HomeMy WebLinkAboutWPO201600034 Correspondence 2020-09-22i® COLLINS ENGINEERING
September 9, 2020
Matt Wentland, PE
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902
(�434.293.3719 PH 434.293.2813 FX
www.coll ns-eng ineeri ng.com
RE: Greenloft Farm VSMP Amendment #1(Amendment #1 to WPO 201600034)
Thank you for your comments dated July 301h on the above -referenced project, as well as your feedback
provided on September 2nd in an e-mail correspondence to Mr. Murray of Collins Engineering. The updated
plans reflect changes to address your comments and the e-mail as described below:
A. Stormwater Pollution Prevention Plan (SWPPP)
1. This comment is acknowledged. The SWPPP and PPP will be updated onsite following approval.
C. Stormwater Management Plan (SWMP)
1. This comment was discussed in detail during a Zoom meeting held on August 111h, and in a
summarizing e-mail exchange later that day between County Engineering and Mr. Murray of Collins
Engineering. As a result of this meeting, sheet 10A was added to the plans addressing this comment.
Please note, in a follow-up e-mail dated September 2nd sheet 10A was unofficially reviewed and it
was determined the riprap lined channel should extend further to a more defined channel. The
attached plans dated September 91h show this extension.
D. Erosion and Sediment Control Plan (ESOP)
1. Sheet 10A was added to the plans to address this comment. Erosion and sediment control measures
are now provided for the disturbances associated with the asbuilt culvert and proposed ditch.
Should you have any questions during your approval of this plan, please feel free to contact me at
graham@collins-engineering.com.
Sincerely,
Graham Murray, PE