Loading...
HomeMy WebLinkAboutWPO201600034 Plan - VSMP 2020-09-22A A GL'NLRAL -/yoF S:- OWNER WRIGHT 104, LLC 707 EAST JEFFERSON STREET CHARLOTTESVILLE,VA 22902 ENGINEER COLLINS ENGINEERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE,VA 22902 434.293.3719 TAX MAP PARCELS & NUMBER OF POSSIBLE LOTS T.M.P. 89-25 44.87 ACRES + 5 DEV. LOTS T.M.P. 101-2 45.85 ACRES + 0 DEV. LOTS T.M.P. 101-2A1 45.85 ACRES + 5 DEV. LOTS T.M.P. 101-2B 5.70 ACRES + 1 DEV. LOT T.M.P. 101-2C 6.49 ACRES + 1 DEV. LOT 148.76f ACRES + 12 DEV. LOTS = 12 DEV. LOTS + 5 (21 ACRES) TOTAL POSSIBLE LOTS= 17 LOTS* *LOTS MAY NOT BE FURTHER SUBDIVIDED & THERE SHALL ONLY BE ONE DWELLING PER LOT ACCESS LOTS 1-16 & RURAL PRESERVATION TRACT A SHALL ONLY HAVE ACCESS VIA GREENLOFT FARM CT. ZONING RURAL AREA (PER COUNTY GIS, THESE LOTS DO NOT LIE IN AN AGRICU LTRUAL- FORESTAL DISTRICT) PRE CONSTRUCTIONrCONDITI0N5 SITE WAS BEEN'TIMBERED,'EXISTING RIPRAP DITCHESrAND DIRT/GRAVEL DRIVEWAYS EXISTED ON THE PROPERTY. THE REMAINING PORTION OF THE SITE WAS WOODED. EXISTING CONDITIONS SITE CURRENTLY CONSISTS OF A TWO LANE RESIDENTIAL ROAD WITH SUBDIVIDED LOTS. A FEW OF THE LOTS CURRENTLY CONTAIN CONSTRUCTED RESIDENCES. PROPOSED USE 16 SINGLE FAMILY RESIDENTIAL LOTS AREAS SINGLE FAMILY RESIDENTIAL LOTS= 77.40 ac. RURAL PRESERVATION TRACT A= 70.28 ac. SPECIAL LOT (FOR PROPOSED LOW -IMPACT DETENTION FACILITY)= 1.08 ac. BUILDING HEIGHTS 35' MAXIMUM SETBACKS: FRONT - 25' MINIMUM (75' IF ALONG STATE HIGHWAY) SIDE - 25' MINIMUM REAR - 35' MINIMUM SUBDIVISION STREETS PRIVATE ROAD WITH ROADSIDE DITCHES DATUM VIRGINIA SOUTH- SPC GRID ,r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r TOPOGRAPHY TOPOGRAPHY OF THE SITE WAS PROVIDED BY LOUISA AERIAL SURVEYING IN MARCH OF 2012 AFTER INITIAL MASS GRADING. THE TOPOGRAPHY WAS SUPPLEMENTED WITH ASBUILT DATA IN MARCH OF 2018. ASBUILT DATA WAS PREFORMED BY A LICENCED LAND SURVEYOR AT ROUDABUSH GALE & ASSOCIATES. TOPOGRAPHY OUTSIDE OF THE j PROPOSED DEVELOPMENT IS IN ACCORDANCE WITH COUNTY GIS DATA. THE SITE WAS FIELD VERIFIED ON JUNE 8, 2020 BY COLLINS ENGINEERING. j BOUNDARY BOUNDARY DATA FOR TMP 101, PARCELS 2, 2A1, 2B & 2C, WERE TAKEN FROM RECORDED PLATS PERFORMED BY ROGER W RAY & ASSOCIATES, INC. BOUNDARY DATA FOR TMP 89, PARCEL 25, WAS TAKEN FROM RECORDED PLATS OF THE ADJACENT PROPERTIES, ROTATED TO GRID NORTH BY ROGER W RAY & ASSOCIATES, INC. BENCHMARK A PERMANENT BENCHMARK IS CURRENTLY BEING STAKED. CRITICAL SLOPES CRITICAL SLOPES EXIST ON THE SUBJECT PROPERTY WHERE SHOWN ON THE PLANS. CRITICAL SLOPES ARE PER COUNTY GIS. BURIAL SITES THERE ARE NO KNOWN GRAVES OR MARKINGS OF A PLACE OF BURIAL ON THE PROPERTY. WATERSHED TMP 89-25 & 101-2 ARE LOCATED IN THE NORTH FORK HARDWARE RIVER & MOORES CREEK WATERSHEDS. TMP 101-2A1, 101-2B & 101-2C ARE LOCATED IN THE NORTH FORK HARDWARE RIVER WATERSHED. THESE PARCELS DO NOT EXIST IN A WATER SUPPLY WATERSHED. PER COUNTY GIS, THESE LOTS DO NOT LIE WITHIN A DAM BREAK INUNDATION ZONE. FLOODPLAIN NO FLOODPLAIN EXISTS ON LOTS 1-16 & THE PRESERVATION TRACT A, PER FEMA MAP #5100060405D, DATED FEBRUARY 4, 2005. STREAM BUFFERS STREAM BUFFERS EXIST WITHIN THE LIMITS OF THE PROJECT AREA. STREAM BUFFERS SHALL ADHERE TO THE REQUIREMENTS OF THE ALBEMARLE COUNTY WATER PROTECTION ORDINANCE. STORMWATER STORMWATER QUALITY COMPLIANCE WILL BE MET THROUGH THE DESIGN OF A LOW -IMPACT DEVELOPMENT & THROUGH THE USE OF PRESERVATION AREAS. STORMWATER QUANTITY COMPLIANCE WILL BE MET THROUGH THE DESIGN OF ONSITE DETENTION FACILITIES. VSMP PLAN AMENDMENT #1 PROPOSED CHANGES: Al THE DEVELOPER WISHES TO CLOSE OUT THE PROJECT IN THE NEAR FUTURE. THE SITE IS CONSTRUCTED STABILIZED AND OPERATING AS INTENDED WITH THE ORIGINAL APPROVED VSMP PLAN WITH ONLY MINOR MODIFICATIONS. AN ADDITIONAL CULVERT WAS CONSTRUCTED AT STA. 34+80 OF LOFTON LANE (FORMER KNOWN, AND SHOWN ON THESE PLANS AS GREENLOFT FARM COURT). THIS CULVERT IS LOCATED IN THE VICINITY OF THE HIGH POINT WERE THE CONFLUENCE OF SUBAREAS A, C & D MEET. MINOR UPDATES TO THES THREE SUBAREAS WERE PERFORMED ON SHEET 9 AND IN THE ATTACHED SWM CALCULATION PACKET TO ACCOUNT FOR THE CULVERT. THE PROJECT CONTINUES TO REMAIN IN COMPLIANCE WITH MINIMUM STORMWATER MANAGEMENT REQUIREMENTS. AAS NOTED IN THE APPROVED SWM CALCULATIONS PACKET AND THE APPROVED SHEET 9's STORMWATER MANAGEMENT NARRATIVE, 'STORMWATER QUANTITY COMPLIANCE WILL BE MET THROUGH THE USE OF DETENTION FACILITIES LOCATED WITHIN SUBAREAS A & THESE DETENTION FACILITIES WILL NOT BE REQUIRED TO ADHERE TO DEQ'S POST- CONSTRUCTION VIRGINIA STORMWATER BMP CLEARINGHOUSE REQUIREMENTS DL TO THE AFOREMENTIONED WATER QUALITY COMPLIANCE THROUGH LAND PRESERVATION." THIS AMENDMENT DOES NOT MODIFY THIS CONCEPT OR THE PROJECT's SWM STRATEGIES, IT ONLY PROPOSES TO UPDATE DETENTION FACILITIES A & C PER THE ASBUILT GRADING AND STRUCTURES WITH MINOR PROPOSED MODIFICATIONS. THE TWO EXISTING FACILITIES WERE CONSTRUCTED TO DEEPER DEPTHS PER THE APPROVED ESC BASINS, AND NOW HAVE PERMANENT POOLS. THIS PLAN NO LONGER PROPOSES TO DEWATEF THE FACILITIES, RAISE THE BASIN FLOORS & UTILIZE THE UPPER VOLUMES FOR ATTENUATION. THIS AMENDMENT NOW PROPOSES TO KEEP THE APPROVED/ASBUILT LOWER ESC BASIN FLOOR ELEVATIONS, KEEP THE CORRESPONDING PERMANENT POOLS & DRILL NEV LOW -FLOW ORIFICES FOR ATTENUATION ABOVE THE ORIFICES/MWSE. A3 THE SHEET INDEX AND GENERAL NOTES WERE MODIFIED, WHERE BUBBLED, ON THIS SHEET. Q4 SHEET 10A WAS ADDED TO THE PLANS, SHOWING THE DITCH DESIGN BELOW THE ASBUILT CULVERT. AA GREENLOFT FARM VSMP PLAN AMENDMENT #1 (AMENDMENT #1 TO WPO 201600034) SAMUEL MILLER MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA _�II \ ✓ --- \ / / / � I / \ \ ` t / / I \ \� / \ \\_—> 7////IIIII I I I I I \\��'�—��``--�' �—%\!\\\ � \ \ / t\ IIII/��l,� � //r rl I \\ \\\ __/',//',I /I I / / __— '_ �����\�� \ / / /' � Imo'/' — \ 4 / //f I!I}jllll i1\I\\t\\\�\E�\\\�;�1\\\I1�I��\\\\✓//�///1�/fl/f/f ///I///i/// \ \\\� � \ �,. ✓ /� iI�JJJ / /l / / /III Ill i `\\ \ \�\\\\\ \\\\� �•.�''',' �/f��lf/ff-//// // / I\\\�� -- 1 \`\ / / / 1 / //� / l fll ✓ / \ ` \\ \ 111 l III' _' , /////// /IIII I -- I W/II I \ �/ 4 0LIOT(3 it l I� l�l�ll III1�1111 //ll `b\ V\k 2\ \III /j�lllllll \ \ k \\\ \ I° , r d - f .,. o \\ \V� J1)� \ \ \\ � ����(fl° /rib„ II)IIIJ(�((l 16. \�ti / III/II/// /- °� \\� "�� ll l / I I II \1 \\\\ \\ 7111 111 1m jll I AVAAvA�w\ vw11vvv1 vvvI v` vw`\v\ � \ I l� I i I \\ \ 1 I 1 I r \--- tl \ 1 \ / \ 11 I I \ / I I I \ \ i///�i/I111111111111111111111111 ��`— / / VAV A\ v��vvvAAA\ti ��VA\VA\VAVAII` ` ///ii'/'ii//'/, \/JJJJI11111111 I I I I ---/\/ / / \\ / \\ \\ \\ `\\\\\\\\ IIIII// i l I,llll,ll,li SHEET LAYOUT SCALE: 1" = 250' SITE SCOTT /R. CaMLI Lic. No. 35791 A 9/9/20 / z 0 J J Vl Z v W 2: =) r /� p Z Z 0 rA U) > w z RF Oy(L Vl VICINITY MAP uu SCALE: 1 2000 CC SHEET INDEX TITLE SHEET COVER SHEET 1 EXISTING 9 ., .. . , E) RE .. Pb„P IL 8- STORMWATER MANAGEMENT PLAN 9 STORMWATERDETAILS DRAINAGE SWALE DETAILS 9RATNAGF TOTAL SHEETS 44 4 LEGEND EROSION CONTROL SA SAFETY FENCE 3.01 CE CONSTRUCTION ENTRANCE 3.02 QST STRAW BALE BARRIER 3.04 SF SlL T FENCE 3.05 lP INLET PROTECTION 3.07 OD TEMPORARY DIVERSION DIKE 3.09 TEMPORARY RIGHT—OF—WAY 3.11 DIVERSION TEMPORARY SEDIMENT TRAP 3.13 �ST� 1 SB 1 SEDIMENT BASIN 3.14 1 TSDI TEMPORARY SLOPE DRAIN 3.15 QRR 4 RIPRAP . . . . .. .. '3:19 RR ROCK CHECK DAM 3.20 PS PERMANENT SEEDING 3.32 OC DUST CONTROL 3.39 * UIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK SPECIFICATION NUMBER 0 0 0 Q � � O\1 U w w LA z ti M c`') c7) N M N O N Lu J _J U) Lu — 0 Q U W F— Lu I— F_ LLJ rQ V 0 CD N w J I w w 0- 2 a Ln JOB NO. 132091 SCALE 4S NOTED SHEET NO. 1 APPROVED PRE -DEVELOPMENT SCENARIO \ \ APPROVED STORMWATER MANAGEMENT NARRATIVE / \ \ THE PROPOSED PLAN UTILIZES A CLUSTER DEVELOPMENT THAT MINIMIZES LAND DISTURBANCE AND MAXIMIZES OPEN SPACES AND LAND & STREAM BUFFER PRESERVATION. THE DEVELOPMENT ___�__ \ \ ACHIEVES WATER QUALITY COMPLIANCE THROUGH THIS EXTENSIVE LAND PRESERVATION. THE PLAN ALSO IMPLEMENTS CREATIVE DESIGNS WITH THE ROAD/LOT LAYOUT TO MINIMIZE ITS -__ - -- - _ _ __ - \ , \\ \ \ IMPERVIOUS FOOTPRINT AND TO MINIMIZE THE AMOUNT OF GRADING & DISTURBANCE REQUIRED FOR DEVELOPMENT. THE END RESULT IS A DEVELOPMENT THAT DOES NOT REQUIRE FURTHER - - - - _ - _ _ _ _ - -_ - - - _ \ PHOSPHOROUS REMOVAL. PLEASE SEE THE ATTACHED VRRM CALCULATIONS FOR EVIDENCE OF THIS COMPLIANCE. --- _ �_� --Exs: GDOWNSLOPE \ ` - -' / - / ! � - � <_ \ THIS DEVELOPMENT ALSO UTILIZES ENVIRONMENTAL SITE DESIGN (ESD) TECHNIQUES AND PRACTICES IN ACCORDANCE WITH THE JULY 2013 DRAFT VSMH. THE STORMWATER MANAGEMENT DESIGN _ _ - _ , _ _ / _ _ �- 0�8" CMPC-t1LVERL - - - - _ _ - _ CONCEPT WAS INTEGRATED EARLY IN THE SITE PLANNING AND DESIGN OF THIS DEVELOPMENT. THIS IS EVIDENT IN THE ALIGNMENT OF THE ROADS HORIZONTALLY AND VERTICALLY TO REDUCE ' - ��' i - �� ----__ _ __ _ _ _ - - GRADING IMPACTS. PLEASE SEE THE ATTACHED STORMWATER MANAGEMENT CALCULATIONS PACKET FOR ADDITIONAL INFORMATION ON WATER QUALITY COMPLIANCE. -- - ' (, - - � �\_--:____ STORMWATER QUANTITY COMPLIANCE WILL BE MET THROUGH THE USE OF DETENTION FACILITIES LOCATED WITHIN SUBAREAS A & C. THESE DETENTION FACILITIES WILL NOT BE REQUIRED TO // / // -/ / / \ \ \ -" - - - � ADHERE TO DEQ's POST -CONSTRUCTION VIRGINIA STORMWATER BMP CLEARINGHOUSE REQUIREMENTS DUE TO THE AFOREMENTIONED WATER QUALITY COMPLIANCE THROUGH LAND PRESERVATION. / / __ \ `,�` - - - $�. THESE FACILITIES WILL BE USED FOR WATER QUANTITY COMPLIANCE. _ \ / \ -- / / l \\� / l 1 1 0 \11�/ �-- �\ \ - ice\ ,<'s,°ec'A^„Am --� -' \ \ \ \ \\ \\ \---?\\�\ I 1� - \ice \ �_`_/' \ \ \ \\ \\ \ \\ -\ \ \ / _ r _- - \ \ \ \ \\\ I \\ J(;{(�I /i�/�=- \3giA'\_\\� I`�` \` \`\ \\ \\\\ ) \ \\tea %/ /\(/ SA� = \DfrF;;AL __-_' \\ ;\ _ -- \ \\ \\` (I =73�° a'I/ ////\// / r/i_�/� -_g-= _=__ Il�/llG - - --- \\\\\ \\ \ \ I \ 1 y' 0I26A,rs.l / a^®/ /k s_. _- \� J/ l - \ \ - _ \ _ \ \ \ \\ \ \ I I w�R� / // //////�7/�` .f /` // / //�/ -�\\ i, �II�/� \ \'/ \\\\ \\ \ \ \ D S OEO H,I* / //& �, �� /// /\,/ �' // f �{PP�R9V€D i�o. - \ \\ tj/.. r�,O ) \ \ \ \ \ \ \ \\ �G7y rr //, / /i/ / / 6A `�_ Tc=o.i hrs /; - \ \ \\\ l \ \.\\' \\��\ I \ LI','-- // // �Y//// /�o'OF CHANNEL FLO )I11 ,\ \� \ �� \ \\ \\\\\' II IEXI Tlrv{= /\/ �'/% / S EL- 9fi'(Tc=o.o5 rs.) {1-,� _ �� \--\-- \^.-�\ \\ \\\ _-_ ^\ \ \ \ \ H U rr�� ]��'/ ' - ,46o'OF DUTCH PLOW /��- _`% _ _ _ \_ \-- \ _// \ \ \ \ \ \ \� \\ \+,*�� APPRQYE'6FINAL T.� .z6 r . (o.a4-Rfs.)°/ - _ _ _ \ _ - _ \ - \ \ \ _ _ - \ -� \\\� ` \\5\.\\\( \\I /�';xv 401_F-w/ ELEV�7',- p\ \ Y _ \ \ - \ \\\\ \\-`\ / / \ �. \ \ a / / c=o.zo h?"s.r �-- -- 1 \ \ \ \ -\ \ \ <\ \ \\�°' \,\\\\ \ f O C NN EtFtO ' \ - \ \ \ \ \\-- \> \ \� - .l (r � _ \O �/li ,,/\\�\/J I t . ; f J/) 7 e'LEv/=9 ' (32=o'oe h 3^) Po V ` �/� l� - \\ _ \ \ \ � \ � �--�, \1 II /I * \\� IIIII IfiP° 4 ���/I{r `(r h/� �i//� APW2�V --\ - - _ 1\ - - _ \ ; I i h\ ` \ ;\ i / \/ � \--\\\ - \,,\ \l ♦�\\\ \IIII 1 II{\���, �j4 k �d�iLc4 V' o // / $- � UEARF� 1 - ) \/ i > \ i // / \-- \ rr11rD\\ \\\ \ \ °/ /'3z.ar- ��/\ \ �I / -I \ ' - I / / 1\-%_-_ �` - _Ol///\\i�_. " \`. O�\..`Y,11'I°°/ rc=o.z4hos. Tzo�� % \\ y I I \ / /J/ �G %- _ 1 -� J//!,,- 11\\ 1 .�\ /* \ it y \ \ \ ( / / / _ / - \, - - - 01 a\ \ a / / O _ / I �- �_ 1 / / / / / / / / / r \ --_'' _ /// Boa _-/ % ^-(' �°�// i>/-� iD 1 I \ \ 1� ( I 1 / / / / / / ( / / / / / / 1 \ \\ \ i -/' // /-/�i<' j° Tc o)o\hrs O o °`�I J �I ( l / i / / l /' / l / / \ \ I J / / / / 1 \ \ �_/ J' / I / / - / /\ _/, / // / ' // / r °)1l �/ / � �1u o% / / / *�// \\ `(_ ) \--\ \\ \ `\ \\ \ \ \ / I I \ � / \ I\/' -p /_P ! • /�_ - / /!,�/l I I \� V \\ \ \I \\ ' ) / / / / '\ -��'Nlll \ \\ _ � \\ \� �- �vl^,./-//� �%ii/ v /'� /may ,' /' � / \ \ \ \ pdN / / / \\\ \/ / / \ \ \ �� /ti - /- �i � /Z �/'r __ / � - PROJECT ,' �' / \ \ \ \ \ \ i' / ' / ! / / / _ �:- �\ Z \ 1�nrti /,// /i'/, I/, // �- _LIMITS irlfi.) /' / \ \ \ \ \ \ \ / / _ ( o \/ / -/ ---\ � \\ \ \_ /swL >/ of // "i ii//�/�j�i moo - ----' /'' `\ \ \\ \ `\ \ `\ \ \ \\ O/ -,-__- /' / 71 / \ - \/ \\ \\ //C \\r'/`\,, / / /)I J ((`1 \-O- i/--_ _ _-- i \\ _� 1 ' '•� 1 /' /' ` =-- _ _ - _ - -- - � .- _ - - - _ / _ - j // - /_ - - � - //////I 111\ 1 k \\\ \\\ I -- / '---- ---- / 1111 S / / / / I \ \ - t_ \ \__ \� - -\\ - / �%_ A�'1�f 6C EDO/ /////�/ / //� -�- // \ \\\ \\ O\\\ - I I - / \ - `\\ ---_ ------ -'//-- _---- - �. ///i�/////,//// - _ \\\1\ \\\I\\\ �- _ �'' /�'/// I \ / / / /♦- -\ _-------- _ _i �'-----��6 -:-- sus-�ii��/ % / \\\\\� �1\\\\ \\\!\ !/ O /y - ,/ l // --;\\ _----- -==%660� _ - �%� `y;� ��/ / \\ \\II\\`// 1 \\ \ \ '\ \ I _ % , f ,, _ l{I l _ , /� `--- --- --- _ -- -- ,� ,� //-- �� ��\ \\1\\� / - O \\,\�1 Ill - I - --- - - -;_j-- ----_/ - __�/,l//l-O\\�\\\� - ,___�/\\\\(ICJ I, r/_ 1 -_- - / / / _ '64/ %/ i -- _ / j l /ill l l -�\ \ \ \\� // ! / ,// / fi r� / _ l / �� - /I / �/� ^\ \ / / --�iii i � y �5� - i0/� /// /IIIII \ _ _ \. 1 /i //� ✓/�//:. /' ' _ \ �l / - l - /, I % -- �-- - /// // /�/ / \ \__ <- l l f i \G %/ / r e1NTJJsT e \ _ \ _/ ! � \ \\, i / _ i_ _ =// I / III IIII r�\\0�=_` - y / ,r,< / I G /, r 1-_;:/PeN�F. F _ -/�-_�/�//'�_ / 111 _\�-_ yam, �ir .. . ;'� ._ri �//,%' /. _ \\\\`\\\ �// // //�� I -,,- - _ iOl ll lllJ�l l ram`ill ;' „/ , f . � \ \\\\ \ _ - - / �': _ / III'�'--_ - r r r / r /\ _\ / / \' \' , , !, , f III\ - / / � �, _ , - - // / \ - II1l \l\r-\ �/ //� / \ - \ \= - /O / l / / j d \ / - \ / / / / ///i \\ I \I \\\� \�_ %ice%/ //1 5,,,, O/O/(/ , \ \� / / / _ 1 ( r l 0 _ / \ / r / / °. / / - ✓ / / e. _. / ? /.. / / -/ > / \ -o".r v d` s /� m ! / \ / / �. // / / / / \ \ r / / / // / / /..' ,, 'F"Tk:�..:. st/s f'o.oylfrs.3 / \ \ \ -�_'/////,ill l \\ \ \\\ `� \� - „S f / / //,'; l_( / / \ 1 \:\ \\ c ' / \ -\--- - �- 1 / / l I l/l, � _ -_ 1 \ \ \_ -- _ ///_ / ///1\\ --EXI Ire - �::-r% "Y Id / \ &, / NT DI 1 / _ 1 _ rr _ I / E \ _ - 6F'TFFE ' rVocrt _ // '�_ - / it - - / / / f a r l / DE EL _ / -- _ Y OP#IECV�- o- / / / / / / J e / J / _ --�/ t-_---'\ )_ l I//////�/// / P ITT&'y�Oh �/ IIII I +R\ \� . .,P \YEtD PROS RV 16 SM'r /'-- /- _ \ / ( /// ( I I / %� / / / / T l l I \ \ R � A � // I / / / / _y \ \ ".ICI O /-_ J \ maHlelxlN fWj�R� '/ ` - \, \IIII I\\\ \\\ \ I (9I T \ / / / ( / / (�� \ \\\ \ ; DE`� LpTztMg NIT �D�I�INEAfIN� _ a - - - - - - - \ \\ \\ r4 >i j= �/ / / / / ( \ \ \ \ \ \ : "I � \ \\ \\ �- //- - - �� �cf / \ \ \ \ \\\ a ITs k MAN[>�Ya�v - _ � '' - - R p (/ 1\ \ \ \ \ \ \ \ \ \ \ _- I IJNDYST�LN2 E 0PENSP(CCES. /, i - - � - \ _ \ \\ { Iy'H t �2/A' (T)M� / \ �C \ \ \ \\ \ _ -_ `-: \ ht - - _ - - - _ _ / I I I \ _ g� \ -_ �- - - - - / �. - _� \\ \-\\� �\� :._,� \---­:� : \B�ONN'DAR as .Z ;%� /'_, _�,� \\\ /,/ lJ/IIIIII/ I //III l _- -_;\ ,;�\`\�_ ;\-0o1 : � --_-; \\ \-\ > /// /� - I -\ \` \ \ \ ` \ / %i111 i'/ //♦- -- �� \ I /r/ ( ( /IIII II(Ilil l / j _- _-_ - - \ \ \ \ \ / '- I ////",S_-; - \ ill l IIIII \II - -_ _- \ \ I \ , --/ // / - - -- -� \\\ I I I 1 II \ \ - _ -� - i >/� � ,\ \\ \\ \ _--__ \ , \ \_ / / - - \ \ / _ \ - \ -_ -_ - / -- \ 1 \ 1 \� - ! / - - \ - \\ \ \ //- i/////////,■- --- \\\\\\\\ // ,\ // ___-�\\__// )I \(,IN T ___-- ,�\\\\\�\---- \ \ \ 1 ' /' /// /////ft -\ `-- \\\ \\\\\ \ I l 1, l \y\ \ /- ?� ! / !!/! !, / // -- -----' /', / k MCI1\ _ 1=_- \ , \ _ _ \`e�N \ \ \\ \\ \ 1 i%//////j�\ \\\\--__- \\\\\\\\\\\\\\\\\\\\`/�� /' . / ' I I I 1 I i' i (\ \\ \ \\_ / /l /." c=-�\�\\��,-__-�- -- \ \ I --'/ /////` \ --- \\\ \\\\\ \ \ -- __ _- ^7//� ,/ I 1 1 I \ \ I / / - /// / \ \ -- \\\\ \\\\\\\\ \I\ _ - / // / General Construction notes for Storm water Management Plans / // \ \1 j'j///// ■ \\ \ __--\\\\\\\\\\\\\\_Nl1 \ �// /// /// I (I I h ( ` \ 1\ 1. All dams and constructed fill to be within 95% of maximum dry //f/ ///' /I I /j/// �_-\\\ --\ \\ \\\\\\\\ \ q' _ --/ / / / I/ \ 1\\\\\\\\ \ density and 2% of optimum moisture content. All fill material to be //� / ,/ //// / - ' //// -_ \ --___� � \`\\ \"`k\ /,�\`\ ,\\\\ '////-'/ I ( I\\ \� \ \ \ N\� , approved by a geotechnical engineer. A geotechnical engineer is to / / /! / / / /'- � --i \-_-__\\ \\ \yy�\//!! _\I \ \ \\` \\ be present during construction of dams. / //I / / / / / ' / •� , \\ )Il \\ \\; - - \\ 2. Pipe and riser joints are to be watertight within stormwater / / / / ���� \ \ //__ / \/�// / i - �`��\ �\\\\\\-/ � / // / _� _ Management facilities. I ,A-- / / , - _-3. For temporary sediment traps or basins which are to be converted / / / // _ to permanent stormwater management facilities; conversion is not \ / I /\\\\\ __:_ _'/ '/ //,, to take place until the site is stabilized, and permission has been ---=_ -- SCALE: 1"=200' / / // / //\\\ I \! \\\\_______=__ -_\ /// /// 1 / I obtained from the County erosion control inspector. AMENDED POST -DEVELOPMENT SCENARIO \ ` \ \` -___----\ `\`\`-'/' \\ -_- ' --- __- __--- --" \- . . \\ \ \ \ •---- --_- \ \ - _' '- \ \ /'_\ ----- \_ - - Total Propose - -'- --- --f-XISTLNGDOWMSCOPF \\\\-I\\\\ _\\\\ \\ \\/ __\\ \_- --_ %!///// 11 Road -''- '-_'' - _-,,_ - `\ z8"CMR-ULVEBT ­� -x-__ --__ \ \--------_ \ \ \ \ - ,- \___ / /, / /' / /I Residences(6, _ _/__/ -- / _ C I\ _ _ _�_ - \ \\ _-/,-( \ \ \ / Subarea APro 6 \Y-__ \\\ .\\\\ ) / 1 / / / \-_- _ _ ;_\ \ \_ \ / / / -- Road - /37 �--\_ \\ \\ -- ! / l 0 ---- "_, \ \\ /--.; \N 1 1 \\\ \ Lots5,6&16 / l \ I l�c-� z a „/j/' - �_\1 V �i \ \\ -- % \ \ SIgEW NT l \ \ \ \ \ Area Breakdown 82,395 sf 96,000 sf Total= 178395 sf i Imp. Area Breakdown 24,300 sf and 4,7 & 15 (Half) 27,000 sf \ \ I � or ld9 1'' \��� - _ - _ - - = \ \ \ Total= 51,300 sf \ \ 1WI 1 � I � / / - \ - - - _ _ \,^ \\ \ \ \ \ \ \ \ \ \ Subarea B Proposed Imp. Area Breakdown \ \ 1 \ 4F �l _ - - _-Z" \ / _-� \\ \\ \\ Road 11,515 sf _ - �-�-5 \\ \I 11 `l\-\, \ II /I J j _���/ _�#- _ _ Ste\ \ \ Jt�MOO\\,,� \\\ \Lots 0 sf )\ \� �/) / I 1 ///j / /�� C1 �rh __ _ _ \ \�)') TgTFBQUTF "' AL l Total= 11,515 sf \ \ \ I I 1, I m i 7�IV // / / /A R V�O"FINiAL�j.zz --- _�\ ll� l _" \� -\- \\ \\ \ / ' _ `\� \ y� -\ -Subarea C Proposed Imp. Area Breakdown \ \ \ `\ I / / - /T '/ / / o q Ha Y -\Road 29,650 sf \ \ \ \ S�I o f I N 5 / � // y X,(c-o � rs. / -APPReu€-0 - two. \ \ /'/ - - A � \ + 5$ NW / / / 7z5 OFfHAy�€� FLOtG /4 LEV -5t' io €f) __ j,/ - _ - _ Lots 10-14 (Full) and 15 (Half) 33± sT \ \\\ \\ \\\ d % � // // /\ �/ / //(repo .) 41 e°A . -_/ \ \ \ \� / / / / / C(y7y / / / ob=o.i5hrs.) // ' r _ _ _ \ Total= 62,650 sf \ \\\ y\//°�//-�/ /r �/ /�o' CHANNEL FL� )�I�IIL T \\ \ \ \ \ /\\ \ ( I / /_ /r / _LG,T z / V*96' (Tc=o.o5 rs.) I \,-/ - - \ - - - \ - - 1 \\\\ \ \ I `: _� -/ 46o'OF D4ICHAOW /�- _ \__ Suba rea D Pro posed I mp. Area B rea kdow n \� \\\\ i /` „\ \ Y - _ \ \ Road _.;,U,65sf \ �tb b� E Agg / \ f - j \ y_� Lots 8 9 (Full) and 7 (Half) 15,000 s _ \ ��1 I // / /SRO ¢(J RT \ k\ __// --- \ ` \ `-\ Total= 1,650 s 14 v,v /(ram / -- "-�V I li/ i/ ) �J D TI GR N¢FF/ , V -� '1 �v� v A- v A _ -- --� 1 1 ��, \\\\ 1 I /( /O // / I�R RQAD' TOE - - \ �--� / \ \ \ \ \ ��,,11 \\\ I�I 11 / / 11 f� - _ _ - ti \ \ 1 Subarea E Proposed Imp. Area Breakdown \\l ` >)\) I p P� W° 4 I // �%//);S L/ / / \ � - \ /* I 1 \I \ Road 10,280 sf \ \, 1 I III �(�� ITo / //,,/'. �/ / i�a� _ \ I � \ \` �q� / \ \ / _ \ \\ \I l \ \ �R� 111 / /� (((/ ( / / / % L�4 r,o� _ _ _ _ I \/ \ ` \ \I \ Lots 1-3 (Full) and 4 (Half) 21,000 sf \-- I \ _ _`\ \\\ \\ \\� ��` \ \\ \ \ \ \\\\ \ 6 / _ _ � \ J > \ Total= 31,280 sf ' I I- \ `- \> I \� \\\\ \ \ \ O\\ \ (fah° - _ ;�� / / ) / I \ r \A.SaL14LT-00'N�TR O//� =_\\�-� \ '" I'll- , --- \: O�\ \\ �\ - O\ .,.� I / / / I I / I J - I / OF-Mf1 LEI TA� i - `4. \\ \� \ ° / 1- ozo� \ \ I I\ / \\ \\ I / / / / ,� \\ J /// / I \kMQnNr�rENrg i \;, i. O \ 11 \\\a\11\ OI / \`tk\� \^ � \\\ \\ \\ i !l i i i' ! j \r ? J/%/ I`ll \ \ / \ / / ,LOjN-PyTI NTTOFT - ---� / / _) \\ \ \ LOT / I / EATING. S'WAL - ^- - _ ,- -�'/ ->\\�l \s\\\= I I T \ I i > \) \ / 1 / / ! !/ / I /('/ ^\ \---/ / O \ SWIvLF-ACaL�F1'1A - _ / =�' 1 1 I \ / / / / / / / / - - \ _ / \ / ° v // / / / / r- _-- - i / e� /�PPRCy16ED FINAL\1'�o H- ° o`/ -I / / // / / / / \ \ / J / / / / 1 \ \ \ --- - °� o / 60'0 0 Fivlf EL no � J /q l / i / / / / / l ' / \\ `-- ---___ __ / /-r sr7zT z170 0�J \O J•_1J )J �1 / / / / I / / / // 11 // \11111 \ \_ \ �_ \-\ \ \\ _--_ - ` / 10, EEV.=uz' (Tc=o.o 9i) / / I \ \ \ \ - \ \ \ , --- 1 \- �✓/ CNa t�'7�-- �/ I \ T � \ AMEND D/ASBUILT CU LVERT Q \ \ \ 1\\ \\ \ \\ \ \\ -o z / h v o o R 1 \ \ \ - \ \ \ \ / \\\ � /// � 9 _ �f), \ LOT I �\ I / ATEA INEbS. SETYONEF THE \\ - __I \_\ \ \ \ \ / / \-/ / / / V w/� LOTz I 7 9' ° / WATE�2IGNO SEWNSTREAM \ \` \ \\ \\ \ /r \\ _ - _' / / \ � / r - 5 �191 Y / i oZ'- *`� FOR DESIGN bFADO'WNSfiREAM\ \\\ 1 `-Q _ I \ _ \\ \\ \ I\' \) / / / / ! II \\\ \\ I� \ � \ 1 /I /I/ •/JJ/h/ .t ..a _/_b �� / j //* / I (/,\' - /> ,> /\ /// / /' / ,-L-_ -- - \ \ \ I r .. / /� / / \ \ \ / N // /// / / / \\ / \ PPRO_MED-FINALTt o.z74h - ; \ ---\ / '/ / �-� - PROJECT /' * //\\ \\`\ \\ \\ ` \ \' ,' ,' / / \\_ / / \- ion'.OFOLF w/A�LEV= ° Z yy „ �'"/ //// �° ^-\ LIMITS(TYP.) /_' \ \ \ \ \ \ \ \ r \ (S \\\_/ // / -/ --- \-(fc=0.z2hrs.) \\ \� \_ 9v ///,ioo - / -------' ' // \ \ \ `\ \ `\ \ \ \ \\ 0/ \\\\-/ / CHANNEL FLOW � � �-/ // / / / , " -660 _ '� \ \ \ \ \ \ ` \ � \ '-__-- / /' \ \\\ \� LOT z4 / // Z�/ / //- /// / -- ' ' � / \ \ \ \�� \ \ , / _ \ \ / E4EV.=4:-(Te=o.ox hr�) \ \\\ \ �\ / / 6eo / // ' - - - - I / \ \ \ � 17� / _ _ '\ *•mil / ; / I�\ \ \ \ J/'/' \\\`\I`I1 - �,,i35' OF DITCH/PIPE FLOW Qa 10 \\\\ y �� / / i 69° /' / i- - - � - \ r _l I It (o.o4hrsJ \\\\\ - wo / / / //�'-i'/ '_- i6," -_-\-\ I I / �• i - ' / \ \ \ ) /-/\ \---\ \ I * - J/ �/ /`/Ill l -� �0- --z - _�_ -- -__ = _ -- O - �__ `\ I / / I / ill /,-_\\\ �_ J// \/' \\\ \\ // �y\ \\/O\A -/LOT o' �/_ IJ J((\\`\ _\ �6 a/ s l - _\-`___`� ,\ \\\ �/ /// I \ '' ,' ` --_ _ \ C o \ _N AIII _ \ I \ ` _ ! / _ /� /%- ' - _ - _ 4 Tom_ _/ T / / i / _ - -- _ - - / _ 1 \,/ --- - - - //// I �1 I �l�" \ \ \\\ \�: \ _ I _ _ _ I rllll (// \ /' 1 \___ _-\ � /_--'-_ --- // R/// / l l I //*�►\\ �\ \- l\ AMENDED ///// / \-- \ \ '1 '/'LET%3 = //�/ % / ' //// / ///°- \\\\ \\ \\ t 0 O / '' - v 1J � , \ , < \ _\ / m //� E V�i 'fQJ 6w - \\ \\\\ II \\ � -= \ \ So.o4 ac. ram:. I, /--_ \\ C\\ --- \--- Ir-- // N� - S / /- \ \\ \ �~ - / \\ '___ - / / i -- - .' 1F ///// /// .--�- \\\\\\\\ _ '-'-_� I ( /: �i \ _66 / - - //// / //// \ \�, O\O - - 'f,// J; '�� O \\-�\---__-\--- _ / GAINED-)-- --- = / /i/ ////// - . �\ ♦ 1 , \ .�/ ' /i: j / _ _ _ ' � � I I i 6- �1� / "I I�Z_ /�/ ',�� I , ; \ ,1 I � - I I _ - -- _ - - _ -\------------ - - -ice � -/ // �° K I \\lI I J / lI -_ -_ _ _ _ -_ .o / / -IDEfi / / \ / ✓ , \, / \ - APPROVED RE 'YAR W E - 1 // L j1R8DE6S�VlJ"/ / l //\\ \ \ - -- - - f -/ \ :. '.. ,'" : '��%./ - PRO 9R Ds AL\ - -! '_ _� jf-INT E 6E�S %/ /�11 ' \ \ \ _ / \: J= -"> ' � '" % Ni #\ � \ DIRECiINCfRUI�.Of ROM\ - _ '-�i �i- - _ _ // /// I l \\ I y - _ _ _ -COTS ZO�$BUIyYSWNF \ _ i / - / �ti r- \ / / i/ \ FACI TS"C -, \ - - f _� / // �i' _ _ /// / /�-� \ 5 / a fir,, � \ / 12 //' f \-- % ///� - \_ IIII ) - \ - \\\\\ / --- - / / / / - �/ // / / - - / IIIIII \ / io4 �, �; \\ \ _ / l\ _ _ 1 � ; -- f I -1- - X, \ /' / \ - O/III \ \ \\ r c \\\ /, :,, r.J r / / - \ / / 1 1 / \ / \ / / \\ \ 77� / / \ / _ _ /Ar fI1J LO-o rs. / \ % / / \ \ / - ' i _ / >� /./: f d F c -:w r`a ohs. ,v _Z�\.- . ------'--'//!!!/ ll \� � \ �- ice. ._ -- i � , \ / r _ _ / _ / ,, _ /J p \ l _ /rl75 v r / \ / / 1�� _ f rr /// _ l Ll / / \ r _ / I- J ' - / / _ / r ---- // \\ \ \ 11 l ! 1, \ 1 _ // / \ / d --- '// //l/ * _ / r/ / (// (I 1// 11�.IIIIt�{' \\ \\t;�\0 �►:_ _-// r , , DI 14 / / \ II / / I - � F�THErr.�ry cEt - i I t \ \ - / / / / / �u I l ` / I - - / - / \_ _ % / + \ \ _ i i - -_ � / / DEYELOP#IEN -�- a�` "�/'/ // / / / I I I f , T'i - r "-_ _ -'/ \ \_ / i / '' \♦' \ ' - - , „/. // /////i/ �PPP�d Ed/� '1LGA ,T o�V T� /T. r� / 1. �W),, I' \ \ ,` \.. '` -'.,,- // t \ III' A / // \ \ \ \ \\ \ - - -' 1 y _ -! �7 _ _ - \. �- , - - g \ \ _ ^\ _1\\ 'i/i/// � i�� ) j ///I I, I It // Trl I /I \ `0� -,� , -�\_\ -\ _ \ \ - �\: I, \-: -- - ll -=__ - 1 _ /� /;w= Z \\ '// ///// II III ll,i`�"/ lil it J \ -,- \\ \ ,\\ \ / - / - / \ //'i \ ///' %/ \ \ \\I ////( / J//II111IIIIIIIII(/(11 \ _`\\\ _-\ \ \ : \ \_ _\\,�=\mil \� \\\ \ r � /// \ \\ I I / I \ ---� \\ \ ! - `-s11 i O//\ /////// /♦- _ \ \ III II _ I_ / //// /////� _,\\\\ \I / // IIII \\ _ \ ! / „ //// '_ /'//// - -\ - _ _�\\\ \ III\\1 - --- - / - // '/// -,, , //ii/ / / /-- --- _--_�\ \ , \ \� I I I II > / />>'>'/'--i \_\ \\ -�' l `tN T". _-- -\\�\\ \\ _ _ \ / - \- / / / / / \ -� \\\ \\ \\---- //---- i///'%'///'"'/_i_//////A\ _- \\\\\\N\\\\,\/,/ill/ \ V \\- .,... ;/ /_ /!'____ '/// 1, mcli� aoq ."fit-_-- 1\\\\\ _>__ /'/ /iii i%i% % ii/////'iG� \\ ---_ \\\\ \\\ \\\\\\( //1r_ WATERSHED SUMMARY // / ////// --- -//// // \ -\\\\ \\\\\\\\\N\\I __�_ Pre -Development Post -Development ///-i--' j'j j/'//'//'i i--'_-'!///// §-\ \\ --- \\\\\\\\\\`-Ndl\f-____ //// / / / / ! -i / // /// %'; _'- / // // _I_ \ \ \ - _ \ \ \ \ \ \ y\� _ - _ - CN Area, ac. 1-Year Flow, 2-year Flow, CN Area, ac. 1-Year Flow, 2-year Flow, / / / / / / _- / // \ -\ \ \ \\\ Ill _ cfs cfs s / / / /, / // /I III I I l / / /' / /- ///--_i _\-----\\\ 1 \\ \��\ \`" DA'A' 72.0 18.55 20.31 22.71 73 .7 . 0 .6 / / //// //'/ /\Jill if // / /' / / / - 41nowo1*' \fir`\\` \\\\\ \ DA'B' 73.0 4.30 5.35 5.97 175.0 ' / '///// ' ' / II 1 1 1 I --I -'I /`Il \ \\\ \L\\ \\ DA'C' 60.9 19.98 0.49 0.53 �/ ///// Z,/ /\/___ 11 / 1 II I-----\\ \ \/ / I D �Q� \; DA'D' 56.5 101.09 26.70 33.64 5 00 ) 2 1 /, //// / ! / / \ \\-1 1 1 ( / -----\ � - I ( /\\\\ �_ DA'E' 72.0 22.86 28.03 31.35 72.9 20.80 //////'/'// / O `1 1 1 1 \\ / / ` // / !!\\\ \! \\\\ TotaI= 146.80 80.39 93.67 Total= 146.80 54.99 71.52 OTT 7R. CMLI Lic. No. 35791 9/9/20 Z O a k Z " co = O Z Z O � J - F Z w � `7 W ce 0 0 0 o Ul Z J J 1 �4� r ti (T) C7 N C'7 N O CA N N > W J J U) LU F- r- 0 Of U I w Z) W LU Of C0 W Of C] N Ill z LU 0 z W Q z a L 0. ,� V 1 > Q LL LL O J z LU to g LL W W z W Q O F- w J r U I_ I w w a U) JOB NO. 132091 SCALE 1"=200' SHEET NO. 9 -Nrrr<�vtyie�Trvll,t � - � � GRADED, EARTHE j - / AMENDED DETENTION BASIN 'A' (SCALE 1"=30') ACCESS R9A-6 -COUNTY DEFINFA CRITICAL T 6/ SLOPESTO REMAIpI-' �� UNDISTUREE-D(TYP.) _ 612 - \ ASB{11LT LIMNS \ \ OF I IFIRAP \ \ TO ENfFLOTATI E ER / -608 SET�iIS SHF'ET�OR THEE / AND BARREL C-O�PjjNEC O L B / j \ \ �\ SCALED'Pk0FILE (TYP.) \ i 7IIEffr1P, / / / AP-ROVCD io ®/ / -OF DAM_EhE-� -ASBUILT" / iX - 89.7 / L /777111 r / 598 60 1p/�� 2 57i� ) SBUILTO 48" CL. III RCP STANDPIPE w/ TRASH:. �r. ^ �' I I I I I RISER ST RUK TURF RIM FLEAHALL SERVE S THE RISER BTRUOC SURE. MWSE= / fc 5oo�c' 597 3 (i) / \ \ \ ✓ Q oSE / / / 04"LOW-F OW ORIFICE w/ INVERT ELEV.-590.00& 59 04 MID -FLOW ORIFICE w/ INVERT ELEV.=545.00 TO BE SEALED WATERTIGHT. / 0 - m / CONTRACTOR TO DRILL ONE 2 NEW 06" LOW FLOW I v i \ \ \ \ \ 01+QQ j /../ // / ORRICE w/INVERT ELEV-59o.00 \ / / / / I / DETENTION BASIN 'A' / 96 / / // / / / / / Elevation Basin Contour Volume i5 // (ft) Areas (sf) (cf) 6p0ii'/ j/ / i/� 586 2194 h° I Ili r i 606 / / 6 / 588 2619 .4 / 61 590 3406 0 111-III BCJILS%W�D�F 6R��L'INE1J' 61 6" /APP�OVEP ��I� / EMERGENNCNSP!LLWA)�C EST _ �'' 592 4403 7,788 LOT LINEI �_JJ�1` / LEVA/MN= 0IZ05' / / LOTEOS 594 5500 17,670 IIII IIIll IY' / APP9OVEDBA NSPILLUGAYSIDE�LOPES / / 596 6698 29,849 J / d IImII-I = SF�ALL BE 4: OR FLATTER TO Pg VIDE A . / / SMOOTHYEHICUA TRANSITION ALONG / 598 7997 44,525 II III I11-I,� �� - 11= III- / I ' 11 T=I-IIII 11-I THE ACCESS ROAD &TO PRDTECTTHE / �I LINED SPILLWAY. I 600 9396 61,899 �' ILII� ITIIIII„III / / / APPROVED VARIABLE WILT I I ',WM MA & 602 10661 81,942 / APPIR VEDSWMMAINTENANCE 8dACCESS INTENANC /E( / I F:,,m/ rnINCIri1E5 WITH PROPPRTIY I IMP / -CESS ESMT. (TYP.) 602.5 11040 87,367 / TOPtEVENTfLOTAT16NTI4ERIS KBA�EAND ' ; AMENDED DETENTION BASIN 'C'(SCALE 1"=30') / BARREL CONNECTION?HALL/BE FIRMLY EMBEDDFiJ / -'FOINTO A UNDATION THATIS D8 THI ANCD/S BRETE RIE ASBUILT END WALL 8 LIMITS. APPROVED VI EW-1PC w/ VDOT #3' GGREGATE OUTLET PF w/ GEOTEXTILE FILTEF UNDERAYMENT (L=2C W2=10', D=2' MI ASBUILTU -4N" _ul l: '!,I u:/aSHRACK DLL y S THE RISER STRUCTURE. RISER <UCTURL.._vI ELEV.=599-75 597.83'. ONE (1) 04" LOW -FLOW ORIFICE w/ INVERT ELEV-=canon R, ONF (i) O "MI -FLOW ORIFICE w NVERTE EV.= oTOBE SEALED ATERTI HT. CO TRACTO TO RS LONE(2)2 605 NEW 0(" LOW-F COW ORIF CIE w/IN ERTELE .-59o.00 605 ASBUIL 45' WIDE GRASS LINED EMERGENCY SPI LWAY CREST E EVATION 600.75' (3o'TOP = 600 600 E-CONSTRU TI N INSTALL THE GR DE EMB NKMEN IN ACCOR SBUILT & NOTES DETAILS RADE SHOWN N THIS SHEET. 595 595 N RIPRAP OT STD. :OARSE OTECTION 590 590 FABRIC M E=590 W 1=6', 2 N.) RCP B REEL (SB B RREL C E FIRML EMBED ED NNECTION SHALL 585 89.7 F, INV. 6" INTO AREINF REINFORCED 18'THICKC CONCRETE IN=58 .z5',INV.FOUNDATIONTHA IS8. 8. AN ISBURI D585 BELOW THE LIMITS OF THE BASIN GRADING. > > J J 2 N O � i 0 0 O p ww Cr co � M I+7 � Ir o n o p cc Ln O LO Ill O In O IJ7 O Ill W L� BELOW THE LI ITS THE/BASIN/GRA IN AS IL 36" L ULt«r' y l Talvu F'Irx S 7t'PPR VED VARI BILE IDTH SH CI S H USE ' / �� l II rrmm,, �', S � .. /COUNTYD@FINED STyC��P bll�h./ / S MMAINTFjNAN E& I / I I' AS IL 3 "C IIR N F _-- - '56z.g4'. CONTRACTORT -'SLOPES TO RE A1JsF �� _/g11�1111 I�IU�II-^O / ACCESS ESMT. COI IDES I I �)_ _ TRASHRACKS SHALL SERVE ASTF _ ALL UNDISJIRB (T�PX _ - oiIr-7�) L / / ITHI'SPE IAL LpT' I I / �O I STRUCTURE. RISER STRUCTURI L IFI( /.S.=h57.Do. / - -III-II II _ I OU DA Y(TY .) I h - I - ELEV.=56s.75'S6z.94'. CONTI II III ill 1 _ A,gJIJBUIL 10' IDE TOP OF I I I ACTIVATE/ INSTALL APPROVED ON / HIHII- \ IDULT EV 666.do' I LOW -FLOW ORIFICE w/INVERT ELE' --\�/II�I III I I I I •. �- / t APP�OVED/BASIN S�ILLWA`' I TO PREVENT FLOTATION THE RISI SIDE SLOP14S SHALI/BE 4:1 OR I I / AND BARREL CONNECTION SHP 0 / / / / / / \1==t' ATTVR TO PRO VIDE A I FIRMLY EMBEDDED 6"INTO AREIN S8 ' i / / / / \ \ \ 11111-III �SM OTH VEHYCULAR I 18" THICK CONCRETE FOUNDATIOP I I I TRANSITION 40NG TH� I _I _ I _ 7aCCESs'ROAD&TO PROT CTI 75x7.5',ANDIS BURIED BELOW TF / OF THE BASIN GRADING. THE RASS LIN D SPILLWAY. I I I 1+�0 I I y o / // / / / 5 / y / X\\...I. -1 I BUILTO 8'cL. III CP j// j//j'///'� / \\\ ) \ �I ICI I /BARREy(L• 64.9 F, \I I INV. hN-556.46', IN IS SHEET Q'R7HE SCALED IIII _ I IT '5" 555'+) SBUILT ND WAL RIPRAP_ PROFILE (TYP.) /LIMITS. APPROVED COT STD. I \ EW-1PCw VDOT# OARSE - 2 MWSE III I LIJ �IIII� \ \ I I IAGGREGAIIE OUTLET TECTIONII ( I / SE I L_ I I 11=11 I I w/GE07fEXTILE FILT FABRIC DETENTION BASIN C 557 I I -i�Ire UNDERIAYMENT(L=1 , W1=6% \ Elevation Basin Contour Volume=16, D=z' M \ _ - - I I APPROVED VAR ABLE WIDT I (ft) Areas (sf) (Cf) \ \ - - -` \ \ \ \/\c 'j / / // / I �\ \ \\l I CCESS ESWIM SMT. COINCIDES NT 550 2486 \ _ - i / / -_ \ 1 +73 �yITH'SPECIAL T' LINE: 552 2926�il \\ \ 6 \ 554 3401 \�--'/// VI11II� \ \ \ \ ioo'STR A \ \ - - � ` � � I H� \ \ \ \ -BUFFER( Y \ S 556 4200 - - _ \ 66I =1 =\ \ \ \ I --- 9� \ SBUILtl75'WIDE CIRAS LINED ` \ O ASB�I iCT RIPRAFL+PAI S. \ -1-(�_ \'`.� 557 4763 O L � \ \ \ \ � \ 1=III=11 \ \ \ \ tNAERG NCY SPIL WAY REST 558 5350 5,054 PROVED�DOT #3 COARSE \ \ \ \ \ \ \ \ \ \ \ ELE�/ATION= 64.00 AG REGATE OUTLET S) \ \ \ \ _ _ _ 11L= \ \\ 560 6603 16,985 PROTECTION w�GEOTEXTILE \ 6. \ \ \ \ _ / T=1 _ \ \ \ \ PSBU LT E D WAL &RIP AP / 562 7955 31,522 LTTR FABRICUNDER+A`LMENT S \ \ \ _ I ��\ \ \ LkMITt. APP�OVED DOTST . 77 tL=LSD=z,W=4) _ SO` �� - \ A>PPROVEDioo ID \\ AfiGREVATE /VC10T#3UTIL O10ARS TIO w/I 564 9406 48,864 GRP DED, E�A.RTF '. \ GE TEXTILE FILTER FA RIC 566 11336 69 579 \\ n� E'"O \ ll = = \ '\.� ` Q t�IND6RME(JT (L=ao.D..W- ),. 5ECIIQNA-9; TYFICAL GR.-ILPIIIC.0 DETAILS Homogeneous fill I 4' min �\ Cut off trench-4' below sutablel material Soil or rock L-----------J TYPICAL HOMOGENEOUS EMBANKMENT Perforated cc FOUNDATION DRAIN rot '-Bknket drain BLANKET DRAIN ll of grai J down Sand, Forw w foci dnIn ouOeC Rock or grovel Rock toe �:p� Drain C GS' 0 ZTTansitian filter Tronaibon filter CHIMNEY DRAIN TOE DRAIN Source: SCS 6nglneertnp, Field-4lanual Figure A -la. Homogemeom Embauknlews Iri Seepage Controls 1/2" mric plated honk attached With 3JIC �extener 2-1/8" dla. holes Isometric / 1/4- NDPB plate (.pit..") HDPF. sl holci al plastic tat, 2-1/a- hales and I/a" pl ala manufactured by Plastic Solutions Inc. or equal • tlmsa With opUcnel plate ' HDPF. structural PI.MII, WIth 2-1/B" holes and 1/4� plate Section menufeclMred by Plastic Solutions Inc. or equal 6/6- die bole O D o O o 00 0 0 aingle BMP ElevitLion orifice PLASTIC SOLUTIONS P C. Box 11 DEBRIS CAGE Tin bMer VA a001 INC. E77-877-6787 TeA,pIXAC-IdNkL<xa APPROVED DETENTION BASIN CONSTRUCTION NOTES: APPORVED BASINS A & C NOTES: i. SEE DETAIL ON THIS SHEET FOR RISER TRASHRACK/FRAME & COVER. FACILITY PLANTING SPECIFICATIONS: 2. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. 1. THE DETENTION BASINS SHALL HAVE TURF GROUND COVER SUCH AS GRASS MULCH OR SOME OTHER FORM OF A VEGETATIVE GROUNDCOVER. 3. A CONCRETE FOUNDATION SHALL BE INSTALLED ON THE RISER AS SHOWN & LANDSCAPING BEYOND THIS IS OPTIONAL AND IS NOT REQUIRED. MEETING THE MINIMUM SPECIFICATIONS SET FORTH IN THE VESCH SPEC. #3.34. 2. THE PROPOSED SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 2:1 TO REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES SHALL I GRADED SCOTT, TO PROVIDE POSITIVE DRAINAGE AT ALL TIMES TO THE RISER STRUCTURES. CD Lic, ASBUILT45' WIDE GRASS LINED 3. WOODY VEGETATION SHALL NOT BE PANTED OR ALLOWED TO GROW WITHIN 15 FEET OF THE TOE OF THE EMBANKMENT NOR WITHIN 25 FEET OF THE EMERGENCY SPILLWAY CREST PRINCIPAL SPILLWAY STRUCTURE. .d 9 ELEVATION=600.75' 4. A VEGETATED BUFFER SHALL BE PROVIDED THAT EXTENDS AT LEAST 25 FEET OUTWARD FROM THE BASINS TOP OF DAM ELEVATION. PERMANENT (io' TOP OF DAM ELEV. = 602.50') STRUCTURES (E.G., BUILDINGS, SHEDS, etc.) SHOULD NOT BE CONSTRUCTED WITHIN THE BUFFER AREA. EXISTING TREES SHALL BE PRESERVED IN THE BUFFER i'`gSlt 605 605 AREA DURING CONSTRUCTION IF AT ALL POSSIBLE. 5 THE SOILS IN THE STORMWATER BUFFER AREA ARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS TO ENSURE STABILITY THE DENSITY APPROVED SPILLWAY SIDE SHALL BE 4:1 OI TO PROVIDE A VEHICULAR TR) ALONG THE ACC & TO PROTEI GRASS LINED S ASBUILT GRADE v 600 600 45 3ASIN SLOPES FATTER SMOTH W SIOTION ESS ROAD 595 595 :TTHE 'ILLWAY. PRE- ONSTR CTION GRADE 590 590 > > N M N J J w07) CIO N r- O W L O O O O LOi OF THESE COMPACTED SOILS CAN BE SO GREAT THAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND, THEREFORE, MAY LEAD TO PREMATURE MORTALITY OR LOSS OF VIGOR. AS A RULE OF THUMB PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE ROOTBALL FOR BALL -AND -BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK. 6. AVOID SPECIES THAT REQUIRE FULL SHADE, OR ARE PRONE TO WIND DAMAGE. EXTRA MULCHING AROUND THE BASE OF TREES AND SHRUBS IS STRONGLY RECOMMENDED AS A MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS. CONTRACTOR REQUIREMENTS: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PANS. 2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS; HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PANS SHALL SUPERSEDE THOSE OUTLINED IN THE SPECIFICATIONS MANUAL (COPIES ARE AVAILABLE FOR A FEE FROM THE VIRGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS, VIRGINIA NURSERYMEN'S ASSOCIATION, INC. AND THE VIRGINIA SOCIETY OF LANDSCAPE DESIGNERS). 3. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, 1250 STREET, NW, SUITE 500, WASHINGTON, DC 20005. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PAN. 5. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY 1-800-552-7001 BEFORE ANY z EXCAVATION). O J 6. REFER TO THE APPROVED FINAL SITE PANS FOR ANY DETAILED SITE INFORMATION. Q 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 8. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK, BUDS, BRANCHES, STEMS, OR OVERALL SHAPE OF U THE STOCK. CONTAINER GROWN PANTS WILL BE TRANSPORTED IN THE CONTAINERS IN WHICH THEY HAVE BEEN GROWN. wDo 9. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PANT MATERIAL SHALL BE o Ln HEALTHY, VIGOROUS, AND FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PANT MATERIAL SHALL BE O zz J Q FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PANTS DEEMED UNHEALTHY WILL BE REJECTED. 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL. CONTAINER STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED. 5 •z-' 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS WILL BE SHADED V J � AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE BALLS OR 0+50 1+00 1+50 2+00 2+25 0+50 0+75 ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE, SIZE AND/OR QUANTITY. ANY SUBSTITUTIONS MUST BE APPROVED BY THE DESIGNER. ui 13. MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS EX: ROOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE PROFILE SCALESROVED ( ) w/ BASIN A- SECTION -5, BASIN A- SPILLWAY NOPLANTING SHLLOCCUDESIGNER. li 1„ , V 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENTTO CONTAIN THE ENTIRE ROOT BALL OR 1 =50 (H) ROOT MASS, WITHOUT CRAMPING ROOTSTOCK. 57O 57O 16. THE CONTRACTOR SHALL MAINTAIN A ONE (1) CALENDAR YEAR 90% CARE AND REPLACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD OF CARE AND REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS AND CONTINUE FOR ONE CALENDAR YEAR AIDE 65 565 (n v) 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY BASIS. 18. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR PLANT MATERIAL THAT HAS BEEN DAMAGED BY VANDALISM, FIRE, OR OTHER ACTIVITIES BEYOND THE CONTRACTOR'S CONTROL. FACILITY CONSTRUCTION 1. THE DETENTION BASINS MAY SERVE AS SEDIMENT BASINS DURING PROJECT CONSTRUCTION. IF THIS IS DONE, THE VOLUME SHALL BE BASED ON THE MORE 570 570 STRINGENT SIZING RULE (EROSION AND SEDIMENT CONTROL REQUIREMENT VS. WATER QUANTITY TREATMENT REQUIREMENT). INSTALLATION OF THE w CD NCD E RISER SBUILT 75' WIDE GRASS LINE i RIM ASBUILT EMERGENCY SPILLWAY CREST -OR TO GRADIN ELEVATION=564.00' E 3 O " O 3 - 30' TOP OF DAM ELEV. - 666.00' ( ) SBUILT T.=557.00. 560 N 560 565 GRADE 565 R BASE LL BE ONTRACTOR SHALL INSTALL TH FORCED EMBANKMENT IN ACCORDANCE THAT IS w/ THE DETAILS & NOTES= 75' E LIMITS SHOWN ON THIS SHEET. M E 557 APPROVED BASIN SPILLWAY SIDE SLOPES 555 555 SHALL BE 4:1 OR FLATTER TO PROVIDE A 560 560 MOOTHVEHICULARTRANSITIONALONG THEACCESS ROAD&TO PROTECTTHE PRE- ON TRU TI GRASS LINED SPILLWAY. GRADE ASBUILT END WALL & RIPRAP LIMITS. APPROVED VDOT STD. EW-1PC w/ VDOT#3 COARSE AGGREGATE OUTLET PROTECTION w GEOTEXTILE FILTER 1 550 1 1 550 FABRIC UNDERAYMENT(L=19', W1=6', W2=16', D=2' MIN.) 555 555 J J N Q N Q ASBUILT 038' CL. III RCP J J W W N n r L"J N r 7 BARREL (§�.564.g LF, INV. W W O O O In Ih IN=556.46', INV. OUT= t0 to Ln (D V, O Il') Ifl I"l V, 559 10 10 W LL W TOP VIEW 0+50 1+00 1+50 1+75 BASIN C- SECTION 1CTURAL A Of ft 0r0raw �� TRASH RACK ASSEMBLY ELEV. A -A NOTE: '"MCUNDNG KIT INCLUDED'• INC. P"""D 60" ROUND SERIES RACXxls 24pTRASH LS%11CC .RSP-60. awo-Tex-www (FOR 42" Canc. Riser ) PERMANENT RISER SHALL BE INITIATED DURING THE CONSTRUCTION PHASE, AND DESIGN ELEVATIONS SHALL BESET WITH FINAL CLEANOUT OF THE F ry SEDIMENT BASIN AND CONVERSION TOTHE POST -CONSTRUCTION POND IN MIND. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT 0 \ \ DISCHARGE OF TURBID WATERS WHEN THE BASIN IS BEING CONVERTED INTO AN DETENTION BASIN. 2. DETENTION BASINS SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS COMPLETELY STABILIZED. IF THE PROPOSED POND SITE WILL BE USED AS A SEDIMENT TRAP OR BASIN DURING THE CONSTRUCTION PHASE, THEN THE FACILITY WILL BE DEWATERED, DREDGED AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. 3. INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION OF THE BASIN, INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 4. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTALL THE SPILLWAY PIPE DURING THE ESC PHASE. 5. CONTRACTOR SHALL ALSO INSTALL THE RISER, OUTFLOW STRUCTURE AND/OR AND BARREL(S) DURING THE ESC PHASE TO ENSURE THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. 6. THE CONTRACTOR SHALL THEN CONSTRUCT THE EMBANKMENT AND ANY INTERNAL BERMS IN 8TO 12-INCH LIFTS AND COMPACT THE LIFTS WITH 0 J l-1 APPROPRIATE EQUIPMENT. 7. U PO N COMPLETION OF TH E EM BAN KM ENT GRADI NG, TH E CONTRACTOR SHALL EXCAVATE/G RADE U NTI L TH E APPROPRIATE ELEVATION AN D DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE BASIN. m 8. CONTRACTOR SHALL THEN CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 9. THE CONTRACTOR SHALL THEN FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES, INCLUDING DOWNSTREAM RIP -RAP APRON PROTECTION. 10. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED SOILS BY HYDROSEEDING OR SEEDING OVER STRAW. ('7 Q7 11. THE CONTRACTOR SHALL THEN INSTALL THE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PANS. N FACILITY MAINTENANCE: nlll� MAINTENANCE OF DETENTION BASINS ARE DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE FACILITIES. DURING w THESE INSPECTIONSTHE FOLLOWING TASKS SHALL BE PERFORMED BYTHE CONTRACTOR IN THE FIRSTYEAR FOLLOWING INSTALLATION, AND THE OWNER THEREAFTER: 1. MEASURE SEDIMENT ACCUMULATION LEVELS IN THE BASIN. L 2. MONITOR THE GROWTH OF THE GROUNDCOVER AND ANY TREES AND SHRUBS PLANTED, AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE. N Q O 3. INSPECT THE CONDITION OF STORMWATER INLETS TO THE BASIN FOR MATERIAL DAMAGE, EROSION OR UNDERCUTTING. 4. INSPECT THE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR Q 0+50 1+00 GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY. N 2! 5. INSPECT BASIN OUTFALL CHANNEL FOR EROSION UNDERCUTTING RIP -RAP DISPLACEMENT WOODY GROWTH ETC. 6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLING, JOINT FAILURE, LEAKAGE, CORROSION OR OTHER FAILURES.LU PROFILE SCALES 7. INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FASHBOARD RISERS FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION w Q J 1-5iV) BASIN C- SPILLWAY OR OTHER FAILURES. > Ii 8. INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE 1"=50' (H) OPENED AND OPERATED. Q 9. INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE BASIN FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING. _j Q �-- 10. OWNER SHALL MAKE NEEDED REPAIRS IMMEDIATELY. J W 1� APPROVED EMBANKMENT NOTES: AFTER AN INVESTIGATION OF THE SITE's SOILS, SITE VISITS, AN ANALYSIS OF THE SURVEYED TOPOGRAPHY AND AN EXAMINATION OF VA DEQAPPENDIXA: EARTHEN EMBANKMENT (REQUIREMENTS vs. RECOMMENDATIONS), THE APPLICANT HAS PROVIDED A COMPREHENSIVE EMBANKMENT DESIGN THAT DOES NOT NEED A GEOTECHNICAL STUDY AT THIS TIME. SUCH IS THE CASE DUE TO THE PRECAUTIONARY EMBANKMENT DESIGNS PROPOSED. A SUMMARY OF THE EMBANKMENT DESIGN REQUIREMENTS ARE LISTED BELOW, MANDATING THE CONTRACTOR MEETTHESE REQUIREMENTS ATA MINIMUM. THE EMBANKMENTS SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFF TRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN ON THIS SHEET. BERMS AND SPILLWAYS SHALL BE STABILIZED WITH EC-3 MATTING & THE REMAINING DISTURBED SLOPES SHALL BE STABILIZED WITH EC-2 MATTING. ALL BERM FILL MATERIAL SHALL CONSIST OF ML, CL, SC OR GC SOILS & BE FREE OF WOOD, ROOTS, ROCKS OR ANY OTHER NON COMPACTING SOIL. COMPACTED FILL SHALL BE PROCTOR MAXIMUM DRY DENSITY ASTM D698 AND HAVE A MINIMUM OF 95%OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL AND CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS. EW L,/PC L A`l s „ u ` I i fo FRONT ELEVATION A-eJ a4 BARS a 5' C-C MOOWAY. EACH FM NOTES 1. CONCRETE TO BE 40M PSI MINIMUM COMPRESSIVE STRENGTH. SECTION A -A 2.IF WE 6 To BE SKEWED TIE OPENING WILL BE ADJHSTED TO ACCOMMODATE ANGLES IP TO 45•. & (ENFORCING STEEL IN MCMUMCE WITH ASTN A-6M XREeFKMCNO WSI. 4. PPE OPENINGS IN PRECAST CRNNA(E UNITS WALL NET EXCEED 4 INCHES AT ANY WEN POINT BETWEEN TIE PPE MD TIE PRECAST INR. & DIMENSIONS SHOWN ME MUM. ACTUAL MEASUREMENTS MAY VARY WITH MMUFACTUIER'S TOLEHM'CE. a & IN NO CASE SHALL TOP OF EIDWAL PROJECT MOVE FILL SLOPE. DITCH SLOPE, OR SHWLOER. . 7. HEWW/LL TO BE BEVELED N Al NEAS EXCEPT WHERE A CONFLICT WITH n INVERT OR WINGW.LLL OCCUR. & ffVE1 EDGE IS REWIRED ON THE 1EMWAJL AT THE NET END OF THE CULVERT. SHWE TO HEADWALL AT CUTLET END MAY HE EITHER SQUARE EDGE CR SEMM). BEVELED WITH a MDRTM CHAFER NAY BE PAOVDEO ON ALL EDGES AT NAM.FACTURER'S OPTION. DETAIL A ENDWALL FOR CIRCULAR PIPE DWETER OF PPE CULVERT DI 12" 1 W 1 IS" 21" OR 24" 2T' CR W" 33" N M" H 2'-0" 2�_3�� 2•_6�- Y_2" 3._10.. 4._4" L W_O. Y.O. B._O.. 5. 0. 10._pr- zr. . 0 C-}/" 1 W-,1•" 1 0'-r' I o'-Y/e" 0'-9/4" 1 W-37i' b I V-T' 1 o-A/w'• 1 0•-i/'• 1 0'-2•• 1 a•-rh" 1 0-3" FACILITY INSPECTION: > MULTIPLE INSPECTIONS ARE CRITICAL TO ENSURE THE BASIN(S) ARE PROPERLY CONSTRUCTED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE U CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND LU /r \` INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR, WITH THE ENGINEER AND INSPECTOR, DURING THE FOLLOWING STAGES OF THE DETENTION � W BASINS' CONSTRUCTION PROCESS: J 1. PRE -CONSTRUCTION MEETING � 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONTROLS) O r n V3 3. EXCAVATION/GRADING (E.G., INTERIM/FINAL ELEVATIONS) N LL 4. EXTENDED DETENTION BASIN INSTALLATION (E.G., INTERIM AND FINAL ELEVATIONS) S. INSTALLATION OFTHE EMBANKMENT, THE RISER/PRIMARY SPILLWAY, AND THE OUTLETSTRUCTURE(5). Q z 6. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT) Q 7. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) DETAIL B ENDWALL FOR ELLIPTICAL PIPE 512E OF ELLIPTIC& PIPE CULVERT (SPA w RISE) 5 N D 23' w N" W" x 10•' M" w 22" M' X 24" 42• X V" 45" X 29" 4W' x 32• 5Y' X ".. H y-10" 2._4.. 2._7., 1 2`9. Y-p T-W 3,_W' 3._B.' L 1 5'-5' 1 7-2" 1 IF -a" 1 9'-2• 1 ,P-2' 1 UP-11" I 1T-1' I 11'-11" 0I 9'-2y" I 0'-3W' I a-9h" 1 W-4' 1 P- -- I 0'-4l': I O'-V' 1 a-5y2" b W-2' C-lye" I C-ZY4" 1 013" 1 C-9h•' I 0'aT7 1 014" �voQF PRECAST ENDWALL FOR PIPE CULVERTS IroAo AND BNocE sT.wDMDs SHEET , Oi 1 REVISION DATE 12" - 36" CIRCULAR AND 23" x 14" - 53" x 34" ELLIPTICAL PIPES 10,.02 VIWIMA DEPARTMENT OF TRAN5PORTATM 36" Riser StormRi3xTA' ROUND SERIES TRASH RACK CONCRETE MANHOLE STANDARD 601NCH RACK SHOWN DIMENSIONS IN INCHES PLAN SIDE VIEW StormRax^' Round Series forConaete Manhole hrtNo. DNnA DIM mme MIRID MbOD RS14 l7lj 14% 28 24 30 flSxi 23ik 14 40 36 43 uaa Y7 13 S4. a S7 ls6a 27yj 12% 6blt 60 70 °' °h" Plastic Solutions. lI1C. ADcusTO AER Sq CIFIOATIW Boa 43B5. Mr. YNsdeaNs. VA 22&M, 4' a 23e MaChee Rd. nT}aNr. VA r2605 l56410) 872.5717 phone RIDECT: 105 4q 712-2219 Mx 302 httP//wv.'w.l ac-soluam.mm ruaacar IUTMxIA EG ISOMETRIC CONCRETE STRUCTURE DIMENSIONS INSIDE STRUCTURE DIMENSION OUTSIDE STRUCTURE DIMENSION AVAILABLE GROSS BRACING FOR OVERHNING HOPE ANn-VORTEX PLATE DATE Dwu'm6r_ Ai W: DETAIL 1 U) III w Y > Uj U) O NwLli U) LL J�0 LIJ J L/ W 0 O LU y N U �w J U ~ 0 w Lu Of U) JOB NO. 132091 SCALE AS SHOWN SHEET N0. 10 l I I l I , I I DRAINAGE PLAN FOR THE LOTS 8 & 9 SIDE YARD SWALE SCALE 1"=50' --- II -- / \ 1 I I zr-`sX L \\ Cb 4J I I / 0,/ `� / i / . WITWTHIS AMENDMENT- -J/ /gt� / �I 4w II J II 0� v 01VERLgND FLOW Tc PATH, PRIOR) \/ / . TO.CO CENTRATED/FLOW WHERE _TC-fS NEGLIGIBLE. OLLF Tc= 13 min!' / \ / C� / (185' CFDLFAW 4 ELEV. -11F)I o� / �ASBUILT CUL ERT ASSOCIATED +00� CONTRACTOR SHALL VERIFY, AND IMPROVE IF 91 / FOUND NECESSARY, THAT THE EXISTING i RIPRAP CHANNEL HAS A d50 STONE DIAMETER . EQUAL TO OR GREATER THAN VDOT CL. AI i RIPRAP WITH A TOTAL STONE DEPTH OF 18". 1+00 PROPOSED�IDOT STD. Cam. of RIPRAP,(18" STONE-DEPTH)- LINI`D DRAINAGE SWALE TO)3t LOCAT9�1"ALONG THE ♦\ \ i i - _ PROPERTYGLfNE BETWEEN LOTS $ 819, AS SHOD! RIPRAP T61NCLUD"-FILTER FABRIC UNDERLL AYMENT LOT 9__- / / yBAREA TO SWALE-BETWEEN LOTS.8-8r96 8 Z.32 ac, Cw=0.35,-Tc�13 min. / 2tOb /// /// ./ -L6T 8 690 D=1.00 / / � / / � / / / / / •lJ - 3;� � t \. 6g0 i � � it - - - - / /PROPOSED 70'-WIDE CIRAINAGE-EASEMENT�CEFITERED'6N TH \ 3+-O0' / LOTS 8 &,9 SHARED PROPERTY LINE. A PORTION OF�THE -J / /EASEMENT EXTENDS INTO THE -RURAL PR"RVATIgN-tRACT. PROPOSED RIPRAP LINED SWALE TO OUTFALL INTO A PROPOSED CHECK DAM. - \ PROPOSED CHECK DAM TO BE CONSTRUCTED OF VDOT #1 COARSE" AGGREGATE & CL. I RIPRAP WITH A FILTER FABRIC UNDERLAYMENT. SEE THIS - - - •/ - - - / SHEET FOR DETAIL. CHECK DAM TO INCLUDE A 2' WIDE TOP OF DAM & 2:1' '_ _ •� SIDE SLOPES, AS SHOWN. CHECK DAM WILL CREATE A SMALL DEPRESSION/ - / PLUNGE POOL AT THE END OF THE SWALE TO DISSIPATE FLOWS BEFORE THEY _- / OVERTOP THE CHECK DAM AND ENTER THE EXISTING DOWNSTREAM CHANNEL. EXISTIN�G-CHANN\EL, TOI REMAIN\TO AC EPT RUNOFF\ FRO�Q PRO Os \ \ \ RIPRA 1 LINED\SWAL & CHECKRM. v\ RURAL �RESEI�VATIOL,1 I \ \ \ \ \ \ \ r A Cr / c�7 1992 ROCK CHECK DAM 1 STRAW BALE BARRIER FAKED Alt) DVIIOCIRO MHXNC ww STIV6' WE OR MIKE wNPACrEo mA m WIMC ( ( / wcwrt c F1LlERNOiF� 1 j t11) ED PU,,,� unu PROPERLY INSTALLED STRAW BALE (CROSS SECTION) 1. EXCAVATE THE TRENCH. 2. PLACE AND STAKE STRAW BALES. 3. WEDGE LOOSE STRAW BETWEEN BALES. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. CONSTRUCTION OF STRAW BALE BARRIER Some: Va. DSWC Plate 3.04-1 ESC LEGEND STRAW BALE BARRIER PER VESCH 3.04 SILT FENCE PER VESCH 3.05 0L RIPRAP PER VESCH 3.19 ROCK CHECK DAM PER VESCH 3.20 / PS PERMANENT SEEDING PER VESCH 3.32 „f'1(Opp \ \ -' THE (MINOR) EXCESS EXCAVATED DIRT FROM THE CONSTRUCTION OF THE SWALE IN CUT SHALL BE SPREAD EVENLY ON EITHER UNDEVELOPED LOT 8 OR 9. EXCESS DIRT SHALL BE SPREAD SUCH THAT IT HAS POSITIVE DRAINAGE THROUGHOUT WITHOUT PONDING, AND IS GENTLY SLOPED i i \ NOT CREATING A MOUND. THE EXCESS DIRT SHALL BE IMMEDIATELY LOT 9 - -= ' STABILIZED WITH PERMANENT SEEDING. SEE DETAIL ON WPO 201600034 .I APPROVED SHEET 3 FOR PERMANENT SEEDING. ALTERNATIVELY, THE - - FOR THE CONSTRUCTION OF LOTS 8 & 9's SIDE YARD' \ \� CONTRACTOR MAY ELECT TO TRANSPORT THE EXCESS DIRT TO AN SWALE, THE CONTRACTOR SHALL UTILIZE EXISTING �\ \ OFFSITE LOCATION THAT HAS AN APPROVED ACTIVE CGP. GREENLOFT FARM CT. FOR ACCESS & PARKING. THE i \ \ / / / / ' CJ 0 CONTRACTOR SHALL LOAD & UNLOAD CONSTRUCTION+/LOT 8 / EQUIPMENT ON LOTS 8 OR 9 TO MINIMIZE THE RISK OF - TRANSPORTING RUNOFF ONTO EXISTING GREENLOFT CT. & OTHER LOTS. PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY (VEHICULAR) TRACKING ONTO THE PAVED SURFACES. WHERE SEDIMENT IS - TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD _ i "I" SHALL BE CLEANED THOROUGHLY AT THE END OF EACH - - DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY \ 68 R - - _ - SHOVELING OR SWEEPING AND IT SHALL BE TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. 0 STREET WASHING SHALL BE ALLOWED ONLY AFTER / + 67 - SEDIMENT IS REMOVED IN THIS MANNER. � � � / /\ / THE DISTURBANCES ASSO�ATED WITH T� / ' / ' � � CONTRACTOR SHALL INSTALL FILTER /COfyS'FRUCTION O LOTS 8-& 9 sSIDE YARD SWALEARE / \ _ FABRIC UNUERLAYMENT, RIPRAP AND COVERED -UNDER T E PREVIOUSLY APPROVED CGP. / \ PERMANENT SEEDING IMMEDIATELY - +-muov ING THE CHANN-EL's GRADING RRORO.S€DBE-MPORA;RY SILT F�C-E, SEE 10 / \ - -OPERATIONS TO MINIMIZE THE RISK_ -DETAIL AN-WP.Q 201600034-APPROVED SHT. 3: F / / / \ \ OF SILT DEPOSiFS-DOW{'!-STREAM- / OPOSED PERMANENT- CK CRECK DAM _ DOWNS PE AF-PROPOSED DISTURBA ES &SWALE EETiiIS ET FOR DESIG - / PROPOSED AKY STRAW -GALE T / BARRIER DOWNISLOPg� PROPO _ c� / DISTURBANCES. SEE DETAIL ON -THIS- SHEET. - EROSION & SEDIMENT CONTROL PLAN FOR THE LOTS 8 & 9 SIDE YARD SWALE \ � \ SCALE 1 =50 \ EXISTING GRAN N�L, TO REfQAIN TO 1 AC'�EPT RRUNOFF\ FROi� PRO OSD RIPRAP LINED,SWALE& CHECK�M. \ \ \ WW W Lei PRE-C GRADE NSTRUC ION 710 V 710 \ \ ASBUIL GRADE EX. '� PR POSED RIPRAP IPRAP 705 1 705 ROPOS D GRAD 700 700 PROPOS D VDOT STD. CL. Al RIP P (18" D=1.00' STONEDEPTH) L NED DRAINAGE S ALE TOI BE ILOCATEI I ALONG ITHE PRO DERTY LI 4E BETWEE 4 LOTS 81 & 9, AS 5HOWN. RIPRAP IO RIPRAP INCLUD A FILTE FABRI UNDERLAYMENT 695 695 Nrs Q,=3.00 CFS ,o- V,=4.70 FPS S =19.0% D,-0.46 FT D,o 151 F7 D=1.00 9' RIPRA 690 690 N IS 3.90 CF Q,-3. O CFS Q," V,=3. 3 FPS S 9.5% D,-0. 3 FT D," 0.58 FT 685 685 680 680 675 D=1.00' 675 3 RIPRAP NTS 0z 3.0 CFS Q,a 3.90 CFS V,=4.51 FPS S - 7.0% 670 D,-0.4 FT D,o 3.52 FT 670 665 Em 665 660 660 655 655 \ 650 650 3 3. 645 R/ P 645 Q, 3.00 CFS Q,o 3.90 CFS V, 5.05 FPS S =23.GX D, 0.45 FT D„ 0.49 FT 640 1 1 1 1 640 635 635 PROPOE ED RIPP,%P LINED SWALE O OUTF LL INTO A PROP SED CHECK DAM. PROPOSED CHECK DAM TO BE C NSTRU ED OF DOT #1 COARSE AGGREC ATE & CIL. I RIP P WITH N FILTER FABRIC UNDERLAYMENT. EE THIS IL. C E INCLUDE ' SIDE SLOPES, A SMALL DEPRESSION/ AS SHOWN. CHEC DAM WILL CREATE PLUNGE POOL AT THE EN OF THE SWALE TO DISSIPATE FLO S BEF RE THEY 630 VERTO THE CH CK DAM AND EN ER THE EXISTIN DOWN REAM HANNEL. 63O r Inr 0 r N 0 CD r r 0) 19 N r7 (V 00 (0 0 0 0 c0 00 0 O r ID 0 0 N N (D m � 0 N L j 0LIDu� 0 (0 t mto ^ 0D N n n M 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+CH1H13 LOTS 8 & g SIDE YARD SWALE PROFILE SCALES 1"=5' (V) 1"=50' (H) OTT IR. CMLI Lic. No. 35791 9/9/20 0 J 2 k Z O 0 Z 0 J I Z .. W ce L9 M TIM, l� ti M M N 7 ® M Lu N O Q Wiz N N W W > 2: Lu Q J �z� J Sao 0 O Lu J Q z U) U � Lu W Y z Lu L--i ul cf) LLI W LL co LL J�0 0 J J�z Q W O - (./ w u Lu J r Lu O 0- a w _ 1n JOB NO. 132091 SCALE AS SHOWN SHEET NO. 10A Q