
1.8
Pond Report- Pond No. 3 - Det Basin 2 lyr-24hr Storm ....................................................
1.9
Hydrograph Summary Report DA A 2yr-24hr Storm............................................................
1.10
Pre Dev DA North 2yr-24hr Storm.......................................................................................
1.11
Pre Dev South 12yr-24hr Storm..........................................................................................
1.12
Pre Dev South 2 2yr-24hr Storm..........................................................................................
1.13
Pre Dev South Total 2yr-24hr Storm....................................................................................
1.14
Post Dev DA to Det Basin #1 2yr-24hr Storm.......................................................................
1.15
Det Basin #1 Routed 2yr-24hr Storm...................................................................................
1.16
Pond Report 1- Detention Basin #1.....................................................................................
1.17
Post Dev South 2 2yr-24hr Storm.........................................................................................
1.18
Post Dev South Total 2yr-24hr Storm...................................................................................
1.19
Sheet Flow to Bypass Channel 2yr-24hr Strom....................................................................1.20
Hydrograph Summary Report DA B 2yr-24hr Storm............................................................
1.21
Pre Dev Project Area 2yr-24hr Storm...................................................................................
1.22
Pre Dev B Remainder 2yr-24hr Storm..................................................................................
1.23
Pre Dev Total 2yr-24hr Storm...............................................................................................
1.24
Post Dev Project Area 2yr-24hr Storm.................................................................................
1.25
Post Dev B Remainder 2yr-24hr Storm................................................................................
1.26
Total Drainage to B 2yr-24hr Storm.....................................................................................
1.27
Post Dev POA B Routed 2yr-24hr Storm..............................................................................
1.28
Hydrograph Summary Report DA A 10yr-24hr Storm..........................................................
1.29
Pre Dev DA North 10yr-24hr Storm.....................................................................................
1.30
Pre Dev South 1 10yr-24hr Storm........................................................................................
1.31
Pre Dev South 2 10yr-24hr Storm........................................................................................
1.32
Pre Dev South Total 10yr-24hr Storm..................................................................................1.33
Post Dev DA to Det Basin #1 10yr-24hr Storm.....................................................................
1.34
Det Basin #1 Routed 10yr-24hr Storm.................................................................................
1.35
O' " h,
Table of Contents
Post Dev South 2 10yr-24hr Storm.......................................................................................1.36
Post Dev South Total 10yr-24hr Storm.................................................................................
1.37
Sheet Flow to Bypass Channel 10yr-24hr Storm..........................................................................1.38
Hydrograph Summary Report DA B 10yr-24hr Storm..........................................................
1.39
Pre Dev Project Area 10yr-24hr Storm.................................................................................
1.40
Pre Dev B Remainder 10yr-24hr Storm................................................................................
1.41
Subarea to Section A Pre Dev 10yr-24hr Storm...................................................................
1.42
Subarea to Section B Pre Dev 10yr-24hr Storm...................................................................
1.43
Subarea to Section C Pre Dev 10yr-24hr Storm...................................................................
1.44
Pre Dev Total 10yr-24hr Storm.............................................................................................
1.45
Post Dev Project Area 10yr-24hr Storm...............................................................................
1.46
Post Dev B Remainder 10yr-24hr Storm..............................................................................
1.47
Total Drainage to B 10yr-24hr Storm...................................................................................
1.48
Post Dev POA B Routed 10yr-24hr Storm............................................................................
1.49
Subarea to Section A Post Dev 10yr-24hr Storm..................................................................
1.50
Subarea to Section B Post Dev 10yr-24hr Storm..................................................................
1.51
Subarea to Section C Post Dev 10yr-24hr Storm..................................................................
1.52
Hydrograph Summary Report DA A 100yr-24hr Storm ........................................................
1.53
Pre Dev DA North 100yr-24hr Storm...................................................................................
1.54
Pre Dev South 1100yr-24hr Storm......................................................................................1.55
Pre Dev South 2100yr-24hr Storm......................................................................................1.56
Pre Dev South Total 100yr-24hr Storm................................................................................1.57
Post Dev DA to Det Basin #1 100yr-24hr Storm...................................................................
1.58
Det Basin #1 Routed 100yr-24hr Storm...............................................................................
1.59
Post Dev South 2 100yr-24hr Storm.....................................................................................1.60
Post Dev South Total 100yr-24hr Storm...............................................................................1.61
Sheet Flow to Bypass Channel 10yr-24hr Storm..........................................................................1.62
Hydrograph Summary Report DA B 100yr-24hr Storm ........................................................
1.63
Pre Dev Project Area 100yr-24hr Storm...............................................................................
1.64
Pre Dev B Remainder 100yr-24hr Storm..............................................................................
1.65
Pre Dev Total 100yr-24hr Storm...........................................................................................1.66
Post Dev Project Area 100yr-24hr Storm.............................................................................
1.67
Post Dev B Remainder 100yr-24hr Storm............................................................................
1.68
Total Drainage to B 100yr-24hr Storm.................................................................................
1.69
Post Dev POA B Routed 100yr-24hr Storm..........................................................................
1.70
Section 2 —Water Quality Analysis
SiteInformation................................................................................................................... 2.1
SiteSummary ....................................................................................................................... 2.2
Runoff Volume and Curve Number Calculations.................................................................. 2.3
o' h,
Table of Contents
Section 3 — Runoff Summaries and Energy Balance Analysis
Drainage Area A Runoff Summary..................................................................................................3.1
Drainage Area B Runoff Summary & Energy Balance Numbers.................................................3.2
Section 4—Storm Sewer & Channel Reports
Channel Report Ditch 'A' - Upper Section 10 yr-24hr Storm................................................4.1
Channel Report Ditch'A' - Lower Section 10yr-24hr Storm.................................................4.2
Channel Report Ditch'B' 2yr-24hr Storm.............................................................................4.3
Channel Report Ditch'B' 10yr-24hr Storm...........................................................................4.4
Channel Report Ditch'C' Section A -A 2yr-24hr Storm Pre Dev............................................4.5
Channel Report Ditch'C' Section A -A 2yr-24hr Storm Post Dev..........................................4.6
Channel Report Ditch'C' Section A -A 10yr-24hr Storm Pre Dev..........................................4.7
Channel Report Ditch'C' Section A -A 10yr-24hr Storm Post Dev........................................4.8
Channel Report Ditch'C' Section B-B 2yr-24hr Storm Pre Dev............................................4.9
Channel Report Ditch'C' Section B-B 2yr-24hr Storm Post Dev..........................................4.10
Channel Report Ditch'C' Section B-B 10yr-24hr Storm Pre Dev..........................................4.11
Channel Report Ditch'C' Section B-B 10yr-24hr Storm Post Dev........................................4.12
Channel Report Ditch'C' Section C-C 2yr-24hr Storm Pre Dev............................................4.13
Channel Report Ditch'C' Section C-C 2yr-24hr Storm Post Dev...........................................4.14
Channel Report Ditch'C' Section C-C 10yr-24hr Storm Pre Dev..........................................4.15
Channel Report Ditch'C' Section C-C 10yr-24hr Storm Post Dev.........................................4.16
18 inch Culvert P3, 2-year Capacity Analysis........................................................................
4.17
18 inch Culvert P1, 10-Year Capacity Analysis......................................................................4.18
15 inch CMP Pipe from Flow Bypass Str to Level Spreader, 10-yr........................................
4.19
Basin 1 Outlet Flow Bypass Str, 100-yr...........................................................................................4.2(
o' h,
Table of Contents
Stormwater Narrative
Compliance Strategy Summary
Channel Protection
DA A: Sheet Flow (9VAC25-870-66.D) — 56.0' Engineered Level Spreader
DA B: Energy Balance (9VAC25-870-66.B.3) [Q1-allowable = 4.06 cfs, Qr-actua, = 4.00 cfs]
DA C: Uncontrolled 0.16 AC Section: Sheet Flow (9VAC25-870-66.D) — Finish Grade
Flood Protection
DA A: Reduction in 10-year Peak (9VAC25-870-66.C.2.B) [Cuo-Pre =4.39 cfs, Clio -Post =4.30 cfs]
DA B: Reduction in 10-year Peak (9VAC25-870-66.C.2.B) [Qlo-pre =32.01 cfs, Cho -Post =28.58 cfs]
DA C: Uncontrolled 0.16 AC Section: Sheet Flow (9VAC25-870-66.D) — Finish Grade
Water Quality
Open Space Conserved by Easement [26.0 acres, B soils]
This project consists of a Tasting Room and Venue space at Hillcrest Vineyards, with both buildings and
associated impervious areas (parking, drive aisles) located on a ridgetop above the agricultural and
wooded areas below. Prior to development, the hillside drained through a combination of sheet flow
and natural channels, in addition to one existing manmade culvert, to an agricultural pond located on an
unnamed tributary to Anderson Creek, located within the Middle James -Buffalo drainage basin (HUC8
02080203).
Post development, the two new buildings and associated infrastructure on the ridgetop are within
Drainage Area A. A dry detention basin has been designed to replace an existing sediment basin on the
eastern edge of the project. This detention basin will collect and detain stormwater from subarea Al by
routing runoff through the pond and then directing flow to an engineered level spreader. The 10-year
discharge from the pond was able to be reduced to below the pre -development discharge to that point.
With this lower discharge, the level spreader was able to be sized for up through and including the 10-
year storm. Beyond that, the water will continue to sheet flow through planted vines across very
uniform contours. Currently, the vines have not yet been planted, but the ground is covered by dense,
brushy vegetation which will remain until the planting operation commences. For storms larger than the
10-year category, a bypass flow channel has been designed to convey the flow down the slope. The
vineyard area below the level spreader is not part of the site area, but part of the agricultural operation.
The access road from Dick Woods Rd follows a previous farm road until past the agricultural pond.
Between the point of divergence (serving as the project's lower limit) and the ridgetop development
area, the majority of the road (that which does not drain to Drainage Area A) drains into Drainage Area
B. Sub -areas have been denoted to analyze channel protection and capacity, while a total analysis of
flood protection is provided on Area B prior to release into the agricultural pond.
The runoff from the majority of the road becomes channelized. A dry detention basin has been
prescribed to collect the channelized area in order to achieve energy balance, at point B, prior to release
�' ' lh,
Section 1
to a natural channel upstream of the agricultural pond and thereby meet requirements set forth by
9VAC25-870-66, subsection B(3).
The entirety of Area B has been further analyzed, at point B, to ensure the detention facility provides
adequate detainment to meet the flood protection requirements of 9VAC25-870-66, subsection C(2).
Stormwater runoff from a small portion of the hillside access road, Drainage Area C, discharges as sheet
flow, meeting the requirements set forth by 9VAC25-870-66, subsection D.
Hydrographs produced to analyze the various areas and subareas can be found in Section 1 of this
report. Water quality analysis, which includes the sizing of dedicated forest / open space easements,
can be found in Section 2. Energy balance analysis is provided in Section 3, while analysis of the storm
sewer and conveyance channels is provided in Section 4.
' lh'
Section 1
DRAINAGE AREA
HYDROG RAPHS
/ovlh,
Section 1
Hydrograph Summary Re p oftHydraflow Hydrographs Extension for Autodesk® Civil 3DO 2019 by Autodesk, Inc. v2020
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(CIS)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuff)
Inflow
hyd(s)
Maximum
elevation
M
Total
strge used
(cufl)
Hydrograph
Description
1
SCS Runoff
0.515
1
739
4,046
Pre Dev Project Area
2
SCS Runoff
3.858
1
739
30,298
Pre Dev B Remainder
8
Combine
4.373
1
739
34,344
1, 2,
Pre Dev Total
10
SCS Runoff
1.624
1
736
8,393
Post Dev Project Area
11
SCS Runoff
3.858
1
739
30,298
Post Dev B Remainder
13
Combine
5.457
1
738
38,691
10, 11,
Total Drainage to B
14
Reservoir
3.995
1
757
38,688
13
866.26
3,765
Post Dev POA B Routed
Drainage Area B REV 9.gpw
Return Period: 1 Year
Tuesday, 09 / 1 / 2020 1.1
Hydrograph Report
HydraFlow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020 Tuesday, 09 / 1 / 2020
Hyd. No. 1
Pre Dev Project Area
Hydrograph type
= SCS Runoff
Peak discharge
= 0.515 cfs
Storm frequency
= 1 yrs
Time to peak
= 739 min
Time interval
= 1 min
Hyd. volume
= 4,046 tuft
Drainage area
= 3.150 ac
Curve number
= 61
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= TR55
Time of cone. (Tc)
= 35.50 min
Total precip.
= 2.97 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Pre Dev Project Area
Q (efs) Hyd. No. 1 -- 1 Year Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
000
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 1 Time (min)
1.2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 2
Pre Dev B Remainder
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 1 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 23.590 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 2.97 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
4.00
3.00
2.00
1.00
0.00
0 120 240
Hyd No. 2
Pre Dev B Remainder
Hyd. No. 2 -- 1 Year
360 480 600 720 840 960
Tuesday, 09 / 1 / 2020
= 3.858 cfs
= 739 min
= 30,298 cult
= 61
= Oft
= 34.40 min
= Type II
= 484
Q (cfs)
4.00
3.00
2.00
1.00
1080 1200 1320 1440 1560
Time (min)
1.3
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 8
Pre Dev Total
Hydrograph type
= Combine
Peak discharge
= 4.373 cfs
Storm frequency
= 1 yrs
Time to peak
= 739 min
Time interval
= 1 min
Hyd. volume
= 34,344 cuft
Inflow hyds.
= 1, 2
Contrib. drain. area
= 26.740 ac
Q (cfs)
5.00
4.00
OM
r tr
1.00
0.00
0 120 240
Hyd No. 8
360 480 600
— Hyd No. 1
Pre Dev Total
Hyd. No. 8 -- 1 Year
720
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00
840 960 1080 1200 1320 1440 1560
— Hyd No. 2 Time (min)
14
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 10
Post Dev Project Area
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 1 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 3.150 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 2.97 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
2.00
1.00
Post Dev Project Area
Hyd. No. 10 -- 1 Year
120 240 360 480 600 720 840 960
Hyd No. 10
Tuesday, 09 / 1 / 2020
= 1.624 cfs
= 736 min
= 8,393 cult
= 70.8
= Oft
= 35.50 min
= Type II
= 484
Q (crs)
2.00
1.00
' 0.00
1080 1200 1320 1440 1560
Time (min)
1.5
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 11
Post Dev B Remainder
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 1 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 23.590 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 2.97 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
4.00
3.00
2.00
1.00
0.00
0 120 240
Hyd No. 11
Post Dev B Remainder
Hyd. No. 11 -- 1 Year
360 480 600 720 840 960
Tuesday, 09 / 1 / 2020
= 3.858 cfs
= 739 min
= 30,298 cult
= 61
= Oft
= 34.40 min
= Type II
= 484
Q (cfs)
4.00
3.00
2.00
1.00
1080 1200 1320 1440 1560
Time (min)
1.6
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 13
Total Drainage to B
Hydrograph type
= Combine
Peak discharge
= 5.457 cfs
Storm frequency
= 1 yrs
Time to peak
= 738 min
Time interval
= 1 min
Hyd. volume
= 38,691 tuft
Inflow hyds.
= 10, 11
Contrib. drain. area
= 26.740 ac
Q (Cfs)
6.00
5.00
4.00
3.00
2.00
1.00
Total Drainage to B
Hyd. No. 13 -- 1 Year
Q (Cfs)
6.00
5.00
4.00
3.00
2.00
1.00
I . ' 0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 13 —Hyd No. 10 —Hyd No. 11 Time (min)
1.7
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 14
Post Dev POA B Routed
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 1 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Inflow hyd. No.
= 13 - Total Drainage to B
Max. Elevation
Reservoir name
= Det Basin 2
Max. Storage
Storage Indication method used.
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
Post Dev POA B Routed
Hyd. No. 14 -- 1 Year
Tuesday, 09 / 1 / 2020
= 3.995 cfs
= 757 min
= 38,688 cuft
= 866.26 ft
= 3,765 cuft
Q (Cfs)
6.00
5.00
4.00
3.00
2.00
1.00
I I I I I I I I I 1 "1 0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 14 —Hyd No. 13 ®Total storage used = 3,765 cult Time (min)
W
Pond Report
Hydraflow Hydrographs Extension for Autodesk® Civil 31 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Pond No. 3 - Det Basin 2
Pond Data
Contours -User-defined contour areas.
Conic method used for volume
calculation. Begining
Elevation - 864.00 ft
Stage / Storage Table
Stage (ft) Elevation (ft)
Contour area (sgft)
Incr. Storage (cult)
Total storage (cult)
0.00 864.00
1,011
0
0
1.00 865.00
1,549
1,270
1,270
2.00 866.00
2,167
1,849
3,120
3.00 867.00
2,866
2,508
5,628
4.00 868.00
3,609
3,230
8,858
5.00 869.00
4,435
4,015
12,872
6.00 870.00
5,331
4,876
17,748
7.00 871.00
6,295
5,806
23,554
8.00 872.00
7,331
6,806
30,359
9.00 873.00
8,437
7,877
38,236
10.00 874.00
9,614
9,018
47,254
Culvert / Orifice Structures
Weir Structures
[A]
[B] [C] [PrfRsr]
[A] [B]
[C] [D]
Rise (in) = 24.00
8.00 0.00 0.00
Crest Len (ft)
= 12.50 20.00
0.00 0.00
Span (in) = 24.00
8.00 0.00 0.00
Crest El. (ft)
= 871.50 872.50
0.00 0.00
No. Barrels = 1
2 0 0
Weir Coeff.
= 3.33 2.60
3.33 3.33
Invert El. (ft) = 864.00
864.00 0.00 0.00
Weir Type
= 1 Broad
---
Length (ft) = 95.00
0.00 0.00 0.00
Multistage
= Yes No
No No
Slope (%) = 1.00
0.00 0.00 n/a
N-Value = .013
.013 .013 n/a
Orifice Coeff. = 0.60
0.60 0.60 0.60
EAL(ini
= 0.000 (by Wet area)
Multi -Stage = n/a
Yes No No
TW Elev. (ft)
= 0.00
Note: Culven/Onfice outacvrs are analyzed under inlet(ic) and outlet(oc) control. Weir nears checked for orifice conditions(ic) and subanergence(a).
Stage / Storage / Discharge
Table
Stage Storage Elevation
CIvA CIvB CIvC
PrfRsr WrA
WrB WrC
WrD Exfil User
Total
ft cuft ft
cis cis cfs
cfs cfs
cfs cfs
cfs cfs cfs
cfs
0.00 0 864.00
0.00 0.00 ---
--- 0.00
0.00 --
--- --- ---
0.000
1.00 1,270 865.00
2.18 is 2.12 is ---
--- 0.00
0.00 ---
- -- -
2.118
2.00 3,120 866.00
3.67 is 3.67 is ---
--- 0.00
0.00 ---
- -- -
3.668
3.00 5,628 867.00
4.87 is 4.83 is --
--- 0.00
0.00 ---
- -- -
4.827
4.00 8,858 868.00
5.78 is 5.78 is --
--- 0.00
0.00 ---
- -- -
5.782
5.00 12,872 869.00
6.69 is 6.62 is --
--- 0.00
0.00 ---
- -- -
6.616
6.00 17,748 870.00
7.36 is 7.36 is --
--- 0.00
0.00 ---
- -- -
7.363
7.00 23,554 871.00
8.12 is 8.05 is --
-- 0.00
0.00 ---
- -- -
8.050
8.00 30,359 872.00
22.13 is 7.41 is --
-- 14.72
0.00 ---
- -- -
22.13
9.00 38,236 873.00
42.24 is 1.51 is --
-- 40.73
s 18.38 ---
- -- -
60.62
10.00 47,254 874.00
45.23 is 0.79 is ---
-- 44.43
s 95.53 --
-- - --
140.75
1.9
Hydrograph Summary Re p oftHydraflow Hydrogrephs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(CIS)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuff)
Inflow
hyd(s)
Maximum
elevation
M
Total
strge used
(cufl)
Hydrograph
Description
1
SCS Runoff
1.616
1
734
8,911
Pre Dev DA North
3
SCS Runoff
1.437
1
721
3,899
Pre Dev South 1
4
SCS Runoff
26.26
1
728
114,033
Pre Dev South 2
5
Combine
26.91
1
728
117,932
3,4
Pre Dev South Total
7
SCS Runoff
10.41
1
728
37,189
Post Dev DA to Det Basin #1
8
Reservoir
2.624
1
752
37,179
7
1074.52
14,794
Det Basin #1 Routed
10
SCS Runoff
24.68
1
732
120,298
Post Dev South 2
11
Combine
26.89
1
732
157,477
8,10
Post Dev South Total
13
SCS Runoff
0.661
1
719
1,539
Sheet flow to Bypass Channel
Drainage Area A REV 9- LKP.gpw
Return Period: 2 Year
Tuesday, 09 / 1 / 2020 1.10
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 1
Pre Dev DA North
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 2 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 4.000 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 3.59 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
2.00
1.00
Pre Dev DA North
Hyd. No. 1 -- 2 Year
120 240 360 480 600 720 840 960
Hyd No. 1
Tuesday, 09 / 1 / 2020
= 1.616 cfs
= 734 min
= 8,911 cuft
= 61
= 338 ft
= 30.10 min
= Type II
= 484
Q (crs)
2.00
1.00
' ' 0.00
1080 1200 1320 1440 1560
Time (min)
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Hyd. No. 3
Pre Dev South 1
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 2 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 1.750 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 3.59 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
2.00
1.00
Pre Dev South 1
Hyd. No. 3 -- 2 Year
120 240 360 480 600 720 840 960
Hyd No. 3
Tuesday, 09 / 1 / 2020
= 1.437 cfs
= 721 min
= 3,899 cuft
= 61
= 75 ft
= 8.60 min
= Type II
= 484
Q (cfs)
2.00
1.00
'I I 1 0.00
1080 1200 1320 1440 1560
Time (min)
1.12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 4
Pre Dev South 2
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 2 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 49.290 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 3.59 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
28.00
24.00
20.00
16.00
12.00
AM
4.00
A
Pre Dev South 2
Hyd. No. 4 -- 2 Year
Tuesday, 09 / 1 / 2020
= 26.26 cfs
= 728 min
= 114,033 cult
= 61.4
= 2693 ft
= 21.30 min
= Type II
= 484
Q (cfs)
28.00
24.00
20.00
16.00
12.00
4.00
0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 4 Time (min)
1.13
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 5
Pre Dev South Total
Hydrograph type
= Combine
Peak discharge
= 26.91 cfs
Storm frequency
= 2 yrs
Time to peak
= 728 min
Time interval
= 1 min
Hyd. volume
= 117,932 cuft
Inflow hyds.
= 3, 4
Contrib. drain. area
= 51.040 ac
Q (Cfs)
28.00
24.00
20.00
16.00
12.00
AM
4.00
Pre Dev South Total
Hyd. No. 5 -- 2 Year
Q (Cfs)
28.00
24.00
20.00
16.00
12.00
4.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 5 —Hyd No. 3 —Hyd No. 4 Time (min)
1.14
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 7
Post Dev DA to Det Basin #1
Hydrograph type
= SCS Runoff
Peak discharge
= 10.41 cfs
Storm frequency
= 2 yrs
Time to peak
= 728 min
Time interval
= 1 min
Hyd. volume
= 37,189 cuft
Drainage area
= 5.750 ac
Curve number
= 81
Basin Slope
= 0.0 %
Hydraulic length
= 991 ft
Tc method
= TR55
Time of conc. (Tc)
= 25.10 min
Total precip.
= 3.59 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (Cfs)
12.00
10.00
. M
4.00
2.00
Post Dev DA to Det Basin #1
Hyd. No. 7 -- 2 Year
Q (cfs)
12.00
10.00
: 11
M
4.00
2.00
0.00 ' I I- ' ' . 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 7 Time (min)
1.15
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 8
Det Basin #1 Routed
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 2 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Inflow hyd. No.
= 7 - Post Dev DA to Det
Basin Max. Elevation
Reservoir name
= Detention Basin
Max. Storage
Storage Indication method used.
Det Basin #1 Routed
Tuesday, 09 / 1 / 2020
= 2.624 cfs
= 752 min
= 37,179 cult
= 1074.52 ft
= 14,794 cuft
Q (Cfs) Hyd. No. 8 -- 2 Year Q (Cfs)
12.00 12.00
10.00 10.00
8.00 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 - 0.00
0 180 360 540 720 900 1080 1260 1440 1620 1800 1980 2160
Hyd No. 8 —Hyd No. 7 ®Total storage used = 14,794 cuff Time (min)
1.16
Pond Report
Hydraflow Hydrographs Extension for Autodesi Civil 31 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Pond No. 1 - Detention Basin1
Pond Data
Contours -User-defined contour areas.
Conic method used for volume calculation. Begining
Elevation - 1071.00 ft
Stage / Storage Table
Stage (ft) Elevation (ft)
Contour area (si
Incr.
Storage (cult)
Total storage (cult)
0.00 1071.00
2,870
0
0
1.00 1072.00
3,569
3,213
3,213
2.00 1073.00
4,324
3,940
7,153
3.00 1074.00
5,136
4,724
11,877
4.00 1075.00
6,070
5,596
17,473
5.00 1076.00
7,079
6,567
24,040
6.00 1077.00
8,162
7,613
31,653
7.00 1078.00
9,318
8,733
40,386
8.00 1079.00
10,549
9,926
50,312
9.00 1080.00
11,853
11,194
61,506
Culvert / Orifice Structures
Weir Structures
[A]
[B] [C] [PrfRsr]
[A] [B]
[C] [D]
Rise (in) = 18.00
2.00 7.50 0.00
Crest Len (ft)
= 9.42 Inactive
30.00 0.00
Span (in) = 18.00
2.00 7.50 0.00
Crest El. (ft)
= 1076.70 0.00
1077.75 0.00
No. Barrels = 1
1 1 0
Weir Coeff.
= 2.60 3.33
3.33 3.33
Invert El. (ft) = 1070.40
1070.50 1071.50 0.00
Weir Type
= 1 Rect
Broad --
Length (ft) = 60.00
0.00 0.00 0.00
Multi -Stage
= Yes Yes
No No
Slope I%) = 1.00
0.00 0.00 n/a
N-Value = .012
.012 .013 n/a
Orifice Coeff. = 0.60
0.60 0.60 0.60
Exfil.(in/hr)
= 0.000 (by Contour)
Multi -Stage = n/a
Yes Yes No
TW Elev. (ft)
= 0.00
Note: Culven/Onfiw outfiovs are analyzed under inlet (ic) and outlet (oc) wntrol. Weir risers checked for orifice waditions (ic) and submergence (a).
Stage / Storage / Discharge Table
Stage Storage Elevation
CIvA CMS
CIvC
PrfRsr WrA
WrB WrC
WrD Exfil User
Total
ft cuft ft
cis cfs
cfs
cfs cis
cfs cfs
cfs cfs cfs
ofs
0.00 0 1071.00
0.00 0.00
0.00
-- 0.00
--- 0.00
- --- -
0.000
1.00 3,213 1072.00
1.78 is 0.11 is
0.63 is
-- 0.00
--- 0.00
- -- -
0.739
2.00 7,153 1073.00
1.78 is 0.15 is
1.61 is
-- 0.00
-- 0.00
- -- -
1.758
3.00 11,877 1074.00
2.37 is 0.18 is
2.18 is
-- 0.00
-- 0.00
- -- -
2.363
4.00 17,473 1075.00
2.88 is 0.21 is
2.64 is
-- 0.00
-- 0.00
- -- -
2.842
5.00 24,040 1076.00
3.26 is 0.23 is
3.02 is
-- 0.00
-- 0.00
- -- -
3.252
6.00 31,653 1077.00
7.57 oc 0.24 is
3.31 is
-- 4.03
-- 0.00
- -- -
7.566
7.00 40,386 1078.00
21.90 is 0.05 is
0.70 is
-- 21.15
s -- 12.49
- -- --
34.39
8.00 50,312 1079.00
23.76 is 0.02 is
0.34 is
-- 23.38
s -- 139.61
- -- --
163.36
9.00 61,506 1080.00
25.28 is 0.02 is
0.22 is
-- 25.01
s -- 337.16
- -- --
362.41
1.17
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 10
Post Dev South 2
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 2 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 49.290 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 3.59 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
28.00
24.00
20.00
16.00
12.00
AM
4.00
Post Dev South 2
Hyd. No. 10 -- 2 Year
Tuesday, 09 / 1 / 2020
= 24.68 cfs
= 732 min
= 120,298 cuft
= 62.2
= 2693 ft
= 25.70 min
= Type II
= 484
Q (cfs)
28.00
24.00
20.00
16.00
12.00
4.00
I I I I I I I I I 0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 10 Time (min)
1.18
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 11
Post Dev South Total
Hydrograph type
= Combine
Peak discharge
= 26.89 cfs
Storm frequency
= 2 yrs
Time to peak
= 732 min
Time interval
= 1 min
Hyd. volume
= 157,477 cuft
Inflow hyds.
= 8, 10
Contrib. drain. area
= 49.290 ac
Q (Cfs)
28.00
24.00
20.00
16.00
12.00
AM
4.00
Post Dev South Total
Hyd. No. 11 -- 2 Year
Q (Cfs)
28.00
24.00
20.00
16.00
12.00
4.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 11 —Hyd No. 8 —Hyd No. 10 Time (min)
1.19
Hydrograph Report
HydraFlow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020 Tuesday, 09 / 1 / 2020
Hyd. No. 13
Sheet flow to Bypass Channel
Hydrograph type
= SCS Runoff
Peak discharge
= 0.661 cfs
Storm frequency
= 2 yrs
Time to peak
= 719 min
Time interval
= 1 min
Hyd. volume
= 1,539 cult
Drainage area
= 0.670 ac
Curve number
= 61
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= User
Time of cone. (Tc)
= 6.00 min
Total precip.
= 3.59 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Sheet flow to Bypass Channel
Q (efs) Hyd. No. 13 -- 2 Year Q (cfs)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
000
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 13 Time (min)
1.20
Hydrograph Summary Re p oftHydraflow Hydrographs Extension for Autodesk® Civil 3DO 2019 by Autodesk, Inc. v2020
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(CIS)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuff)
Inflow
hyd(s)
Maximum
elevation
M
Total
strge used
(cufl)
Hydrograph
Description
1
SCS Runoff
1.138
1
737
7,017
Pre Dev Project Area
2
SCS Runoff
8.522
1
737
52,552
Pre Dev B Remainder
8
Combine
9.660
1
737
59,569
1, 2,
Pre Dev Total
10
SCS Runoff
2.638
1
735
12,690
Post Dev Project Area
11
SCS Runoff
8.522
1
737
52,552
Post Dev B Remainder
13
Combine
11.14
1
737
65,242
10, 11,
Total Drainage to B
14
Reservoir
6.168
1
761
65,239
13
868.45
10,648
Post Dev POA B Routed
Drainage Area B REV 9.gpw
Return Period: 2 Year
Tuesday, 09 / 1 / 2020 1.21
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 1
Pre Dev Project Area
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 2 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 3.150 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 3.59 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
2.00
1.00
Pre Dev Project Area
Hyd. No. 1 -- 2 Year
120 240 360 480 600 720 840 960
Hyd No. 1
Tuesday, 09 / 1 / 2020
= 1.138 cfs
= 737 min
= 7,017 cuft
= 61
= Oft
= 35.50 min
= Type II
= 484
Q (crs)
2.00
1.00
' 0.00
1080 1200 1320 1440 1560
Time (min)
1.22
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 2
Pre Dev B Remainder
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 2 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 23.590 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 3.59 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
10.00
tt
. M
4.00
M ul
Pre Dev B Remainder
Hyd. No. 2 -- 2 Year
Tuesday, 09 / 1 / 2020
= 8.522 cfs
= 737 min
= 52,552 cult
= 61
= Oft
= 34.40 min
= Type II
= 484
Q (Cfs)
10.00
E1
lllll. tr
4.00
2.00
0.00 ' I I I I
' ' ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 2 Time (min)
1.23
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 8
Pre Dev Total
Hydrograph type
= Combine
Peak discharge
= 9.660 cfs
Storm frequency
= 2 yrs
Time to peak
= 737 min
Time interval
= 1 min
Hyd. volume
= 59,569 cuft
Inflow hyds.
= 1, 2
Contrib. drain. area
= 26.740 ac
Q (cfs)
10.00
tt
. M
4.00
M rl
0.00
0 120 240
Hyd No. 8
360 480 600
— Hyd No. 1
Pre Dev Total
Hyd. No. 8 -- 2 Year
720
Q (Cfs)
10.00
MI
4.00
2.00
0.00
840 960 1080 1200 1320 1440 1560
— Hyd No. 2 Time (min)
1.24
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Hyd. No. 10
Post Dev Project Area
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 2 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 3.150 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 3.59 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
3.00
2.00
1.00
Post Dev Project Area
Hyd. No. 10 -- 2 Year
120 240 360 480 600 720 840 960
Hyd No. 10
Tuesday, 09 / 1 / 2020
= 2.638 cfs
= 735 min
= 12,690 cuft
= 70.8
= Oft
= 35.50 min
= Type II
= 484
Q (Cfs)
3.00
2.00
1.00
' ' � ' 0.00
1080 1200 1320 1440 1560
Time (min)
1.25
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 11
Post Dev B Remainder
Hydrograph type
= SCS Runoff
Peak discharge
= 8.522 cfs
Storm frequency
= 2 yrs
Time to peak
= 737 min
Time interval
= 1 min
Hyd. volume
= 52,552 cuft
Drainage area
= 23.590 ac
Curve number
= 61
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= TR55
Time of conc. (Tc)
= 34.40 min
Total precip.
= 3.59 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
10.00
AI
. M
4.00
`rI
Post Dev B Remainder
Hyd. No. 11 -- 2 Year
Q (cfs)
10.00
M
4.00
2.00
0.00 ' I I I I
' ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 11 Time (min)
1.26
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 13
Total Drainage to B
Hydrograph type
= Combine
Peak discharge
= 11.14 cfs
Storm frequency
= 2 yrs
Time to peak
= 737 min
Time interval
= 1 min
Hyd. volume
= 65,242 cuft
Inflow hyds.
= 10, 11
Contrib. drain. area
= 26.740 ac
Total Drainage to B
Q (Cfs) Hyd. No. 13 -- 2 Year Q (Crs)
12.00 12.00
10.00 10.00
8.00 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 13 —Hyd No. 10 —Hyd No. 11 Time (min)
1.27
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 14
Post Dev POA B Routed
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 2 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Inflow hyd. No.
= 13 - Total Drainage to B
Max. Elevation
Reservoir name
= Det Basin 2
Max. Storage
Storage Indication method used.
Q (cfs)
12.00
10.00
.Im
4.00
r tr
Post Dev POA B Routed
Hyd. No. 14 -- 2 Year
Tuesday, 09 / 1 / 2020
= 6.168 cfs
= 761 min
= 65,239 cuft
= 868.45 ft
= 10,648 tuft
Q (cfs)
12.00
10.00
. tt
4.00
2.00
I I I I I �I I I I I - 0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 14 —Hyd No. 13 ®Total storage used = 10,648 cuff Time (min)
1.28
Hydrograph Summary Re p oftHydraflow Hydrogrephs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(CIS)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuff)
Inflow
hyd(s)
Maximum
elevation
M
Total
strge used
(cufl)
Hydrograph
Description
1
SCS Runoff
5.337
1
732
23,272
Pre Dev DA North
3
SCS Runoff
4.385
1
720
10,182
Pre Dev South 1
4
SCS Runoff
83.84
1
727
294,955
Pre Dev South 2
5
Combine
85.88
1
727
305,138
3,4
Pre Dev South Total
7
SCS Runoff
19.48
1
728
69,368
Post Dev DA to Det Basin #1
8
Reservoir
4.300
1
753
69,359
7
1076.80
30,113
Det Basin #1 Routed
10
SCS Runoff
76.53
1
730
305,359
Post Dev South 2
11
Combine
79.49
1
730
374,718
8,10
Post Dev South Total
13
SCS Runoff
1.969
1
718
4,020
Sheet flow to Bypass Channel
Drainage Area A REV 9- LKP.gpw
Return Period: 10 Year
Tuesday, 09 / 1 / 2020 1.29
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 1
Pre Dev DA North
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 4.000 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 5.38 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
6.00
5.00
4.00
3.00
2.00
1.00
Pre Dev DA North
Hyd. No. 1 -- 10 Year
Tuesday, 09 / 1 / 2020
= 5.337 cfs
= 732 min
= 23,272 cult
= 61
= 338 ft
= 30.10 min
= Type II
= 484
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
0.00 ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 1 Time (min)
1.30
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 3
Pre Dev South 1
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 1.750 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 5.38 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
5.00
4.00
OM
r tr
1.00
Pre Dev South 1
Hyd. No. 3 -- 10 Year
Tuesday, 09 / 1 / 2020
= 4.385 cfs
= 720 min
= 10,182 cuft
= 61
= 75 ft
= 8.60 min
= Type II
= 484
Q (cfs)
5.00
4.00
3.00
2.00
1.00
0.00 , - 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 3 Time (min)
1.31
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 4
Pre Dev South 2
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 49.290 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 5.38 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
90.00
70.00
50.00
40.00
30.00
20.00
10.00
Pre Dev South 2
Hyd. No. 4 -- 10 Year
Tuesday, 09 / 1 / 2020
= 83.84 cfs
= 727 min
= 294,955 cult
= 61.4
= 2693 ft
= 21.30 min
= Type II
= 484
Q (cfs)
90.00
MINOR
30.00
Wz1luv1
10.00
0.00 ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 4 Time (min)
1.32
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 5
Pre Dev South Total
Hydrograph type
= Combine
Peak discharge
= 85.88 cfs
Storm frequency
= 10 yrs
Time to peak
= 727 min
Time interval
= 1 min
Hyd. volume
= 305,138 cult
Inflow hyds.
= 3, 4
Contrib. drain. area
= 51.040 ac
Pre Dev South Total
Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs)
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
000
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 5 —Hyd No. 3 —Hyd No. 4 Time (min)
1.33
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 7
Post Dev DA to Det Basin #1
Hydrograph type
= SCS Runoff
Peak discharge
= 19.48 cfs
Storm frequency
= 10 yrs
Time to peak
= 728 min
Time interval
= 1 min
Hyd. volume
= 69,368 cuft
Drainage area
= 5.750 ac
Curve number
= 81
Basin Slope
= 0.0 %
Hydraulic length
= 991 ft
Tc method
= TR55
Time of conc. (Tc)
= 25.10 min
Total precip.
= 5.38 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (Cfs)
21.00
15.00
12.00
. M
3.00
Post Dev DA to Det Basin #1
Hyd. No. 7 -- 10 Year
Q (cfs)
21.00
18.00
15.00
12.00
• to
M
3.00
0.00 ' ' ' ' 1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 7 Time (min)
1.34
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 3D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 8
Det Basin #1 Routed
Hydrograph type
= Reservoir
Peak discharge
= 4.300 cfs
Storm frequency
= 10 yrs
Time to peak
= 753 min
Time interval
= 1 min
Hyd. volume
= 69,359 cuft
Inflow hyd. No.
= 7 - Post Dev DA to Det
Basin Max. Elevation
= 1076.80 ft
Reservoir name
= Detention Basin
Max. Storage
= 30,113 cuft
Storage Indication method used.
Q (cfs
21.00
11
15.00
12.00
. �9
3.00
Det Basin #1 Routed
Hyd. No. 8 -- 10 Year
Q (cfs)
21.00
18.00
15.00
12.00
• PO
3.00
0.00 0.00
0 180 360 540 720 900 1080 1260 1440 1620 1800 1980
— Hyd No. 8 —Hyd No. 7 II I� Total storage used = 30,113 cult Time (min)
1.35
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 10
Post Dev South 2
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 49.290 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 5.38 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
80.00
70.00
50.00
40.00
30.00
20.00
10.00
Post Dev South 2
Hyd. No. 10 -- 10 Year
Tuesday, 09 / 1 / 2020
= 76.53 cfs
= 730 min
= 305,359 cult
= 62.2
= 2693 ft
= 25.70 min
= Type II
= 484
Q (cfs)
80.00
70.00
20.00
10.00
0.00 ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 10 Time (min)
1.36
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 11
Post Dev South Total
Hydrograph type
= Combine
Peak discharge
= 79.49 cfs
Storm frequency
= 10 yrs
Time to peak
= 730 min
Time interval
= 1 min
Hyd. volume
= 374,718 cuft
Inflow hyds.
= 8, 10
Contrib. drain. area
= 49.290 ac
Q (cfs)
80.00
70.00
.t �t
50.00
40.00
30.00
20.00
10.00
Post Dev South Total
Hyd. No. 11 -- 10 Year
Q (cfs)
80.00
70.00
20.00
10.00
0.00 — 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 11 —Hyd No. 8 —Hyd No. 10 Time (min)
1.37
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 13
Sheet flow to Bypass Channel
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 0.670 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= User
Time of cons. (Tc)
Total precip.
= 5.38 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
2.00
1.00
Sheet flow to Bypass Channel
Hyd. No. 13 -- 10 Year
Tuesday, 09 / 1 / 2020
= 1.969 cfs
= 718 min
= 4,020 cuft
= 61
= Oft
= 6.00 min
= Type II
= 484
120 240 360 480 600 720 840 960 1080 1200 1320 1440
Hyd No. 13
Q (crs)
2.00
1.00
- 0.00
1560
Time (min)
1.38
Hydrograph Summary Re p oftHydraflow Hydrographs Extension for Autodesk® Civil 3DO 2019 by Autodesk, Inc. v2020
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(CIS)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuff)
Inflow
hyd(s)
Maximum
elevation
M
Total
strge used
(CUR)
Hydrograph
Description
1
SCS Runoff
3.771
1
736
18,327
Pre Dev Project Area
2
SCS Runoff
28.24
1
736
137,249
Pre Dev B Remainder
4
SCS Runoff
10.82
1
731
46,636
Subarea to Cross Section A Predev
5
SCS Runoff
12.94
1
736
67,244
Subarea to Cross Section B Predev
6
SCS Runoff
19.66
1
733
91,453
Subarea to Cross Section C Pre Dev
8
Combine
32.01
1
736
155,575
1, 2,
Pre Dev Total
10
SCS Runoff
6.079
1
735
27,336
Post Dev Project Area
11
SCS Runoff
28.24
1
736
137,249
Post Dev B Remainder
13
Combine
34.31
1
735
164,584
10, 11,
Total Drainage to B
14
Reservoir
28.58
1
746
164,581
13
872.16
31,600
Post Dev POA B Routed
16
SCS Runoff
12.43
1
730
51,701
Subarea to Cross Section A Post Dev
17
SCS Runoff
14.39
2
736
73,699
Subarea to Cross Section B Postdev
18
SCS Runoff
22.59
1
733
101,385
Subarea to Cross Section C Postdev
Drainage Area B REV 9.gpw
Return Period: 10 Year
Tuesday, 09 / 1 / 2020 1.39
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 1
Pre Dev Project Area
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 3.150 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 5.38 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
4.00
3.00
2.00
1.00
0.00
0 120 240
Hyd No. 1
Pre Dev Project Area
Hyd. No. 1 -- 10 Year
360 480 600 720 840
Tuesday, 09 / 1 / 2020
= 3.771 cfs
= 736 min
= 18,327 cult
= 61
= Oft
= 35.50 min
= Type II
= 484
Q (Cfs)
4.00
3.00
2.00
1.00
' ' ' ' 0.00
960 1080 1200 1320 1440 1560
Time (min)
too
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 2
Pre Dev B Remainder
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 23.590 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 5.38 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
Pre Dev B Remainder
Hyd. No. 2 -- 10 Year
Tuesday, 09 / 1 / 2020
= 28.24 cfs
= 736 min
= 137,249 cuft
= 61
= Oft
= 34.40 min
= Type II
= 484
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
0.00 ' I I I I I I I I I 1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 2 Time (min)
1.41
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 4
Subarea to Cross Section A Predev
Hydrograph type
= SCS Runoff
Peak discharge
= 10.82 cfs
Storm frequency
= 10 yrs
Time to peak
= 731 min
Time interval
= 1 min
Hyd. volume
= 46,636 cuft
Drainage area
= 9.710 ac
Curve number
= 57
Basin Slope
= 19.0 %
Hydraulic length
= 872 ft
Tc method
= TR55
Time of conc. (Tc)
= 26.60 min
Total precip.
= 5.38 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (Cfs)
12.00
10.00
. M
4.00
2.00
Subarea to Cross Section A Predev
Hyd. No. 4 -- 10 Year
Q (cfs)
12.00
10.00
: 11
M
4.00
2.00
0.00 ' I I I I
' 'I I I N 10.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 4 Time (min)
1.42
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 5
Subarea to Cross Section B Predev
Hydrograph type
= SCS Runoff
Peak discharge
= 12.94 cfs
Storm frequency
= 10 yrs
Time to peak
= 736 min
Time interval
= 1 min
Hyd. volume
= 67,244 cuft
Drainage area
= 14.110 ac
Curve number
= 57
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= TR55
Time of conc. (Tc)
= 33.90 min
Total precip.
= 5.38 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (Cfs)
14.00
12.00
10.00
Ml
4.00
2.00
Subarea to Cross Section B Predev
Hyd. No. 5 -- 10 Year
Q (cfs)
14.00
12.00
10.00
IN
ffle
4.00
2.00
0.00 ' " 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 5 Time (min)
1.43
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 6
Subarea to Cross Section C Pre Dev
Hydrograph type
= SCS Runoff
Peak discharge
= 19.66 cfs
Storm frequency
= 10 yrs
Time to peak
= 733 min
Time interval
= 1 min
Hyd. volume
= 91,453 cuft
Drainage area
= 19.190 ac
Curve number
= 57
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= TR55
Time of conc. (Tc)
= 29.50 min
Total precip.
= 5.38 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
21.00
15.00
12.00
. M
3.00
Subarea to Cross Section C Pre Dev
Hyd. No. 6 -- 10 Year
Q (Cfs)
21.00
18.00
15.00
12.00
• to
M
3.00
0.00 ' I I I I
' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 6 Time (min)
1.44
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 8
Pre Dev Total
Hydrograph type
= Combine
Peak discharge
= 32.01 cfs
Storm frequency
= 10 yrs
Time to peak
= 736 min
Time interval
= 1 min
Hyd. volume
= 155,575 cuft
Inflow hyds.
= 1, 2
Contrib. drain. area
= 26.740 ac
Q (cfs
35.00
30.00
25.00
20.00
15.00
10.00
5.00
Q (cfs)
35.00
FC 11
25.00
20.00
15.00
10.00
5.00
0.00 10.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 8 —Hyd No. 1 —Hyd No. 2 Time (min)
1.45
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 10
Post Dev Project Area
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 3.150 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 5.38 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
7.00
. 1,
5.00
4.00
3.00
2.00
1.00
Post Dev Project Area
Hyd. No. 10 -- 10 Year
Tuesday, 09 / 1 / 2020
= 6.079 cfs
= 735 min
= 27,336 cult
= 70.8
= Oft
= 35.50 min
= Type II
= 484
Q (Crs)
7.00
. tt
5.00
4.00
3.00
2.00
1.00
' ' ' ' ' 0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 10 Time (min)
1.46
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 11
Post Dev B Remainder
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 23.590 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 5.38 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
Post Dev B Remainder
Hyd. No. 11 -- 10 Year
Tuesday, 09 / 1 / 2020
= 28.24 cfs
= 736 min
= 137,249 cuft
= 61
= Oft
= 34.40 min
= Type II
= 484
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
0.00 ' I I I I I I I I I 1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 11 Time (min)
1.47
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 13
Total Drainage to B
Hydrograph type
= Combine
Peak discharge
= 34.31 cfs
Storm frequency
= 10 yrs
Time to peak
= 735 min
Time interval
= 1 min
Hyd. volume
= 164,584 cuft
Inflow hyds.
= 10, 11
Contrib. drain. area
= 26.740 ac
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
Total Drainage to B
Hyd. No. 13 -- 10 Year
Q (cfs)
35.00
25.00
20.00
15.00
10.00
5.00
J ' 0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 13 —Hyd No. 10 —Hyd No. 11 Time (min)
1.48
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 14
Post Dev POA B Routed
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Inflow hyd. No.
= 13 - Total Drainage to B
Max. Elevation
Reservoir name
= Det Basin 2
Max. Storage
Storage Indication method used.
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
Post Dev POA B Routed
Hyd. No. 14 -- 10 Year
Tuesday, 09 / 1 / 2020
= 28.58 cfs
= 746 min
= 164,581 cuft
= 872.16 ft
= 31,600 cuft
Q (cfs)
35.00
25.00
20.00
15.00
10.00
5.00
I I I I I I I I 0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 14 —Hyd No. 13 ®Total storage used = 31,600 cuff Time (min)
1.49
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 16
Subarea to Cross Section A Post Dev
Hydrograph type
= SCS Runoff
Peak discharge
= 12.43 cfs
Storm frequency
= 10 yrs
Time to peak
= 730 min
Time interval
= 1 min
Hyd. volume
= 51,701 cuft
Drainage area
= 9.710 ac
Curve number
= 59
Basin Slope
= 19.0 %
Hydraulic length
= 872 ft
Tc method
= TR55
Time of conc. (Tc)
= 26.60 min
Total precip.
= 5.38 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
14.00
12.00
10.00
1.111I01
14111611
4.00
2.00
Subarea to Cross Section A Post Dev
Hyd. No. 16 -- 10 Year
Q (cfs)
14.00
12.00
10.00
IN
ffle
4.00
2.00
0.00 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 16 Time (min)
1.50
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 17
Subarea to Cross Section B Postdev
Hydrograph type
= SCS Runoff
Peak discharge
= 14.39 cfs
Storm frequency
= 10 yrs
Time to peak
= 736 min
Time interval
= 2 min
Hyd. volume
= 73,699 cuft
Drainage area
= 14.110 ac
Curve number
= 59
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= TR55
Time of conc. (Tc)
= 33.90 min
Total precip.
= 5.38 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (cfs)
15.00
12.00
• 11
. 11
R 11
0.00
0 120 240
Hyd No. 17
Subarea to Cross Section B Postdev
Hyd. No. 17 -- 10 Year
360 480 600 720 840 960
Q (cfs)
15.00
12.00
• 11
99111A1
' ' 0.00
1080 1200 1320 1440 1560
Time (min)
1.51
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 18
Subarea to Cross Section C Postdev
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 19.190 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 5.38 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
24.00
20.00
16.00
12.00
4.00
Subarea to Cross Section C Postdev
Hyd. No. 18 -- 10 Year
Tuesday, 09 / 1 / 2020
= 22.59 cfs
= 733 min
= 101,385 cult
= 59
= Oft
= 29.50 min
= Type II
= 484
Q (crs)
24.00
20.00
16.00
12.00
4.00
I I I I I. I I I I I II N 1
0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 18 Time (min)
1.52
Hydrograph Summary Re p oftHydraflow Hydrogrephs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(CIS)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuff)
Inflow
hyd(s)
Maximum
elevation
M
Total
strge used
(cufl)
Hydrograph
Description
1
SCS Runoff
14.29
1
732
57,773
Pre Dev DA North
3
SCS Runoff
11.17
1
720
25,276
Pre Dev South 1
4
SCS Runoff
219.74
1
726
727,409
Pre Dev South 2
5
Combine
225.56
1
726
752,685
3,4
Pre Dev South Total
7
SCS Runoff
36.83
1
728
133,499
Post Dev DA to Det Basin #1
8
Reservoir
28.33
1
736
133,489
7
1077.91
39,623
Det Basin #1 Routed
10
SCS Runoff
198.07
1
729
743,399
Post Dev South 2
11
Combine
218.46
1
730
876,888
8,10
Post Dev South Total
13
SCS Runoff
4.962
1
718
9,979
Sheet flow to Bypass Channel
Drainage Area A REV 9- LKP.gpw
Return Period: 100 Year
Tuesday, 09 / 1 / 2020 1.53
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 1
Pre Dev DA North
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 100 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 4.000 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 8.69 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
15.00
12.00
• 11
. 11
Pre Dev DA North
Hyd. No. 1 -- 100 Year
Tuesday, 09 / 1 / 2020
= 14.29 cfs
= 732 min
= 57,773 cult
= 61
= 338 ft
= 30.10 min
= Type II
= 484
Q (Cfs)
15.00
12.00
llllll• 11
. 11
3.00
0.00 ' I I I
' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 1 Time (min)
1.54
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 3
Pre Dev South 1
Hydrograph type
= SCS Runoff
Peak discharge
= 11.17 cfs
Storm frequency
= 100 yrs
Time to peak
= 720 min
Time interval
= 1 min
Hyd. volume
= 25,276 cuft
Drainage area
= 1.750 ac
Curve number
= 61
Basin Slope
= 0.0 %
Hydraulic length
= 75 ft
Tc method
= TR55
Time of conc. (Tc)
= 8.60 min
Total precip.
= 8.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (Cfs)
12.00
10.00
. M
4.00
2.00
Pre Dev South 1
Hyd. No. 3 -- 100 Year
Q (cfs)
12.00
10.00
: 11
M
4.00
2.00
0.00 ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 3 Time (min)
1.55
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 4
Pre Dev South 2
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 100 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 49.290 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 8.69 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
240.00
210.00
150.00
120.00
30.00
Pre Dev South 2
Hyd. No. 4 -- 100 Year
Tuesday, 09 / 1 / 2020
= 219.74 cfs
= 726 min
= 727,409 cuft
= 61.4
= 2693 ft
= 21.30 min
= Type II
= 484
Q (Cfs)
240.00
210.00
180.00
150.00
120.00
30.00
0.00 ' 1 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 4 Time (min)
1.56
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 5
Pre Dev South Total
Hydrograph type
= Combine
Peak discharge
= 225.56 cfs
Storm frequency
= 100 yrs
Time to peak
= 726 min
Time interval
= 1 min
Hyd. volume
= 752,685 cuft
Inflow hyds.
= 3, 4
Contrib. drain. area
= 51.040 ac
Q (cfs)
240.00
210.00
150.00
120.00
30.00
Pre Dev South Total
Hyd. No. 5 -- 100 Year
Q (Cfs)
240.00
210.00
180.00
150.00
120.00
30.00
0.00 " — 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 5 —Hyd No. 3 —Hyd No. 4 Time (min)
1.57
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 7
Post Dev DA to Det Basin #1
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 100 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 5.750 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 8.69 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
40.00
30.00
20.00
10.00
0.00
0 120 240
Hyd No. 7
Post Dev DA to Det Basin #1
Hyd. No. 7 -- 100 Year
360 480 600 720 840
Tuesday, 09 / 1 / 2020
= 36.83 cfs
= 728 min
= 133,499 cult
= 81
= 991 ft
= 25.10 min
= Type II
= 484
Q (cfs)
40.00
20.00
10.00
960 1080 1200 1320 1440 1560
Time (min)
1.58
Hydrograph Report
Hydragow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 8
Det Basin #1 Routed
Hydrograph type
= Reservoir
Peak discharge
= 28.33 cfs
Storm frequency
= 100 yrs
Time to peak
= 736 min
Time interval
= 1 min
Hyd. volume
= 133,489 cult
Inflow hyd. No.
= 7 - Post Dev DA to Det
Basin Max. Elevation
= 1077.91 ft
Reservoir name
= Detention Basin
Max. Storage
= 39,623 cult
Storage Indication method used
Q (cfs)
40.00
30.00
20.00
10.00
0.00
0 120 240
Hyd No. 8
Det Basin #1 Routed
Hyd. No. 8 -- 100 Year
360 480 600
— Hyd No. 7
720
Q (cfs)
40.00
20.00
10.00
'I I I 10.00
840 960 1080 1200 1320 1440 1560
® Total storage used = 39,623 cult Time (min)
1.59
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 10
Post Dev South 2
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 100 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 49.290 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 8.69 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (Cfs)
210.00
180.00
150.00
120.00
30.00
Post Dev South 2
Hyd. No. 10 -- 100 Year
Tuesday, 09 / 1 / 2020
= 198.07 cfs
= 729 min
= 743,399 cult
= 62.2
= 2693 ft
= 25.70 min
= Type II
= 484
Q (Cis)
210.00
180.00
150.00
120.00
0.00 ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 10 Time (min)
1.60
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 11
Post Dev South Total
Hydrograph type
= Combine
Peak discharge
= 218.46 cfs
Storm frequency
= 100 yrs
Time to peak
= 730 min
Time interval
= 1 min
Hyd. volume
= 876,888 cuft
Inflow hyds.
= 8, 10
Contrib. drain. area
= 49.290 ac
Q (cfs)
240.00
210.00
150.00
120.00
30.00
Post Dev South Total
Hyd. No. 11 -- 100 Year
Q (Cfs)
240.00
210.00
180.00
150.00
120.00
30.00
0.00 ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 11 — Hyd No. 8 — Hyd No. 10 Time (min)
1.61
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 13
Sheet flow to Bypass Channel
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 100 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 0.670 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= User
Time of cons. (Tc)
Total precip.
= 8.69 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
5.00
4.00
OM
r tr
1.00
0.00
0 120 240
Hyd No. 13
Sheet flow to Bypass Channel
Hyd. No. 13 -- 100 Year
360 480 600 720 840
Tuesday, 09 / 1 / 2020
= 4.962 cfs
= 718 min
= 9,979 cuft
= 61
= Oft
= 6.00 min
= Type II
= 484
Q (cfs)
5.00
4.00
3.00
2.00
1.00
' — - 0.00
960 1080 1200 1320 1440 1560
Time (min)
1.62
Hydrograph Summary Re p oftHydraflow Hydrographs Extension for Autodesk® Civil 3DO 2019 by Autodesk, Inc. v2020
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(CIS)
Time
interval
(min)
Time to
Peak
(min)
Hyd.
volume
(cuff)
Inflow
hyd(s)
Maximum
elevation
M
Total
strge used
(cufl)
Hydrograph
Description
1
SCS Runoff
10.15
1
735
45,497
Pre Dev Project Area
2
SCS Runoff
76.01
1
735
340,719
Pre Dev B Remainder
8
Combine
86.16
1
735
386,215
1, 2,
Pre Dev Total
10
SCS Runoff
13.35
1
734
58,997
Post Dev Project Area
11
SCS Runoff
76.01
1
735
340,719
Post Dev B Remainder
13
Combine
89.34
1
735
399,716
10, 11,
Total Drainage to B
14
Reservoir
88.10
1
737
399,713
13
873.40
41,864
Post Dev POA B Routed
Drainage Area B REV 9.gpw
Return Period: 100 Year
Tuesday, 09 / 1 / 2020 1.63
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 1
Pre Dev Project Area
Hydrograph type
= SCS Runoff
Peak discharge
= 10.15 cfs
Storm frequency
= 100 yrs
Time to peak
= 735 min
Time interval
= 1 min
Hyd. volume
= 45,497 cuft
Drainage area
= 3.150 ac
Curve number
= 61
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= TR55
Time of conc. (Tc)
= 35.50 min
Total precip.
= 8.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (Cfs)
12.00
10.00
. M
4.00
2.00
Pre Dev Project Area
Hyd. No. 1 -- 100 Year
Q (cfs)
12.00
10.00
: 11
M
4.00
2.00
0.00 ' ' ' ' ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 1 Time (min)
1.64
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 2
Pre Dev B Remainder
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 100 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 23.590 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 8.69 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
80.00
70.00
50.00
40.00
30.00
20.00
10.00
Pre Dev B Remainder
Hyd. No. 2 -- 100 Year
Tuesday, 09 / 1 / 2020
= 76.01 cfs
= 735 min
= 340,719 cuft
= 61
= Oft
= 34.40 min
= Type II
= 484
Q (cfs)
80.00
70.00
20.00
10.00
0.00 ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 2 Time (min)
1.65
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 8
Pre Dev Total
Hydrograph type
= Combine
Peak discharge
= 86.16 cfs
Storm frequency
= 100 yrs
Time to peak
= 735 min
Time interval
= 1 min
Hyd. volume
= 386,215 cuft
Inflow hyds.
= 1, 2
Contrib. drain. area
= 26.740 ac
Pre Dev Total
Q (cfs) Hyd. No. 8 -- 100 Year Q (cfs)
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
000
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
— Hyd No. 8 —Hyd No. 1 —Hyd No. 2 Time (min)
1.66
Hydrograph Report
Hydraflow Hydrographs Extension for AutodeskO Civil 31D9 2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 10
Post Dev Project Area
Hydrograph type
= SCS Runoff
Peak discharge
= 13.35 cfs
Storm frequency
= 100 yrs
Time to peak
= 734 min
Time interval
= 1 min
Hyd. volume
= 58,997 cuft
Drainage area
= 3.150 ac
Curve number
= 70.8
Basin Slope
= 0.0 %
Hydraulic length
= 0 ft
Tc method
= TR55
Time of conc. (Tc)
= 35.50 min
Total precip.
= 8.69 in
Distribution
= Type II
Storm duration
= 24 hrs
Shape factor
= 484
Q (Cfs)
14.00
12.00
10.00
: MM
NO
4.00
2.00
Post Dev Project Area
Hyd. No. 10 -- 100 Year
Q (cfs)
14.00
12.00
10.00
IN
ffle
4.00
2.00
0.00 — 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 10 Time (min)
1.67
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 11
Post Dev B Remainder
Hydrograph type
= SCS Runoff
Peak discharge
Storm frequency
= 100 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Drainage area
= 23.590 ac
Curve number
Basin Slope
= 0.0 %
Hydraulic length
Tc method
= TR55
Time of conc. (Tc)
Total precip.
= 8.69 in
Distribution
Storm duration
= 24 hrs
Shape factor
Q (cfs)
80.00
70.00
50.00
40.00
30.00
20.00
10.00
Post Dev B Remainder
Hyd. No. 11 -- 100 Year
Tuesday, 09 / 1 / 2020
= 76.01 cfs
= 735 min
= 340,719 cuft
= 61
= Oft
= 34.40 min
= Type II
= 484
Q (cfs)
80.00
70.00
20.00
10.00
0.00 ' 0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 11 Time (min)
1.68
Hydrograph Report
HydraFlow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Tuesday, 09 / 1 / 2020
Hyd. No. 13
Total Drainage to B
Hydrograph type
= Combine
Peak discharge
= 89.34 cfs
Storm frequency
= 100 yrs
Time to peak
= 735 min
Time interval
= 1 min
Hyd. volume
= 399,716 cult
Inflow hyds.
= 10, 11
Contrib. drain. area
= 26.740 ac
Total Drainage to B
60.00
■
���tti�� ■ ����tti��
30.00
20.00
IN
1.69
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020
Hyd. No. 14
Post Dev POA B Routed
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 100 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Inflow hyd. No.
= 13 - Total Drainage to B
Max. Elevation
Reservoir name
= Det Basin 2
Max. Storage
Storage Indication method used.
Tuesday, 09 / 1 / 2020
= 88.10 cfs
= 737 min
= 399,713 cult
= 873.40 ft
= 41,864 cuft
Post Dev POA B Routed
Q (cfs) Q (cfs)
Hyd. No. 14 -- 100 Year
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
000
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 14 —Hyd No. 13 ®Total storage used = 41,864 cuff Time (min)
1.70
WATER QUALITY
�;T1I;14'1►�10
/orlh,
Section 2
D(Q Vlrglnb Rwo/f ReEUMon MttMJNew Cevebpmenr(nmptlorue 5preulaM1M - Version"
C 3DIIBBV SrMWdsaMSrytllbr3Ms 0 M13 Drab BMV Standar aM Sp CIB-Ram
holett Xame: Hillcrest T& V DIM MID-00039
pare: 7131120H
BMPDe415pen(uofionsb"n: 20UDran Hds&Specs
Site Information
Project (Treatment Volume and Loads)
ConMants
an immeri
<3
ngmmerl
10a
rvrelTelEM[�vgli!
Oi6
ge1l111—.1 imMu
i96
aeli.t."f i
p.m
own �d
ps6
�nslWl
Rrest/Oi¢n Span Guerlaeresi
16W
me
,g FB' OS6JB
in Velume�abiuheti 30)31
3P bai Rb/yrl ]S.SC
WE0 ed I11.16
Weighted M ff—A)
003
66%
nagetliurf Couer Wresi
8fd
WeighR P it' i
0.10
%Managed Tud
1]%
Imper.innxvrerlaoexl
au
R.limpereinnel
p95
%imgemwa
12%
S[eArez have)
39.1a
mMaun uVa ells
luex
alulrtionalls
2.1
Virginia Runotf Reduction Method Woiksheet
DEQ Virginia Runoff Reduction Method New Development Compliance Spreadsheet - Version 3.0
BMP Design Specifications List: 2013 Draft Stds & Specs
Site Summary Project Title: Hillcrest T & V WPO 2019-00039
Date: 43677
Total Rainfall = 43 inches
Site Land Cover Summary
A soils
BSoils
CSoils
DSoils
Totals
% Total
Forest/Open (acres)
0.00
26.00
0.00
0.00
26.00
66
Managed Turf (acres)
1 0.00
8.60
0.00
0.00
8.60
22
Impervious Cover(acres)
1 0.00
4.54
0.00
0.00
4.54
12
39.14
100
Site Tv and Land Cover Nutrient Loads
Site Rv
0.17
Treatment Volume its
24,731
TP Load (lb/yr)
15.54
TN Load (lb/yr)
111.16
Total TP Load Reduction Required (lb/yr) -0.51 ** TP LOAD REDUCNON NOT REQUIRED
Site Compliance Summary
Total Runoff Volume Reduction (fts)
0
Total TP Load Reduction Achieved (lb/yr)
0.00
Total TN Load Reduction Achieved (Ib/yr)
0.00
Remaining Post Development TP Load
15.54
(Ib/yr)
Remaining TP Load Reduction (lb/yr)
0.00
Required
** TARGET TP REDUCTION EXCEEDED BY 0.51 LB/YEAR **
--------------------------------------------------------------------------------------
2.2
Summary Pont
Virginia Ruuoif Reduction Method Woiksheet
--------------------------------------------------------------------------------------------------------------------------------------------------------
Runoff Volume and CN Calculations
1- earstorm 2- earstorm 10- earstorm
ITarget Rainfall Event in 2.97 3.59 5.38
Drainage Areas
RV&CN
Drainage Area
Drainage Area
Drainage Area
Drainage Area
Drainage Area
CN
0
0
0
0
0
RR fta
0
0
0
0
0
1-year return period
RV wo RR (an -in)
0.00
0.00
0.00
0.00
0.00
Rvw RR(wa-in)
0.00
0.00
0.00
0.00
0.00
M adjumd
0
0
0
0
0
2-year return period
W wo RR(wain)
0.00
0.00
0.00
0.00
0.00
RVwRR(wa-in)
0.00
0.00
0.00
0.00
0.00
M adjumd
0
0
0
0
0
10-year return period
W wo RR(wain)
0.00
0.00
0.00
0.00
0.00
RVwRR(wr-in)
0.00
0.00
0.W
0.00
0.00
M adjumd
0
0
0
0
0
2.3
Summary Print
RUNOFF SUMMARIES AND
ENERGY BALANCE
�;T1I;14'1►�10
iOvlh'
Section 3
Point of Analysis Al
DA A South 2
Acreage
Land Cover
Curve Number
Pre -Development
Post -Development
Existing Impervious Area
98
0.35
0.51
Forest
58
32.21
32.05
Open Space
61
6.26
6.26
Vineyard
74
10.47
10.47
Composite Curve Number
1
61.4
62.2
Total Area
I 49.29
acres
Pre -Development Drainage Area A North
Land Cover
Curve Number
Acreage
New Impervious Area
98
0.00
Forest
58
0.00
Open Space
61
4.00
Vineyard
74
0.00
Composite Curve Number
61.0
Total Area
4.00
acres
Pre -Development DA A South 1
Land Cover
Curve Number
Acreage
New Impervious Area
98
0.00
Forest
58
0.00
Open Space
61
1.75
Vineyard
74
0.00
Composite Curve Number
61.00
Total Area
I 1.75
acres
Post -Development DA To Det Basin #1
Land Cover
Curve Number
Acreage
New Impervious Area
98
3.11
Forest
58
0.00
Open Space
61
2.64
Vineyard
74
0.00
Composite Curve Number
81.0
Total Area
5.75
acres
3.1
Point of Analysis B TOTAL
Acreage
Land Cover
Curve Number
Pre -Development
Post -Development
New Impervious Area
98
0.84
Forest
58
10.18
10.18
Open Space
61
7.31
6.47
Vineyard
74
9.25
9.25
Composite Curve Number
64.41
65.5
Total Area
I 26.74
acres
New Development
Acreage
Land Cover
Curve Number
Pre -Development
Post -Development
New Impervious Area
98
0.84
Forest
58
0.00
0.00
Open Space
61
3.15
2.31
Vineyard
74
0.00
0.00
Composite Curve Number
61.0
70.8
Total Area
I 3.15
acres
Poing of Analysis B Remainder
Acreage
Energy Balance POA B
Land Cover
Curve Number
Pre -Development
Post -Development
Pre -Development Flowrate
0.515
cfs
New Impervious Area
98
0.00
Pre -Development Volume
4046
cu.ft
Forest
58
10.18
Improvement Factor
0.8
Open Space
61
4.16
Post -Development Volume
8393
cu.ft
Vineyard
74
9.25
Post -Development Max. Flowrate
0.199
cfs
Composite Curve Number
64.8
Remainder Flowrate
3.858
cfs
Total Area
I 23.59
acres
IPOA B Discharge Flowrate
I 4.057
cfs
3.2
CHANNEL, CULVERT & WEIR
REPORTS
/0w1h,
Section 4
Channel Report
Hydraflow ExpreSS Extension for Autodesk® Civil 300 by Autodesk, Inc.
Ditch W - Upper
Section 10-yr Storm
Trapezoidal
Bottom Width (ft)
= 11.00
Side Slopes (z:1)
= 4.00, 4.00
Total Depth (ft)
= 0.50
Invert Elev (ft)
= 1035.00
Slope (%)
= 28.50
N-Value
= 0.030
Calculations
Compute by:
Known Q
Known Q (cfs)
= 1.70
Elev (ft) Section
1036.00
1035.75
1035.50
1035.25
1035.00
1034.75
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
Tuesday, Sep 1 2020
= 0.05
= 1.700
= 0.56
= 3.04
= 11.41
= 0.09
= 11.40
= 0.19
2 4 6 8 10 12 14 16 18 20
4.1
Reach (ft)
Depth (ft)
1.00
0.75
0.50
0.25
r rr
_n �r
Channel Report
Hydraflow Express Extension for Autodesk® Civil 300 by Autodesk, Inc.
Ditch 'A' - Lower
Section 10-yr Storm
Trapezoidal
Bottom Width (ft)
= 11.00
Side Slopes (z:1)
= 4.00, 4.00
Total Depth (ft)
= 0.50
Invert Elev (ft)
= 1050.00
Slope (%)
= 28.50
N-Value
= 0.033
Calculations
Compute by:
Known Q
Known Q (cfs)
= 8.59
Elev (ft) Section
1051.00
1050.75
1050.50
1050.25
1050.00
1049.75
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
Thursday, Aug 6 2020
= 0.13
= 8.590
= 1.50
= 5.74
= 12.07
= 0.26
= 12.04
= 0.64
2 4 6 8 10 12 14 16 18 20
4.2
Reach (ft)
Depth (ft)
1.00
0.75
0.50
0.25
r rr
_n �r
Channel Report
Hydraflow Express Extension for Autodesk® Civil 300 by Autodesk, Inc.
Ditch 'B', 2-year Channel Protection Analysis
Trapezoidal
Bottom Width (ft)
= 4.00
Side Slopes (z:1)
= 2.00, 2.00
Total Depth (ft)
= 1.00
Invert Elev (ft)
= 1024.00
Slope (%)
= 10.00
N-Value
= 0.040
Calculations
Compute by:
Known Q
Known Q (cfs)
= 5.90
Elev (ft) Section
1026.00
1025.50
1025.00
1024.50
1024.00
1023.50
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
Thursday, Aug 6 2020
= 0.29
= 5.900
= 1.33
= 4.44
= 5.30
= 0.39
= 5.16
= 0.60
Depth (ft)
2.00
1.50
1.00
0.50
t tt
I I I I I I I I I 1 1 -0.50
0 1 2 3 4 5 6 7 8 9 10
4.3
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® Civil 300 by Autodesk, Inc.
Ditch 'B', 10-year
Capacity Analysis
Trapezoidal
Bottom Width (ft)
= 4.00
Side Slopes (z:1)
= 2.00, 2.00
Total Depth (ft)
= 1.00
Invert Elev (ft)
= 1024.00
Slope (%)
= 10.00
N-Value
= 0.040
Calculations
Compute by:
Known Q
Known Q (cfs)
= 12.34
Elev (ft) Section
1026.00
1025.50
1025.00
1024.50
1024.00
1023.50
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
Thursday, Aug 6 2020
= 0.44
= 12.34
= 2.15
= 5.75
= 5.97
= 0.60
= 5.76
= 0.95
Depth (ft)
2.00
1.50
1.00
0.50
t tt
I I I I I I I I I 1 1 -0.50
0 1 2 3 4 5 6 7 8 9 10
4.4
Reach (ft)
Channel Report
HydraBow Express Extension for Autodesk® Civil 300 by Autodesk, Inc.
Ditch 'C' Section A -A 2yr Storm Pre Development
User -defined
Highlighted
Invert Elev (ft) = 964.00
Depth (ft)
Slope (%) = 19.00
Q (cfs)
N-Value = 0.090
Area (sqft)
Velocity (ft/s)
Calculations
Wetted Perim (ft)
Compute by: Known Q
Crit Depth, Yc (ft)
Known Q (cfs) = 2.54
Top Width (ft)
EGL (ft)
(Sta, El, n)-(Sta, El, n)...
(0.00, 972.00}(18.00, 968.00, 0.090)-(37.00, 964.00, 0.090)-(51.00, 968.00, 0.090)-(65.00, 972.00, 0.090)
Monday, Aug 31 2020
= 0.48
= 2.541
= 0.95
= 2.67
= 4.08
= 0.48
= 3.96
= 0.59
•.• 11 Ii��li�li�����I��li�� 11
-5
0
5
10
15
20
25
30 35
40
45
50
55
60
65
70
4.5
Sta (ft)
Channel Report
HydraBow Express Extension for Autodesk® Civil 300 by Autodesk, Inc.
Ditch 'C' Section A -A 2yr Storm Post Development
User -defined
Highlighted
Invert Elev (ft) = 964.00
Depth (ft)
Slope (%) = 19.00
Q (cfs)
N-Value = 0.090
Area (sqft)
Velocity (ft/s)
Calculations
Wetted Perim (ft)
Compute by: Known Q
Crit Depth, Yc (ft)
Known Q (cfs) = 3.36
Top Width (ft)
EGL (ft)
(Sta, El, n)-(Sta, El, n)...
(0.00, 972.00}(18.00, 968.00, 0.090)-(37.00, 964.00, 0.090)-(51.00, 968.00, 0.090)-(65.00, 972.00, 0.090)
Monday, Aug 31 2020
= 0.53
= 3.360
= 1.16
= 2.90
= 4.50
= 0.53
= 4.37
= 0.66
•.• 11 Ii��li�li�����I��li�� 11
-5
0
5
10
15
20
25
30 35
40
45
50
55
60
65
70
4.6
Sta (ft)
Channel Report
HydraBow Express Extension for Autodesk® Civil 300 by Autodesk, Inc.
Ditch 'C' Section A -A 10yr Storm Pre Development
User -defined
Highlighted
Invert Elev (ft) = 964.00
Depth (ft)
Slope (%) = 19.00
Q (cfs)
N-Value = 0.090
Area (sqft)
Velocity (ft/s)
Calculations
Wetted Perim (ft)
Compute by: Known Q
Crit Depth, Yc (ft)
Known Q (cfs) = 10.82
Top Width (ft)
EGL (ft)
(Sta, El, n)-(Sta, El, n)...
(0.00, 972.00}(18.00, 968.00, 0.090)-(37.00, 964.00, 0.090)-(51.00, 968.00, 0.090)-(65.00, 972.00, 0.090)
Monday, Aug 31 2020
= 0.83
= 10.82
= 2.84
= 3.81
= 7.05
= 0.85
= 6.85
= 1.06
•.• 11 Ii��li�li�����I��li�� 11
-5
0
5
10
15
20
25
30 35
40
45
50
55
60
65
70
4.7
Sta (ft)
Channel Report
HydraBow Express Extension for Autodesk® Civil 300 by Autodesk, Inc.
Ditch 'C' Section A -A 10yr Storm Post Development
User -defined
Highlighted
Invert Elev (ft) = 964.00
Depth (ft)
Slope (%) = 19.00
Q (cfs)
N-Value = 0.090
Area (sqft)
Velocity (ft/s)
Calculations
Wetted Perim (ft)
Compute by: Known Q
Crit Depth, Yc (ft)
Known Q (cfs) = 12.43
Top Width (ft)
EGL (ft)
(Sta, El, n)-(Sta, El, n)...
(0.00, 972.00}(18.00, 968.00, 0.090)-(37.00, 964.00, 0.090)-(51.00, 968.00, 0.090)-(65.00, 972.00, 0.090)
Monday, Aug 31 2020
= 0.87
= 12.43
= 3.12
= 3.98
= 7.39
= 0.90
= 7.18
= 1.12
•.• 11 Ii��li�li�����I��li�� 11
-5
0
5
10
15
20
25
30 35
40
45
50
55
60
65
70
4.8
Sta (ft)
Channel Report
HydraBow Express Extension for Autodesk® Civil 300 by Autodesk, Inc.
Monday, Aug 31 2020
Ditch V Section B-B Tyr Storm Pre Development
User -defined
Highlighted
Invert Elev (ft) = 921.00
Depth (ft)
= 0.34
Slope (%) = 23.50
Q (cfs)
= 3.050
N-Value = 0.090
Area (sqft)
= 1.21
Velocity (ft/s)
= 2.53
Calculations
Wetted Perim (ft)
= 6.16
Compute by: Known Q
Crit Depth, Yc (ft)
= 0.35
Known Q (cfs) = 3.05
Top Width (ft)
= 6.10
EGL (ft)
= 0.44
(Sta, El, n)-(Sta, El, n)...
(0.00, 928.00}(11.00, 924.00, 0.090}(22.00, 921.00, 0.090}(23.00, 921.00, 0.090)-(57.00, 924.00, 0.090)-(85.00, 928.00, 0.090)
Elev (ft)
929.00
928.00
927.00
926.00
925.00
924.00
923.00
922.00
921.00
920.00
-10
Section
0 10 20 30 40 50 60 70 80
Sta (ft)
Depth (ft)
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
-1.00
90 100
4.9
Channel Report
HydraBow ExpreSS Extension for Autodesk® Civil 300 by Autodesk, Inc.
Tuesday, Sep 1 2020
Ditch V Section B-B Tyr Storm Post Development
User -defined
Highlighted
Invert Elev (ft) = 921.00
Depth (ft) =
0.37
Slope (%) = 23.50
Q (cfs) =
3.876
N-Value = 0.090
Area (sqft) =
1.40
Velocity (ft/s) =
2.78
Calculations
Wetted Perim (ft) =
6.62
Compute by: Known Q
Crit Depth, Yc (ft) =
0.38
Known Q (cfs) = 3.88
Top Width (ft) =
6.55
EGL (ft) =
0.49
(Sta, El, n)-(Sta, El, n)...
(0.00, 928.00}(11.00, 924.00, 0.090}(22.00, 921.00, 0.090}(23.00, 921.00, 0.090)-(57.00, 924.00, 0.090)-(85.00, 928.00, 0.090)
Elev (ft)
929.00
928.00
927.00
926.00
925.00
924.00
923.00
922.00
921.00
920.00
-10
Section
0 10 20 30 40 50 60 70 80
Sta (ft)
Depth (ft)
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
-1.00
90 100
4.10
Channel Report
HydraBow Express Extension for Autodesk® Civil 300 by Autodesk, Inc.
Monday, Aug 31 2020
Ditch V Section B-B 10yr Storm Pre Development
User -defined
Highlighted
Invert Elev (ft) = 921.00
Depth (ft)
= 0.61
Slope (%) = 23.50
Q (cfs)
= 12.94
N-Value = 0.090
Area (sqft)
= 3.40
Velocity (ft/s)
= 3.81
Calculations
Wetted Perim (ft)
= 10.26
Compute by: Known Q
Crit Depth, Yc (ft)
= 0.66
Known Q (cfs) = 12.94
Top Width (ft)
= 10.15
EGL (ft)
= 0.84
(Sta, El, n)-(Sta, El, n)...
(0.00, 928.00}(11.00, 924.00, 0.090}(22.00, 921.00, 0.090}(23.00, 921.00, 0.090)-(57.00, 924.00, 0.090)-(85.00, 928.00, 0.090)
Elev (ft)
929.00
928.00
927.00
926.00
925.00
924.00
923.00
922.00
921.00
920.00
-10
Section
0 10 20 30 40 50 60 70 80
Sta (ft)
Depth (ft)
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
-1.00
90 100
4.11
Channel Report
HydraBow Express Extension for Autodesk® Civil 300 by Autodesk, Inc.
Monday, Aug 31 2020
Ditch V Section B-B 10yr Storm Post Development
User -defined
Highlighted
Invert Elev (ft) = 921.00
Depth (ft)
= 0.64
Slope (%) = 23.50
Q (cfs)
= 14.39
N-Value = 0.090
Area (sqft)
= 3.71
Velocity (ft/s)
= 3.88
Calculations
Wetted Perim (ft)
= 10.71
Compute by: Known Q
Crit Depth, Yc (ft)
= 0.69
Known Q (cfs) = 14.39
Top Width (ft)
= 10.60
EGL (ft)
= 0.87
(Sta, El, n)-(Sta, El, n)...
(0.00, 928.00}(11.00, 924.00, 0.090}(22.00, 921.00, 0.090}(23.00, 921.00, 0.090)-(57.00, 924.00, 0.090)-(85.00, 928.00, 0.090)
Elev (ft)
929.00
928.00
927.00
926.00
925.00
924.00
923.00
922.00
921.00
920.00
-10
Section
0 10 20 30 40 50 60 70 80
Sta (ft)
Depth (ft)
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
-1.00
90 100
4.12
Channel Report
HydraBow ExpreSS Extension for Autodesk® Civil 300 by Autodesk, Inc.
Tuesday, Sep 1 2020
Ditch V Section C-C Tyr Storm Pre Development
User -defined
Highlighted
Invert Elev (ft) = 879.58
Depth (ft)
= 0.40
Slope (%) = 20.60
Q (cfs)
= 4.618
N-Value = 0.090
Area (sqft)
= 1.91
Velocity (ft/s)
= 2.42
Calculations
Wetted Perim (ft)
= 9.56
Compute by: Known Q
Crit Depth, Yc (ft)
= 0.40
Known Q (cfs) = 4.62
Top Width (ft)
= 9.52
EGL (ft)
= 0.49
(Sta, El, n)-(Sta, El, n)...
(0.00, 888.00)-(31.00, 884.00, 0.090)-(72.00, 880.00, 0.090)-(77.00, 879.58, 0.090)-(82.00, 880.00, 0.090)-(103.00, 884.00, 0.090)-(126.00, 888.00, 0.090)
Elev (ft) Section
889.00
887.00
885.00
883.00
881.00
879.00
t
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
4.13
Depth (ft)
9.42
7.42
5.42
3.42
1.42
-0.58
-� IQ
Sta (ft)
Channel Report
HydraBow ExpreSS Extension for Autodesk® Civil 300 by Autodesk, Inc.
Tuesday, Sep 1 2020
Ditch V Section C-C Tyr Storm Post Development
User -defined
Highlighted
Invert Elev (ft) = 879.58
Depth (ft)
= 0.44
Slope (%) = 20.60
Q (cfs)
= 6.095
N-Value = 0.090
Area (sqft)
= 2.30
Velocity (ft/s)
= 2.65
Calculations
Wetted Perim (ft)
= 10.35
Compute by: Known Q
Crit Depth, Yc (ft)
= 0.44
Known Q (cfs) = 6.10
Top Width (ft)
= 10.31
EGL (ft)
= 0.55
(Sta, El, n)-(Sta, El, n)...
(0.00, 888.00)-(31.00, 884.00, 0.090)-(72.00, 880.00, 0.090)-(77.00, 879.58, 0.090)-(82.00, 880.00, 0.090)-(103.00, 884.00, 0.090)-(126.00, 888.00, 0.090)
Elev (ft) Section
889.00
887.00
885.00
883.00
881.00
879.00
t
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
4.14
Depth (ft)
9.42
7.42
5.42
3.42
1.42
-0.58
-� IQ
Sta (ft)
Channel Report
HydraBow ExpreSS Extension for Autodesk® Civil 300 by Autodesk, Inc.
Tuesday, Sep 1 2020
Ditch V Section C-C 10yr Storm Pre Development
User -defined
Highlighted
Invert Elev (ft) = 879.58
Depth (ft)
= 0.68
Slope (%) = 20.60
Q (cfs)
= 19.66
N-Value = 0.090
Area (sqft)
= 5.22
Velocity (ft/s)
= 3.76
Calculations
Wetted Perim (ft)
= 14.10
Compute by: Known Q
Crit Depth, Yc (ft)
= 0.71
Known Q (cfs) = 19.66
Top Width (ft)
= 14.03
EGL (ft)
= 0.90
(Sta, El, n)-(Sta, El, n)...
(0.00, 888.00)-(31.00, 884.00, 0.090)-(72.00, 880.00, 0.090)-(77.00, 879.58, 0.090)-(82.00, 880.00, 0.090)-(103.00, 884.00, 0.090)-(126.00, 888.00, 0.090)
Elev (ft) Section
889.00
887.00
885.00
883.00
881.00
879.00
t
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
4.15
Depth (ft)
9.42
7.42
5.42
3.42
1.42
-0.58
-� IQ
Sta (ft)
Channel Report
HydraBow ExpreSS Extension for Autodesk® Civil 300 by Autodesk, Inc.
Tuesday, Sep 1 2020
Ditch V Section C-C 10yr Storm Post Development
User -defined
Highlighted
Invert Elev (ft) = 879.58
Depth (ft)
= 0.72
Slope (%) = 20.60
Q (cfs)
= 22.59
N-Value = 0.090
Area (sqft)
= 5.80
Velocity (ft/s)
= 3.90
Calculations
Wetted Perim (ft)
= 14.73
Compute by: Known Q
Crit Depth, Yc (ft)
= 0.75
Known Q (cfs) = 22.59
Top Width (ft)
= 14.65
EGL (ft)
= 0.96
(Sta, El, n)-(Sta, El, n)...
(0.00, 888.00)-(31.00, 884.00, 0.090)-(72.00, 880.00, 0.090)-(77.00, 879.58, 0.090)-(82.00, 880.00, 0.090)-(103.00, 884.00, 0.090)-(126.00, 888.00, 0.090)
Elev (ft) Section
889.00
887.00
885.00
883.00
881.00
879.00
t
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
4.16
Depth (ft)
9.42
7.42
5.42
3.42
1.42
-0.58
-� IQ
Sta (ft)
Culvert Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Aug 6 2020
18 inch Culvert P1, 2-year Analysis
Invert Elev Dn (ft)
= 1027.00
Calculations
Pipe Length (ft)
= 50.00
Qmin (cfs)
= 1.27
Slope (%)
= 3.00
Qmax (cfs)
= 1.27
Invert Elev Up (ft)
= 1028.50
Tailwater Elev (ft)
= (dc+D)/2
Rise (in)
= 18.0
Shape
= Circular
Highlighted
Span (in)
= 18.0
Qtotal (cfs)
= 1.27
No. Barrels
= 1
Qpipe (cfs)
= 1.27
n-Value
= 0.012
Qovertop (cfs)
= 0.00
Culvert Type
= Circular Corrugate Metal Pipe
Veloc Dn (ft/s)
= 1.06
Culvert Entrance
= Projecting
Veloc Up (ft/s)
= 3.12
Coeff. K,M,c,Y,k
= 0.034, 1.5, 0.0553, 0.54, 0.9
HGL Dn (ft)
= 1027.96
HGL Up (ft)
= 1028.92
Embankment
Hw Elev (ft)
= 1029.07
Top Elevation (ft)
= 1032.00
Hw/D (ft)
= 0.38
Top Width (ft)
= 20.00
Flow Regime
= Inlet Control
Crest Width (ft)
= 20.00
Elev (ft)
1033.D0
1032.00
1031.00
1030.OD
1029.DD
1028.00
i1fMA62]
18 inch Culvert P1, 2-yearAnalysis
Hw Depth (ft)
T 4.60
3.60
2.60
1.50
110.50
-0.50
-1.50
1026.00 1 i i i i i i i i i-2.50
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
Circular Culvert HGL Embank
Reach (ft) 4.17
Culvert Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Aug 6 2020
18 inch Culvert P1, 10-year Capacity Analysis
Invert Elev Dn (ft)
= 1027.00
Calculations
Pipe Length (ft)
= 50.00
Qmin (cfs)
= 2.59
Slope (%)
= 3.00
Qmax (cfs)
= 2.59
Invert Elev Up (ft)
= 1028.50
Tailwater Elev (ft)
= (dc+D)/2
Rise (in)
= 18.0
Shape
= Circular
Highlighted
Span (in)
= 18.0
Qtotal (cfs)
= 2.59
No. Barrels
= 1
Qpipe (cfs)
= 2.59
n-Value
= 0.012
Qovertop (cfs)
= 0.00
Culvert Type
= Circular Corrugate Metal Pipe
Veloc Dn (ft/s)
= 1.95
Culvert Entrance
= Projecting
Veloc Up (ft/s)
= 3.84
Coeff. K,M,c,Y,k
= 0.034, 1.5, 0.0553, 0.54, 0.9
HGL Dn (ft)
= 1028.06
HGL Up (ft)
= 1029.11
Embankment
Hw Elev (ft)
= 1029.38
Top Elevation (ft)
= 1032.00
Hw/D (ft)
= 0.59
Top Width (ft)
= 20.00
Flow Regime
= Inlet Control
Crest Width (ft)
= 20.00
Elev (ft)
1033.00
1032.00
1031.00
1030.OD
1029.00
1028.00
tnrxAr:,t
1026.00
18 inch Culvert P1, 70-year Capacity Analysis
Hw Depth (ft)
,
r
F
J�=
■�
■■r
�•1111111011
_
0 5 10 15 20 25 30 35 40
— Circular Culvert HGL Embank
45 50 55 60 65 70
Reach (ft) 4.18
Culvert Report
Hydraflow Express Extension for Autodesk® Civil 3138 by Autodesk, Inc. Tuesday, Sep 1 2020
15inch CMP Pipe From Flow Bypass Structure to Level Spreader 10yr Storm
Invert Elev Dn (ft)
= 1063.00
Calculations
Pipe Length (ft)
= 18.00
Qmin (cfs)
= 2.30
Slope (%)
= 33.33
Qmax (cfs)
= 6.00
Invert Elev Up (ft)
= 1069.00
Tailwater Elev (ft)
= Crown
Rise (in)
= 15.0
Shape
= Circular
Highlighted
Span (in)
= 15.0
Qtotal (cfs)
= 4.30
No. Barrels
= 1
Qpipe (cfs)
= 4.30
n-Value
= 0.012
Qovertop (cfs)
= 0.00
Culvert Type
= Circular Pipe,
Veloc Dn (ft/s)
= 3.50
Beveled Ring Entrance
Veloc Up (ft/s)
= 4.91
Culvert Entrance
= 45D bevels
HGL Dn (ft)
= 1064.25
Coeff. K,M,c,Y,k
= 0.0018, 2.5, 0.03, 0.74, 0.2
HGL Up (ft)
= 1069.84
Hw Elev (ft)
= 1070.05
Embankment
Hw/D (ft)
= 0.84
Top Elevation (ft)
= 1071.80
Flow Regime
= Inlet Control
Top Width (ft)
= 12.00
Crest Width (ft)
= 6.00
11 l"
INn MP Plp From Flo B/p n Sbu um b Level Spra I Sb,m
x.prpmml
Rs M
Weir Report
Hydraflow Express Extension for Autodesk® Civil 31D® by Autodesk, Inc.
Basin 1 Outlet Flow Bypass Structure 100-year Flow Analysis
Rectangular Weir
Highlighted
Crest
= Sharp
Depth (ft)
Bottom Length (ft)
= 6.25
Q (cfs)
Total Depth (ft)
= 1.00
Area (sqft)
Velocity (ft/s)
Calculations
Top Width (ft)
Weir Coeff. Cw
= 3.33
Compute by:
Known Q
Known Q (cfs)
= 16.85
Depth (ft)
2.00
1.50
1.00
0.50
M
-0.50
Basin 1 Outlet Flow Bypass Structure 100-year Flow Analysis
Tuesday, Sep 1 2020
= 0.87
= 16.85
= 5.43
= 3.10
= 6.25
Depth (ft)
2.00
1.50
1.00
0.50
M
-0.50
Weir W.S.
Length (ft)