HomeMy WebLinkAboutSDP201900068 Correspondence 2020-09-17I® COLLINS ENGINEERING
September 11, 2020
Tori Kanellopoulos
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Spring Hill Village Road plans (SDP 201900068)
20o GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902
��434.293.3719 PH 434.293.2813 FX
www.coll ns-eng ineeri ng.com
Thank you for your comments dated July 21, 2020 on the above referenced project. Below are our responses to the remaining
comments on the road plans.
Planning:
1. Comment addressed
2. Comment addressed
3. Comment addressed
4. Comment addressed
5. Comment addressed
6. MY private street easement has been labeled on all the sheets.
7. Comment addressed
8. The multi -use sport court is shown and labeled on the site plan. In addition, sheet 15 has been added to show the layout of the
recreation amenities and details for the equipment.
9. Comment addressed
10. The signed resolution for the Special Exception rig has been added to sheet SA, as requested.
11. a. All the easements have been coordinated with the approved and recorded subdivision plat.
c. The easement across lot 100 has been updated to match the record plat.
d. All easements have been added to the utility sheets and all easements have been updated and coordinated with the record
plat.
f. The private utility easements in front of lots 25-29 have been updated and are not located within the building area.
g. The landscaping easements have been updated to match the record plat and the ARB plans for final approval.
h. The recordation information for the onsite and offsite easements have been added to site plan.
j. The private street is labeled on all plan sheets, and the private street maintenance agreements have been recorded with the
subdivision plat.
12. The offsite and onsite sewer and water system has been bonded with the subdivision plat.
12. The landscaping along Rt 20 and Rt.742 has been updated to be located outside/SO' away from the powerlines. The
landscaping plan is complete in accordance with ARB review and approvals.
13. Comment addressed
14. Comment addressed
15. Comment addressed
16. The WPO is approved and bonded. The road plans are approved and bonded.
17. Comment addressed
18. Comment addressed
19. A note has been added to the grading sheet 8 indicating that the steps shall be replaced.
Engineering:
1. WPO is approved and bonded.
2. Road plans are approved and bonded.
3. Comment addressed.
4. Comment addressed.
5. Comment addressed.
6. Comment addressed
7. Comment addressed
8. Retaining wall easements have been recorded.
9. Comment addressed.
ARB
10. Comment addressed
11. Comment addressed.
12. Comment addressed
13. Comment addressed.
14. Comment addressed.
15. The WPO plan shows the landscaping in the dry swales for the project. A note has been added to the landscaping sheets
indicating that the dry Swale landscaping is shown and part of the WPO plans. The dry swale landscaping is bonded under
the WPO plan.
16. The landscaping has been coordinated with the project and ARB and engineering to ensure there is no large trees over the
underground storage pipes.
1. The plan has been resubmitted for approval with ARB.
ACSA
1. Plans are approved and bonded.
Should you have any questions, please feel free to contact Scott Collins at scott(d)collins-eneineerine.com.
Sincerely,
Scott Collins, PE