Loading...
HomeMy WebLinkAboutSDP202000054 Correspondence Final Site Plan and Comps. 2020-09-21® COLLINS ENGINEERING September 21, 2020 Chris Perez Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Sleep Number (SDP 2020-00054 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434.293.2813 FX www.coll ns-eng ineeri ng.com Thank you for your comments dated August 19, 2020 on the above referenced project. Below are our responses to the remaining comments on the road plans. Planning: 1. Comment previously addressed. 2. Comment previously addressed. 3. Comment previously addressed. 4. Comment previously addressed. 5. Comment previously addressed. 6. Comment previously addressed. 7. The comments have been addressed as followed: A. Acknowledged. The Deed book/ page information will be added once the plat is recorded. I. Acknowledged. The Deed book/ page information will be added once the plat is recorded. ii. Acknowledged. The Deed book/ page information will be added once the plat is recorded. Also, text has been added to sheet 4 for the information on the Deed book and page. B. Acknowledged. The VSMP plan has been resubmitted for approval. C. Acknowledged. The ARB plan has been resubmitted for approval. 8. Comment previously addressed. 9. The right of way dedication plat is currently under review for approval at the county. The right of way has also been updated as requested in comment #12 below. 10. Acknowledged. As discussed on August 20th and August 21n with Albemarle County planning, the parcel can be subdivided as shown on the site plan. The subdivision must occur after the approval of the final site plan. The site plan shows the proposed subdivision and associated easements, and the subdivision plat will be processed after the site plan is approved. 11. Comment previously add r. 12. The 14' shared use path is shown on sheet 3 and labeled, per the requirements of the ZMA. The streetscape has also been updated to provide the requested 8 foot utility buffer strip between the curb and the pathway, and a 3' clearzone between the pathway and the right of way. 13. Acknowledged. VDOT has approved the entrance, but it also must go through a formal variation request. This request has been submitted for review. But the application may not be necessary at this time. 14. This comment is acknowledged. 15. The parking and access easement is part of the plat being reviewed for the SW M easements and drainage easements. This plat will be approved and recorded, prior to site plan approval. 16. The sight line is located within the right of way, as shown on sheet 3 and sheet 4. No offsite easements are necessary. Fire/Rescue: 1. No objections VDOT: 1. An AM-E has been submitted to VDOT for the entrance for review and approval. 2. The right of way has been updated for the 8' buffer and 3' clear zone along the frontage of the property. Engineering: 1. It is acknowledged that the WPO must be approved prior to final site plan approval. The WPO is under review. 2. Comment previously addressed. 3. Comment previously addressed. ARB 4. Acknowledged. The temporary grading and construction easements are shown on sheet 3. The easements will be recorded prior to final site plan approval. 5. Comment previously addressed. 6. The SWM facility has been added to sheet S of the site plan. It is also shown on the VSMP/WPO plans. The elevation of the 100 year storm event for the SWM basin stops at the property line, as shown with the spot shots on the grading plan and the SWM plan. On the adjacent property is an offsite grading and drainage easement over this area for the run-off to drain from the entrance road to the SWM facility. This easement is also shown and labeled on Sheets 3 and S. 7. The shrub has been removed from the riprap area. 8. Comment previously addressed. 9. The sidewalk is fully within the VDOT right of way, see sheet 3. 1. The developer is working directly with ARB for the review and approval of the project. This plan set addresses the ARB comments, and the site plan will be submitted directly to ARB with the building updates for review and approval. ACSA 1. ACSA is ready to approve the project, pending RWSA approval of the connection. Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com. Sincerely, Scott Collins, PE