HomeMy WebLinkAboutWPO201700031 Correspondence 2019-06-27VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR OFFICE USE ONLY
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM ID Number:
CONSTRUCTION ACTIVITIES (VAR10) Technical Criteria: Ila ❑ IIC ❑
REGISTRATION STATEMENT 2019
NEW ISSUANCE ❑
MODIFICATION WITH ACREAGE INCREASE ❑
Existing Permit Coverage Number (If applicable,
Section 1. Operator/Permittee Information.
RE -ISSUANCE IR
MODIFICATION WITHOUT ACREAGE INCREASE ❑
VAR10I239
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have
operational control over construction activities to ensure compliance with the general permit. A person with
signatory authority for this operator must sign the certification in Section VI. (per Part III. K. of the VARSO Permit).
Construction Activity
Operator Name:
Contact person:
Address:
University of Virginia Foundation
P O Box 400218
City, State, Zip code: Charlottesville, VA 22904-4218
Phone Number:
Primary Email:
(434) 911
cschooley@uvafoundation.com
CC Emaill: fmissel®uvafoundation.com
B. Billing Information (leave blank It some as the Operator Identified In Section I. A, above). This entity will receive
Annual Permit Maintenance and Permit Modification Fee Invoices (If applicable).
Name:
Contact Person:
Address:
City, State Zip Code:
Phone Number.
PrimaryEmail:
CC Email:
C. May we transmit correspondence electronically? You must choose JUand include a valid email in order to pay by
credit card and to receive your permit coverage approval letter via email:
YES IX NO ❑
Rev 04/2019
PAGE 1 1 7
31
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section II, Construction Activity Location Information. Project site Information.
A. Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land
disturbance, construction entrances and all water bodies receiving stormwater discharges from the site.
UVA Indoor Golf Practice Facility
B. Construction Activity Name:
Address:
City and/or County and Zip Code:
Latitude and Longitude
(6-digit, decimal degrees format):
C. Construction Activity Entrance Location
(description, street address and/or
latitude/longitude In decimal degrees):
Charlottesville, VA 22903
0q(01 "V—?8.5381
Route 250 Boar's Head Drive
Section Ill. Offsite Support Activity Location Information. List alloffsite support activities to be Included under this
permit registration. Enter additional areas on a separate page. Offsite areas not included on this registration may need
to obtain coverage under a separate VPDES permit.
A. Offsite Activity Name:
Address:
City and/or County and Zip Code:
Latitude and Longitude
(6-digit, decimal degrees format):
B. Offsite Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
Section IV. Site Information.
A. Acreage totals for all land -disturbing activities to be Included under this
permit coverage. Report to the nearest one -hundredth of an acre.
Total land area of development (including the entire
in the Stormwater
4.06ac
area to be disturbed as approved
Management Plan):`2
Primary estimated area to be disturbed (portions with
ac
Erosion and Sediment Control Planapproval only):
�o
Offsite estimated area to be disturbed (if applicable):
C. Property Owner Status:
D. Nature of the Construction Activity Description (i.e.
commercial, Industrial, residential, agricultural,
environmental):
E. Municipal Separate Storm Sewer System (MS4)
name (if discharging to a MS4):
B. Estimated Project Dates
(MM/DD/YYYY)
Start date:
12/31 /19
Completion date:
FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE CX
Commercial
11171
Rev 04/2019 PAGE 2 17
GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
F. Is this construction activity part of a common plan of development or sale? YES ❑ NO CK
G. 6' Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Attach a separate list if needed.
HUC RECEIVING WATERBODY(S)
02080204 Rivanna
Maoes�s C
Section V. Other Information.
A. A stormwater pollution prevention plan (SWPPP) must be prepared In accordance with the requirements of the
General VPDES Permit for Discharges ofStormwater from Construction Activities orlor to submitting the Registration
Statement. By signing the Registration Statement, the operator Is certifying that the SWPPP has been prepared.
B. Has an Erosion and Sediment Control Plan been submitted to the VESCP Authority for review? YES II 0
Erosion and Sediment Control Plan Approval Date (for estimated area to be disturbed).: /1 2B
C. Has land disturbance has commenced? YES IN NO ❑
D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity
Form. AS&S Entity Name (if different from the Operator identified In Section If. A.):
SEE THE FOLLOWING PAGE FOR SIGNATURE
AND CERTIFICATION REQUIREMENTS AND INFORMATION
Rev 04/2019 PAGE 3 17
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section VI. Certification. A person representing the operator as identified In Section I. A. and meeting the requirements
of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that
operator is defined In 9VAC25-870-10 as follows:
"Operator" means the owner or operdtorsif any facility or activity subject to the Act and this chapter. In the context of stormwater
associated with a large orsmall construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: (i) the person has direct operational control over construction. plans and specifications, including
the ability to make modifications to those plans and specifcations or (il) the person has day -today operational control of those
activities at a project that are necessary to ensure compliance wither stormwdter pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (I.e, they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
9VAC25-880-70. Part III, K. Signatory Requirements.. Registration Statement. All Registration Statements shall be signed as follows.
a. Fora corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate of er
means:.(1) a president secretary, treasurer,or vice-president of the corporation in charge of a principal business function, or
any other person who performs similar pollcy-making or decision -making functions for the corporation; or(11) the manager
of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility Induding having the explicit or implicit duty of making major
capital Investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate Information for state permit application requirements; and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures,
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
c. Fora municipality, state, federab or other public agency: by either principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a pubkc agency Includes: N the chief executive officer of the
agency or (11) a senior executive officer having responsiblgty for the overall operations of a principal geographic unit of the
agency.
Certification- "I certify under penalty of law that I have read and understand this Registration Statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the Information submitted. Based on my Inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the Information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including the possibility of fine and imprisonment for knowing violations."
Printed Name:
Signature (signed In ink):
Date:
Section VII. Submittal Instructions. Submit this form to the Virginia Stormwater Management Program (VSMP)
Authority. If the locality is the VSMP Authority, please send your Registration Statement submittal directly to the
locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authorityplease send to: If the locality is the VSMP Authorityplease send to -
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 110S
Richmond VA 23218
constructiongudadea.virginia.gov
Rev 04/2019 PAGE 4 7
u
DRAWING INDEX
GENERAL
TI.01 COVER SHEET
CIVIL
C2.01
GENERAL NOTES
C2A3
SOAUBMAP
C&DI
DEMOLITION PLAN
C3.02
DEMOLITION PLAN
C4.01
ROADWAY PLAN -STA, 1C+DD TO 15+25
C4.02
ROADWAY PLAN -STA. 18+25 TO 22+00
C7.01
GRADING AND DRAINAGE PLAN
C7.02
GRADING AND DRAINAGE PLAN
O&DI-CBA2
EROSION AND SEDIMENT CONTROL PLAN - PHASEI
C8.03-C8.04
EROSIDN AND SEDIMENT CONTROL PLAN - PHASEU
DUE
EROSON AND SEDIMENT CONTROL NOTES
C9.01
SWM NARRATIVE AND CALCULATIONS
C9.02
PRE AND POST DEVELOPMENT LAND USE MAPS
C9.03
WATER QUALITY NARRATIVEAND CALCULATIONS
C9.04
CHANNEL PROTECTION MAPS A CALCULATIONS
C9.05
CNWNMELPROTECTION ROUTINGS
CoAs
FLO0O PROTECTION MAPS
C9.07
FLOOD PROTECTION CALCULATIONS A ROUTINGS
C9.08
STORMSEWER MAPS AND CALCULATIONS
C8.09
DITCH MAPS AND CALCULATIONS
C9.10
CULVERTMAPS AND CALCULATIONS
C10.01
CONSTRUCTION DETAILS
PROJECT ZONING DATA
ALBEMARLE COUNTY ZONING CLASSIRIGNU N: R-1 RESIDENTIAL
PROPOSED BUILDING MAXIMUM HEIGHT: WA
PROPOSED BUILDING MAXIMUM FOOTPRINT. NIA
ALBEMARLE COUNTY MAGISTERIAL DISTRICT. SAMUEL MILLER DISTRICT
FEMA FLOOD INSURANCE RATE MAP: ZONEDC NOT WITHIN A FEMA DEFINED
1DD YEAR FLOOD PLAIN
PROPERTY NOT WITHIN AN ALBEMARLE COUNTY AND I OR CITY OF
GRARLOTTESVILLEWATERSUPPLYWATERSHED
CODES
VDOT ROAD AND BRIDGE STANDARDS, 2010
VDOTROAD AND BRIDGE SPECIFICATION%2010
FEDERAL HIGHWAY ADMINISTRATION MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, 2009
VIRGINIA SUPPLEMENT TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, 2013
VIRGINIA WORKAREA PROTECTION MANUAL, REV, 1A 2015
DEPARTMENT OF ENVIRONMENHA OUALIIY VIRGINIA EROSION AND SEDIMENT CONTROL
H4NDBOOK-1992
ADASTAN114RD4201D
CONTACTS
OWNER:
ENGINEER:
UnlvarNlV olWrpinle Fowde90n
Doebsiry Egln sInc.
OWNER REPRESENTATIVE
ENGINEER REPRESENTATIVE:
Chdelopher D. 309o9Y
MaWh C. Thomas, PE
Real Eslels Project Manager
PmjecL Manger
One Scene Head Pdnle
4B05 Lake Brook Drlve, Su0e 2DO
Chedo0"Alls, VA 229D3
Glen Alkn,VAM3
PH: (434)982-3777
PH: (804) 20 -W0
cde?@mervloesvhgMla.edu
m Ames@Eenberry.com
SUSMITTAL SET NUMBER
❑ PRELIMINARY ❑ CONSTRUCTION
❑ APPROVAL ❑ REVISION
0 BIDDING 0 RECORD
LOCATION MAP
BOARS HEgp
INN
IVY RD
UNIVIE\
F
J
f5"