HomeMy WebLinkAboutWPO201400084 Correspondence 2020-08-04Pursuant to 9VAC25-870-55, I hereby certify that to the best of my knowledge and belief the stormwater management facilities shown on these record drawings have been constructed in accordance with the approved plans and specifications. Jeremy M. Lynn Name Lic. No. 043041 Virginia License gnature August 4, 2020 Date "Certify means to state or declare a professional opinion based on sufficient and appropriate onsite inspections, material tests, as -built survey data, and information provided by other professionals and the contractor, conducted during or after construction. ELEV OF 364.0 BIORETENTION SOIL LAYER 3' PEA GRAVEL LAYER " 1' ` STONE LAYER 1• CONNECnON TO 6" PVC PIPE 6" SOLID PVC PIPE. CAPPED (PLACE 1' ABOVE SOIL ) - Tr CONNECTION DIAMETER PERFORATED UNDERDRAIN 1X SLOPE LONGITUDINAL CROSS SECTION NOT TO SCALE IN .51 k/ SITE NCE -1, E T r GR 400 390 370 360 7 9+75 350 0 20 40 60 GRAPHIC SCALE: 1 "= 20' HORIZ. Albemarle County DESIGNED: Service Authority DRAWN: Serving ♦ Cwsemnq CHECKED: r' ELEV OF 364.0 THE THE E XIS SHOULD D TIED INTO THE EXISTING GROUND wrrH AT LEASr 2' OF GROUND ABOVE THE GEOTM E GEOTEXTILE (ALONG CROSS SECTION NOT TO SCALE D GROUND 365.0 Fr GEOTEXnLE (HANG SIDES) DIAMETER PERFORATED UNDERDRAIN DEPTH VOID RATIO VOLUME (FT3) SURFACE STORAGE 1 1 338 BIOSOIL 3 0.25 253.5 GRAVEL 1 0.4 135.2 TOTALSTORAGE= 726.7 0.5' GRASS SWALE TYPICAL CROSS SECTION NOT TO SCALE 0 O TAX MAP 093A1-00-00-00400' RIVANNA VILLAGE LLC 36` �D;B. 4375, PG. 410) Z9�' \ 3 S V �0 RO -S 10 �- \ `DET L, THIS EET� \ �\ \ � ) CEPHALANTHUS \\ C�IDENTALIS/BUTTON �1 \ USi - �� 8 S.Y. CLASS I D RIP AP 368 \ 20) BLCKIA W/ F'FLTER F RIC "`������ A LACI(-EYED UNDERLI�ING BE AD TO DRAIN1, S TOWARD StRASS SWAL ♦ 37o \ PUMP TATIO \ B RETE ION \ FACILI Y OU NE \ I V. IN= 4 ;1• A SE CRO S SECTI N DET lLS, IS SHE � A { �� 12" DI,P WATER "1 �' DISCHARGE LINE 8„ CO C. 41. .: CORM PIPE STA. 0+ Q ±" 4 LF 2.2% SLOPE DROP .I i w 'e �.. 6 PVC _ Y BIORETENTION DRAIN PIPE O11T �4 ' EXTEND TO DAYLIGHT s j \ TAX MAP 093A1-00-00-00200 STA. 1 +24 STA. 1 +68 EAST RIVANNA VOLUNTEER STORM \ INV. OUT=366.5 18" CONC. STORM FIRE CO. INCORPORATED WATER MANHOLE v PIPE #3501 STEAMER DRIVE RIM-370.5 \\ 13 S.Y. / 124LF @ 2.2% SLOPE (D.B. 1204, PG. 201) INV IN=367.0 \ CLASS DRY RIP RAP SCALE: INV. OUT=366.9 \� �\ 12'9UN THICK W/, FILTER FABRIC / 1"=20' HORZ:, �\ UNDERLINING STORMWATER MANAGEMENT AND PLANTING PLAN 400 011 AGE', TANK LLJ J z�m CL O of o O) M M �_ > z - PROP Of O N LJ GRADE O I� iD O �(0QD (o M M l i M Z_ I- H - > ? :> > Z z_ GRADE EIVD WALL VDUI LW-138 13 S.Y. CLASS I DRY RIP RAP 12" THICK 'W/ FILTER FABRIC NDERLININ ' 39 37 36 -PROP -- ------- x. Grade - - -_- _ _ ------- 18' STORM ------- CONC. PIPE 18" CONC. STORM PPE 20LF @ 2.2% SL PE M + O O + 0 20 40 60 ZMC JLB GDG 1 12-5-19 RECORD DRAWINGS NO. DATE REVISION 80 100 20 40 60 STORMWATER PROFILE N0. DATE 80 200 REVISION 1 J 1 1 350 STORMWATER COMPUTATION AND BMP CALCULATIONS OUTFALL THE NATURAL TOPOGRAPHY OF THE SITE DROPS OFF IN THE SOUTH DIRECTION. THE RELATIVELY SMALL FLOW RATES EXPECTED FROM THE UNDERDRAIN AND THE EMERGENCY SPILLWAY (DURING INFREQUENT STORM EVENTS) SHOULD NOT RESULT IN EROSION OR ANY OTHER DOWNSTREAM ISSUES. A SOLID POLYVINYL PIPE WILL CONNECT THE PERFORATED UNDERDRAIN PIPE TO THE OUTFALL LOCATION. VEGETATED EMERGENCY SPILLWAY THE PEAK FLOW RATE TO THE BIORETENTION AREA IS APPROXIMATELY 1.1 CFS DURING THE 100-YR OR 1-PERCENT-ANNUAL-CHANCE STORM EVENT. WHEN THE DEPTH OF WATER ABOVE THE BIORETENTION AREA REACHES 0.5-FT, THE EMBANKMENT ON THE WEST SIDE OF THE BIORETENTION BASIN WILL ACT AS A SPILLWAY ALLOWING WATER TO SPILL OVER THE SIDE AND DOWN THE EXISTING HILL. NO STRUCTURES ARE FOUND IN THE IMMEDIATE AREA DOWNSTREAM OF THE EMBANKMENT. GRASS SWALE TWO GRASS SWALES SHALL BE CONSTRUCTED TO CONVEY WATER FROM THE IMPERVIOUS AREAS TO THE BIORETENTION AREA. THE SWALES ARE SIZED FOR THE 10-YR OR 10-PRECENT-ANNUAL-CHANCE STORM EVENT AND WERE ANALYZED USING THE FLOWMASTER PROGRAM. THE MINIMUM DIMENSIONS ARE AS FOLLOWS: BOTTOM WIDTH = 0.5 FT TOP WIDTH = 3.5 FT DEPTH = 0.5 FT SIDE SLOPES = 3 TO 1 PLANT AND COMPOSITION SCHEDULE BIORETENTION SIZE ( acres) : .008 AC (338 SF/13'x26') OVERALL SPACING (FEET OFF CENTER) QUANTITY PER ACRE FREQUENCY I %) SPECIES QUANTITY BOTANICAL NAME COMMON NAME UNIT 10 520 17% 4 CEPHALANTHUS OCCIDENTALIS BUTTONBUSH 30"HT. 2 2600 83% 20 RUDBECKIA HIRTA BLACK-EYED SUSAN QT. NOTES: 1. CLUSTERING AND ARRANGEMENT OF THESE SPECIES TO BE COORDINATED WITH ACSA STAFF. 2. PLANT SPECIES ARE PER THE ALBEMARLE COUNTY RECOMMENDED PLANTS LIST. Virginia Runoff Reduction Method ReDevelopment Worksheet - v2.8 - June 2014 Site Data Summary Total Rainfall = 43 inches Site Land Cover Summar y Forest (acres) Turf (acres) Impervious (acres) A Soils B Soils C Soils D Soils 0.00 0.00 0.00 0.00 0.00 0.35 0.00 0.00 0.00 0.09 0.00 0.00 Site Rv 0.35 Post Development Treatment Volume (ft3) 547 Post Development TP Load (lb/yr) 0.34 Post Development TN Load (lb/yr) 2.46 Total TP Load Reduction Required (lb/yr) 0.28 Total Runoff Volume Reduction (R3) 452 Total TP Load Reduction Achieved (lb/yr) 0 Total TN Load Reduction Achieved (lb/yr) 2.33 Adjusted Post Development TP Load (lb/yr) 0.02 Remaining Phosphorous Load Reduction (Lb/yr) Required 0.00 Drainage Area Summary Update Summary Sheet Pri nt Total % of Total 0.00 0.00 0.35 80.33 0.09 19.67 0.43 100.00 RECORD DRAWING THIS DRAWING HAS BEEN REVISED TO SHOW ALL KNOWN CHANGES MADE DURING CONSTRUCTION AND REFLECTS TO THE BEST OF OUR KNOWLEDGE THE FACILITIES AS CONSTRUCTED Michael Baker DATE 1Z/o61ZO19 BY 2'ZI D.A. A D.A. B D.A. C D.A. D D.A. E Total Forest (acres) 0.00 0.00 0.00 0.00 0.00 0.00 Turf (acres) 0.35 0.00 0.00 0.00 0.00 0.35 Impervious (acres) 0.09 0.00 0.00 0.00 0.00 0.09 0.43 Drainage Area Compliance Summary D.A. A D.A. B D.A. C D.A. D D.A. E Total TP Load Red. (lb/yr) 0.32 0.00 0.00 0.00 0.00 0.32 TN Load Red. (lb/yr) 2.33 0.00 0.00 0.00 0.00 2.33 DRAINAGE SUMMARY TABLE STRUCTURE NUMBER DESCRIPTION LENGTH INVERTIN INVERT OUT SLOPE REMARKS 1 DI-7 N/A N/A 369.5 N/A 4' MANHOLE 2 18" RCP, CLASS III 124' N/A N/A 2 N/A 3 MANHOLE N/A 366.5 366.4 N/A 4' MANHOLE 4 18" RCP, CLASS III 56' N/A 365.5 4 N/A 0 10 20 30 GRAPHIC SCALE: 1 "= 10' VERT. J U LY 2017 272 BENDDC ROAD, SUTI'E 400 GLENMORE GROUND STORAGE TANK, PUMP STATION, AND WATER MAIN PROJECT (PROJECT N0. 2013-04) VHZGINIA BEACH, VA 23452 TAX MAP SHEET PHONE: 7)463-0503 0 INTERNATIONAL FAX: (757) 463-0503 STORMWATER MANAGEMENT PLAN AND CALCULATIONS °079' SW 1