Loading...
HomeMy WebLinkAboutWPO201600034 Correspondence 2020-09-22i® COLLINS ENGINEERING September 9, 2020 Matt Wentland, PE Department of Community Development 401 McIntire Road Charlottesville, VA 22902 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 (�434.293.3719 PH 434.293.2813 FX www.coll ns-eng ineeri ng.com RE: Greenloft Farm VSMP Amendment #1(Amendment #1 to WPO 201600034) Thank you for your comments dated July 301h on the above -referenced project, as well as your feedback provided on September 2nd in an e-mail correspondence to Mr. Murray of Collins Engineering. The updated plans reflect changes to address your comments and the e-mail as described below: A. Stormwater Pollution Prevention Plan (SWPPP) 1. This comment is acknowledged. The SWPPP and PPP will be updated onsite following approval. C. Stormwater Management Plan (SWMP) 1. This comment was discussed in detail during a Zoom meeting held on August 111h, and in a summarizing e-mail exchange later that day between County Engineering and Mr. Murray of Collins Engineering. As a result of this meeting, sheet 10A was added to the plans addressing this comment. Please note, in a follow-up e-mail dated September 2nd sheet 10A was unofficially reviewed and it was determined the riprap lined channel should extend further to a more defined channel. The attached plans dated September 91h show this extension. D. Erosion and Sediment Control Plan (ESOP) 1. Sheet 10A was added to the plans to address this comment. Erosion and sediment control measures are now provided for the disturbances associated with the asbuilt culvert and proposed ditch. Should you have any questions during your approval of this plan, please feel free to contact me at graham@collins-engineering.com. Sincerely, Graham Murray, PE Collins Engineering